발포성 재료를 이용한 록볼트 충전재 밀봉패커, 이를 이용한 록볼트 장착구멍의 밀봉방법 및 록볼트 시공방법
    31.
    发明授权
    발포성 재료를 이용한 록볼트 충전재 밀봉패커, 이를 이용한 록볼트 장착구멍의 밀봉방법 및 록볼트 시공방법 有权
    密封包装机用于岩石螺旋填料,使用这种密封包装的密封螺栓孔密封方法,以及构造岩石螺栓的方法

    公开(公告)号:KR101000599B1

    公开(公告)日:2010-12-10

    申请号:KR1020090056553

    申请日:2009-06-24

    Abstract: PURPOSE: A sealing packer for a rock bolt filler using a foaming material, a sealing method of a rock bolt hole using such a sealing packer, and a constructing method of a rock bolt are provided to prevent a rock bolt from falling due to own weight since when the rock bolt is installed on a installation hole for installing the rock bolt after the hole is formed on the ground, the rock bolt is stably supported. CONSTITUTION: A sealing packer for a rock bolt filler using a foaming material comprises a packer body, a first foaming agent and a second foaming agent. The synthetic-resin coated aluminum foils of the front and rear sides of the packer body are thermally-bonded to form an inner space. The inner space of the packer body is divided into two areas by an inner partition line(22), which is formed by the thermal bonding. The first foaming agent and the second foaming agent are respectively filled in the two areas of the inner space of the packer body. The first and second foaming agents are mixed and form a foaming body.

    Abstract translation: 目的:提供一种用于使用发泡材料的岩石填料的密封封隔器,使用这种密封封隔器的岩石螺栓孔的密封方法和岩石锚杆的构造方法,以防止岩石锚杆由于自重而下落 因为当在地面上形成孔之后,当岩石锚杆安装在用于安装岩石锚杆的安装孔上时,岩石锚杆被稳定地支撑。 构成:用于使用发泡材料的岩石填料的密封封隔器包括封隔器本体,第一发泡剂和第二发泡剂。 封隔器主体的前后侧的合成树脂涂覆的铝箔被热粘合以形成内部空间。 封隔器主体的内部空间由通过热粘合形成的内部分隔线(22)分成两个区域。 第一发泡剂和第二发泡剂分别填充在封隔器主体的内部空间的两个区域中。 将第一和第二发泡剂混合并形成发泡体。

    파괴요소에 의한 경계조건 변화 알고리즘
    32.
    发明授权
    파괴요소에 의한 경계조건 변화 알고리즘 有权
    边界条件改变算法由破坏性元素

    公开(公告)号:KR100974270B1

    公开(公告)日:2010-08-05

    申请号:KR1020080038791

    申请日:2008-04-25

    Abstract: 유한요소법은 초기에 구성된 요소집합체에 시간변화에 따라 경계조건을 설정하고 요소방적식을 풀어 해를 구하는 것이 일반적인데, 본 발명은 물체의 일부가 시간에 따라 제거되는 현상을 유한요소해석 함에 있어서, 그 결과의 정확도를 기하기 위해 시간의 변화에 따라 요소의 제거를 구현하고, 제거된 요소에 의해 바뀌는 경계조건 변화를 고려하는 알고리즘에 관한 것이다.
    본 발명은, 방정식 을 사용하여 모델 전체의 변위, 온도 또는 수두분포( )를 초기화시키는 1단계;와 시간 에 대한 경계조건을 보간법으로 계산하는 2단계;와 시간 에 대한 경계조건으로 방정식 을 사용하여 선형해석 또는 방정식 를 사용하여 비선형해석(반복수만큼 해석)하는 3단계;와 상기 해석에 의해 요소에 계산된 시간 에서의 변위, 온도 또는 수두( )를 기준 강도, 온도 또는 변형량( )과 비교하 는 4단계;와 상기 해석에 의해 요소에 계산된 시간 에서의 변위, 온도 또는 수두( )가 기준 강도, 온도 또는 변형량( )보다 큰 경우 요소를 파괴하여 경계를 변화시키는 5단계;와 상기 해석에 의해 요소에 계산된 시간 에서의 변위, 온도 또는 수두( )가 기준 강도, 온도 또는 변형량( )보다 작은 경우 해당 경계를 유지하는 6단계;와 상기 4단계 내지 6단계를 전체요소에 대하여 수행하는 7단계; 및 2단계 내지 7단계를 전체시간까지 수행하는 8단계로 이루어지는 파괴요소를 이용한 경계조건변화 알고리즘을 제공한다.
    유한요소법, 파괴요소, 경계조건, 보간법, 유한요소

    파괴요소에 의한 경계조건 변화 알고리즘
    33.
    发明公开
    파괴요소에 의한 경계조건 변화 알고리즘 有权
    破坏性元素的边界条件变化算法

    公开(公告)号:KR1020090112977A

    公开(公告)日:2009-10-29

    申请号:KR1020080038791

    申请日:2008-04-25

    CPC classification number: G06F17/16

    Abstract: PURPOSE: A boundary condition change algorithm by a rupture element according to the flow of time is provided to improve accuracy about result interpretation even though the analysis is time-dependent interpretation. CONSTITUTION: A boundary condition change algorithm by a rupture element according to the flow of time is as follows. The displacement of a model, a temperature or distribution is initialized by using an equation. A boundary condition about the time is calculated through an interpolation method. The boundary condition about the time is linearly interpreted by using an equation.

    Abstract translation: 目的:提供根据时间流动的破裂元件的边界条件变化算法,以提高结果解释的准确性,即使分析是时间依赖性解释。 构成:根据时间流动的破裂元件的边界条件变化算法如下。 通过使用等式来初始化模型的位移,温度或分布。 通过插值法计算关于时间的边界条件。 关于时间的边界条件通过使用等式线性地解释。

    터널 라이닝에 대한 섹션 시험장치 및 시험방법
    35.
    发明授权
    터널 라이닝에 대한 섹션 시험장치 및 시험방법 失效
    터널라이닝에대한섹션시험장치및시험방법

    公开(公告)号:KR100729994B1

    公开(公告)日:2007-06-20

    申请号:KR1020050126382

    申请日:2005-12-20

    Abstract: An apparatus and a method for testing a section for a tunnel lining are provided to perform a load teat under a state that a section sample simulating a partial period of a practical tunnel lining has the same condition as a boundary condition at the practical tunnel lining period. An apparatus(100) for testing a section for a tunnel lining includes a section sample(1), a jig unit(10), a load device(30), and a measurement device(40). The section sample is manufactured so as to have the same shape and material property of a partial period of the practical constructed tunnel lining. Both boundary unit of the section sample become a fixing terminal in a vertical direction and a moving terminal in a horizontal direction. The jig unit is attached to both ends of the section sample to prevent both ends of the section sample from moving in vertical direction. The load device applies a horizontal load to the section sample through the jog device. And, the measurement device measures a structure behavior of the section sample such as a stress, a displacement or a deformation of the section sample deformation generated at the section sample when the vertical load is applied to the section sample.

    Abstract translation: 提供了一种测试隧道衬砌截面的设备和方法,用于在实际隧道衬砌周期模拟实际隧道衬砌的部分周期的边界条件与边界条件相同的情况下执行载荷测试 。 一种用于测试隧道衬砌的区段的装置(100),包括区段样本(1),夹具单元(10),负载装置(30)和测量装置(40)。 截面试样制造成具有与实际构造的隧道衬砌的部分周期相同的形状和材料特性。 截面样品的两个边界单元都成为垂直方向的固定端子和水平方向的移动端子。 夹具单元连接到截面试样的两端,以防止截面试样的两端沿垂直方向移动。 负载装置通过点动装置将水平负载施加到部分样品上。 并且,测量装置测量截面样本的结构行为,例如当对截面样本施加垂直载荷时在截面样本处产生的截面样本变形的应力,位移或变形。

    지하 구조물의 방수 설계방법

    公开(公告)号:KR101901848B1

    公开(公告)日:2018-09-27

    申请号:KR1020160084003

    申请日:2016-07-04

    Abstract: 본발명에따르면, 지하구조물(1)의방수설계방법에있어서, 숏크리트층(100)을형성하는제1 단계(S100); 방수대상면(10)에대한지하수유입정도(a)를결정하는제2 단계(S200); 상기지하수유입정도(a)에대응하는방수처리(b)를수행하는제3 단계(S300); 뿜칠방수멤브레인층(200)을형성하는제4 단계(S400); 및표면콘크리트층(300)을형성하는제5 단계(S500);를포함하는것을특징으로하는지하구조물의방수설계방법이제공된다. 본발명에따르면방수대상면에적합한방수시공이수행가능한효과가있다.

    매트릭스 설계법에 의한 지보재 설계방법을 포함하는 주방식 지하구조물의 설계방법
    40.
    发明授权
    매트릭스 설계법에 의한 지보재 설계방법을 포함하는 주방식 지하구조물의 설계방법 有权
    包括矩阵设计法在内的主要地下结构设计方法

    公开(公告)号:KR101782517B1

    公开(公告)日:2017-09-29

    申请号:KR1020160140180

    申请日:2016-10-26

    CPC classification number: G06F17/5004 E02D29/045 E04B1/0007 E04H1/00

    Abstract: 본발명에따르면, 암주(200) 및내부공간(100)을포함하는주방식지하구조물의지보재를시공하는방법에있어서, 상기지보재가시공될대상면을결정하는제1 단계(S100); 상기대상면에시공될상기지보재의양을결정하는제2 단계(S200); 및상기대상면에상기지보재를시공하는제3 단계(S300);를포함하되, 상기제1 단계(S100)는, 상기암주(200) 및상기내부공간(100)의형상에따른형상별응력강도비를검토하는단계; 상기암주(200) 및상기내부공간(100)의형상에따른형상별한계변형률을검토하는단계; 및상기내부공간(100)의공간활용목적에따른공간활용률을산정하는단계;를포함하는것을특징으로하는주방식지하구조물의설계방법이제공된다.

    Abstract translation: 根据本发明,提供了一种用于主jibojae方式地下结构,包括amju 200和内部腔体100中,第一阶段1(S100)到jibojae的结构确定将要构建的目标面部; 确定要施加到物体表面的支撑材料的量的第二步骤(S200) 和步骤3(S300),其中建筑的jibojae至目标表面包括,但第一阶段1(S100),根据amju 200的形状和所述内空间由应力强度的形状100 审查比率; 根据衬套(200)和内部空间(100)的形状检查每个形状的临界应变; 并计算所述内部空间(100)的应用的空间的空间利用率的步骤;提供设计一个主要方法地下结构,包括的方法。

Patent Agency Ranking