公开(公告)号:AT21708T
公开(公告)日:1986-09-15
申请号:AT81903221
申请日:1981-11-28
Applicant: TORAY INDUSTRIES
Inventor: SATO KENJI , YAMAGATA SEIICHI , SAKAI MASAAKI
-
公开(公告)号:AT17266T
公开(公告)日:1986-01-15
申请号:AT81304317
申请日:1981-09-21
Applicant: TORAY INDUSTRIES
Inventor: YAMAGATA SEIICHI , SAKAI MASAAKI
Abstract: In an artificial fur made from a pile cloth provided with a ground construction and numerous pile fibers projected upward from the ground construction, the pile fibers consist of a first group of pile fibers which form a layer of guard hair in the fur and a second group of pile fibers which form a layer of under fur in the fur, wherein each fiber of the first group is provided with a tapered free end portion and a tapered end portion firmly held by the ground construction; the pile fibers of the first group are longer than the pile fibers of the second group, while the thickness of the main portion of the former is thicker than the thickness of the latter. The above-mentioned artificial fur is manufactured by a first step of forming a material pile cloth provided with a ground construction and numerous yarn-like piles projected upward from the ground construction, and a second step of raising the side of said yarn-like piles. An intermediate step of applying a backing treatment to the pile cloth is preferably applied as a process between the above-mentioned two steps of processing. As a final process, a finishing process is applied to the material pile cloth. A conventional dyeing process can be applied.
-
公开(公告)号:DE3566129D1
公开(公告)日:1988-12-15
申请号:DE3566129
申请日:1985-05-13
Applicant: TORAY INDUSTRIES
Inventor: SAKAI MASAAKI , YAMAGATA SEIICHI
Abstract: In the manufacture of a double connecting fabric (14) having an upper ground construction formed with upper ground warp yarns (3), a lower ground construction formed with lower ground warp yarns (4), and pile yarns (9) connecting both ground constructions, the double connecting fabric (14) is withdrawn from the double velvet loom by a plurality of spiked rollers (15, 16, 17) arranged at positions downstream of a reed (13) the loom, both the upper ground construction and the lower ground construction being contacted by at least one of the rollers (15, 16, 17).
-
公开(公告)号:AU542665B2
公开(公告)日:1985-02-28
申请号:AU7544681
申请日:1981-09-17
Applicant: TORAY INDUSTRIES
Inventor: YAMAGATA SEIICHI , SAKAI MASAAKI
IPC: D04B1/02 , D02G3/22 , D03D27/00 , D04H11/00 , D04H11/08 , D05C17/02 , D06C13/08 , D03D1/00 , D03D27/10
Abstract: In an artificial fur made from a pile cloth provided with a ground construction and numerous pile fibers projected upward from the ground construction, the pile fibers consist of a first group of pile fibers which form a layer of guard hair in the fur and a second group of pile fibers which form a layer of under fur in the fur, wherein each fiber of the first group is provided with a tapered free end portion and a tapered end portion firmly held by the ground construction; the pile fibers of the first group are longer than the pile fibers of the second group, while the thickness of the main portion of the former is thicker than the thickness of the latter. The above-mentioned artificial fur is manufactured by a first step of forming a material pile cloth provided with a ground construction and numerous yarn-like piles projected upward from the ground construction, and a second step of raising the side of said yarn-like piles. An intermediate step of applying a backing treatment to the pile cloth is preferably applied as a process between the above-mentioned two steps of processing. As a final process, a finishing process is applied to the material pile cloth. A conventional dyeing process can be applied.
-
公开(公告)号:CA1164639A
公开(公告)日:1984-04-03
申请号:CA385846
申请日:1981-09-14
Applicant: TORAY INDUSTRIES
Inventor: YAMAGATA SEIICHI , SAKAI MASAAKI
Abstract: AN ARTIFICIAL FUR AND A METHOD FOR MANUFACTURING THE SAME In an artificial fur made from a pile cloth provided with a ground construction and numerous pile fibers projected upward from the ground construction, the pile fibers consist of a first group of pile fibers which form a layer of guard hair in the fur and a second group of pile fibers which form a layer of under fur in the fur, wherein each fiber of the first group is provided with a tapered free end portion and a tapered end portion firmly held by the ground construction; the pile fibers of the first group are longer than the pile fibers of the second group, while the thickness of the main portion of the former is thicker than the thickness of the latter. The above-mentioned artificial fur is manufactured by a first step of forming a material pile cloth provided with a ground construction and numerous yarn-like piles projected upward from the ground construction, and a second step of raising the side of said yarn-like piles. An intermediate step of applying a backing treatment to the pile cloth is preferably applied as a process between the above-mentioned two steps of processing. As a final process, a finishing process is applied to the material pile cloth. A conventional dyeing process can be applied.
-
公开(公告)号:CH629857A5
公开(公告)日:1982-05-14
申请号:CH565377
申请日:1977-05-05
Applicant: TORAY INDUSTRIES
Inventor: TSUCHIDA NOBUO , KOHARA TADASHI , MORISHITA SYOZO , YAMAGATA SEIICHI , SAKAI MASAAKI
-
公开(公告)号:CA1071392A
公开(公告)日:1980-02-12
申请号:CA277794
申请日:1977-05-05
Applicant: TORAY INDUSTRIES
Inventor: TSUCHIDA NOBUO , KOHARA TADASHI , MORISHITA SYOZO , YAMAGATA SEIICHI , SAKAI MASAAKI
Abstract: METHOD AND APPARATUS FOR COMMENCING THE YARN FORMING OPERATION OF A FASCIATED YARN An improved method for commencing the yarn forming operation of a fasciated yarn and an apparatus for carried out thereof. In the apparatus for manufacturing a fasciated yarn from a bundle of fibers supplied from a supply mechanism into a yarn forming mechanism provided with a fluid nozzle, when the yarn forming operation is commenced, the distance between the downstream nip point of the fiber bundle supply mechanism and a twisting point of the fluid nozzle is shortened in a condition shorter than a predetermined distance such as an effective fiber length of a material fiber, and after completion of such initial yarn forming operation, the above-mentioned distance is gradually or stepwisely enlarged to the distance wherein a normal yarn forming operation is carried out. Such shortening and enlarging the above-mentioned distance is carried out by displacing the fluid nozzle and/or changing the position of the downstream nip point of the fiber bundle supply mechanism.
-
公开(公告)号:CA1027429A
公开(公告)日:1978-03-07
申请号:CA232440
申请日:1975-07-29
Applicant: TORAY INDUSTRIES
Inventor: TSUCHIDA NOBUO , YAMAGATA SEIICHI , SAKAI MASAAKI , NAKAMURA ITSUO , KOHARA TADASHI , MORISHITA SYOZO , KUKINO SATOSHI
Abstract: Method and apparatus for starting, interrupting or stopping spinning of a fasciated spun yarn. Staple fibers are false twisted into a yarn, a fluid eddy is applied to the bundle, and separate suction is applied, cutting off temporarily the suction air current separately provided. Yarn formation is continued while re-applying the suction air current separately applied.
-
公开(公告)号:IT1140087B
公开(公告)日:1986-09-24
申请号:IT2535381
申请日:1981-11-30
Applicant: TORAY INDUSTRIES
Inventor: YAMAGATA SEIICHI , SATO KENJY , SAKAI MASAAKI
-
公开(公告)号:DE2720519A1
公开(公告)日:1978-11-09
申请号:DE2720519
申请日:1977-05-06
Applicant: TORAY INDUSTRIES
Inventor: TSUCHIDA NOBUO , KOHARA TADASHI , OTSU SHIGA , MORISHITA SYOZO , YAMAGATA SEIICHI , SAKAI MASAAKI
Abstract: An improved method for commencing the yarn forming operation of a fasciated yarn and an apparatus for carrying it out thereof. In the apparatus for manufacturing a fasciated yarn from a bundle of fibers suppled from a supply mechanism into a yarn forming mechanism provided with a fluid nozzle, when the yarn forming operation is commenced, the distance between the downstream nip point of the fiber bundle supply mechanism and a twisting point of the fluid nozzle is shortened in a condition shorter than a predetermined distance such as an effective fiber length of a material fiber, and after completion of such initial yarn forming operation, the above-mentioned distance is gradually or stepwisely enlarged to the distance wherein a normal yarn forming operation is carried out. Such shortening and enlarging the above-mentioned distance is carried out by displacing the fluid nozzle and/or changing the position of the downstream nip point of the fiber bundle supply mechanism.
-
-
-
-
-
-
-
-
-