公开(公告)号:CA2553488A1
公开(公告)日:2005-08-18
申请号:CA2553488
申请日:2005-01-27
Applicant: ABB INC
Inventor: STURM STEVEN PERRY , MAXSON RODNEY DALE , DAUGHERTY DENNIS CHARLES
Abstract: A measuring apparatus (10) is provided having an illumination unit (20) including a source of electromagnetic radiation (22), fiber optic apparatus (30) and sensing apparatus (40). The fiber optic apparatus includes first fiber optic structure (110) having an input end (114) for receiving at least a portion of electromagnetic radiation emitted from the radiation source and a n output end (116) for directing the received radiation to a web of material (100), and second fiber optic structure (80) having an input end (84) for receiving radiation reflected from the web of material and an output end (86 ) for directing the reflected radiation to the sensing apparatus. The sensing apparatus includes a first detector (90) for sensing electromagnetic radiati on of a first wavelength band and generating a corresponding first output signa l and a second detector (90) for sensing electromagnetic radiation of a second wavelength band and generating a corresponding second output signal indicati ve of a first property to be measured of the web of material.
-
公开(公告)号:DE69924850D1
公开(公告)日:2005-05-25
申请号:DE69924850
申请日:1999-07-16
Applicant: ABB INC
IPC: H01F5/06 , H01B7/02 , H01B13/00 , H01F5/00 , H01F27/32 , H01F41/06 , H01B7/00 , H01R43/00 , H05K3/00 , C07C309/42 , A61K38/45
Abstract: A method of making various insulated conductor sizes during a transformer coil winding process by slitting and bonding insulating sheet materials and foil sheet conductor into a composite foil conductor/insulation. The method includes folding the composite into a substantially U-shaped length having a central portion between two leg portions with each leg portion having a free end. The method also includes folding the leg portions of the "U" inwardly to a position substantially parallel to the central portion of the "U" to bring the free ends of the leg portions into opposing relation to provide a folded insulated foil conductor having a two-conductor thickness surrounded by insulation. Provision is also made for increasing the cross-sectional area of the conductor.
-
公开(公告)号:AT293833T
公开(公告)日:2005-05-15
申请号:AT99934089
申请日:1999-07-16
Applicant: ABB INC
Inventor: LANOUE THOMAS J , MAREK RICHARD P
IPC: H01F5/06 , H01B7/02 , H01B13/00 , H01F5/00 , H01F27/32 , H01F41/06 , H01B7/00 , H01R43/00 , H05K3/00 , H01F41/12
Abstract: A method of making various insulated conductor sizes during a transformer coil winding process by slitting and bonding insulating sheet materials and foil sheet conductor into a composite foil conductor/insulation. The method includes folding the composite into a substantially U-shaped length having a central portion between two leg portions with each leg portion having a free end. The method also includes folding the leg portions of the "U" inwardly to a position substantially parallel to the central portion of the "U" to bring the free ends of the leg portions into opposing relation to provide a folded insulated foil conductor having a two-conductor thickness surrounded by insulation. Provision is also made for increasing the cross-sectional area of the conductor.
-
194.
公开(公告)号:AU2003275370A8
公开(公告)日:2004-04-23
申请号:AU2003275370
申请日:2003-10-02
Applicant: ABB INC
-
195.
公开(公告)号:AU2003275370A1
公开(公告)日:2004-04-23
申请号:AU2003275370
申请日:2003-10-02
Applicant: ABB INC
-
公开(公告)号:BR0207590A
公开(公告)日:2004-03-09
申请号:BR0207590
申请日:2002-12-20
Applicant: ABB INC
Inventor: HART DAVID G , UY DAVID , LAPLACE CARL J , EGOLF WILLIAM M
Abstract: A local power distribution device monitoring and control system wherein the local power distribution device monitoring and control system monitors the local power distribution device operating status. A dedicated embedded web sever maps the local power distribution device operating status information onto displayable pages and transmits the information to a utility control center using TCP/IP protocol.
-
公开(公告)号:NO20033786A
公开(公告)日:2003-10-24
申请号:NO20033786
申请日:2003-08-26
Applicant: ABB INC
Inventor: HART DAVID G , UY DAVID , LAPLACE CARL J , EGOLF WILLIAM M
CPC classification number: H02J13/0086 , Y02E60/7869 , Y04S40/128
-
公开(公告)号:FI20031192A
公开(公告)日:2003-10-15
申请号:FI20031192
申请日:2003-08-25
Applicant: ABB INC
Inventor: HART DAVID G , UY DAVID , LAPLACE CARL J , EGOLF WILLIAM M
Abstract: A local power distribution device monitoring and control system wherein the local power distribution device monitoring and control system monitors the local power distribution device operating status. A dedicated embedded web sever maps the local power distribution device operating status information onto displayable pages and transmits the information to a utility control center using TCP/IP protocol.
-
公开(公告)号:NO20033786D0
公开(公告)日:2003-08-26
申请号:NO20033786
申请日:2003-08-26
Applicant: ABB INC
Inventor: HART DAVID G , UY DAVID , LAPLACE CARL J , EGOLF WILLIAM M
Abstract: A local power distribution device monitoring and control system wherein the local power distribution device monitoring and control system monitors the local power distribution device operating status. A dedicated embedded web sever maps the local power distribution device operating status information onto displayable pages and transmits the information to a utility control center using TCP/IP protocol.
-
公开(公告)号:AU2002364208A1
公开(公告)日:2003-07-24
申请号:AU2002364208
申请日:2002-12-23
Applicant: LORITO FABRIZIO , SCHULZ THORALF , WUTTIG HARTMUT , ABB INC , ABB SERVICE SRL , BAZZOCCHI RENZO
Inventor: SCHULZ THORALF , WUTTIG HARTMUT , BAZZOCCHI RENZO , LORITO FABRIZIO
Abstract: A technique to optimize both the production schedule and the maintenance of plant assets based on predetermined criteria which may be economic or otherwise. In one embodiment the technique receives at least one maintenance trigger (MT) and one production order and evaluates those inputs to propose one or more solutions for the joint scheduling of the asset maintenance and required plant production. In another embodiment a computerized maintenance management system (CMMS) acquires a new MT and proposes a new maintenance schedule. The technique transmits a blocking order to a production scheduling (PS) system for converting the maintenance request into a production schedule. In another embodiment, a CMMS acquires a new MT and asks for confirmation of a time slot to perform the maintenance action. The technique evaluates the priorities and finds based on the predetermined criteria the right time slot and communicates a request for that slot to the PS.
-
-
-
-
-
-
-
-
-