Invention Grant
US08402909B2 Production facility and production process for hot dip galvannealed steel plate
有权
热镀锌合金镀锌钢板的生产设备和生产工艺
- Patent Title: Production facility and production process for hot dip galvannealed steel plate
- Patent Title (中): 热镀锌合金镀锌钢板的生产设备和生产工艺
-
Application No.: US12440177Application Date: 2007-10-03
-
Publication No.: US08402909B2Publication Date: 2013-03-26
- Inventor: Hajime Onozawa , Yoshitaka Kimura
- Applicant: Hajime Onozawa , Yoshitaka Kimura
- Applicant Address: JP Tokyo
- Assignee: Nippon Steel & Sumitomo Metal Corporation
- Current Assignee: Nippon Steel & Sumitomo Metal Corporation
- Current Assignee Address: JP Tokyo
- Agency: Birch, Stewart, Kolasch & Birch, LLP
- Priority: JP2006-280593 20061013
- International Application: PCT/JP2007/069784 WO 20071003
- International Announcement: WO2008/044716 WO 20080417
- Main IPC: B05C13/00
- IPC: B05C13/00 ; C23C2/28 ; C23C2/00

Abstract:
The present invention provides a production facility of hot dip galvannealed steel plate able to produce hot dip galvannealed steel plate on production conditions optimal at all times despite rapid changes in the steel type, plating deposition, and other external factors, wherein the production facility 1 of hot dip galvannealed steel plate is provided with a soaking/cooling furnace 7 for treating steel plate I running after leaving a rapid heating furnace 6 by at least one of soaking and cooling. Further, the soaking/cooling furnace 7 is configured to enable a change of the ratio in the furnace of the soaking region 15 for soaking steel plate I by soaking means 21 at a soaking temperature of 500° C. to 650° C. and the cooling region 16 for cooling the steel plate I by spray nozzles 22 by a 5° C./sec or more average cooling rate.
Public/Granted literature
- US20100200126A1 PRODUCTION FACILITY AND PRODUCTION PROCESS FOR HOT DIP GALVANNEALED STEEL PLATE Public/Granted day:2010-08-12
Information query