-
公开(公告)号:US11875283B2
公开(公告)日:2024-01-16
申请号:US15725821
申请日:2017-10-05
Applicant: CONOCOPHILLIPS COMPANY
Inventor: Hui Zhou , Curt Schneider , Iman Shahim
IPC: G06Q10/04 , G06Q10/0631 , E21B43/00 , G06Q10/047 , G06Q10/06 , G06F30/20
CPC classification number: G06Q10/04 , E21B43/00 , G06F30/20 , G06Q10/047 , G06Q10/06 , G06Q10/06313
Abstract: A method for creating a field development plan, comprising initializing, by a specially programmed computing system, a connectivity model, calibrating, by a specially programmed computing system, the connectivity model based on a plurality of reservoir simulation results, determining, by a specially programmed computing system, a travel time between wells and reservoir cells using a fast marching method, determining, by the specially programmed computing system, a hydrocarbon saturation based on the travel time to construct a model prediction, optimizing, by the specially programmed computing system, the connectivity model using a global optimization and a local optimization, and constructing, by the specially programmed computing system, at least one well file using the optimized connectivity model.