-
公开(公告)号:KR1020070108462A
公开(公告)日:2007-11-12
申请号:KR1020070025041
申请日:2007-03-14
Applicant: 한상관
Inventor: 한상관
IPC: E02B3/12
Abstract: A nature-friendly revetment engineering method is provided to confirm that a revetment is stably installed by forming concrete structures to the whole part of the revetment, and to form the eco-friendly revetment by placing planting spaces between the concrete structures. An nature-friendly revetment engineering method comprises the steps of installing molds(10) projected from bottom parts(11) on a cut surface or a soil surface(1) to perforate upper and lower parts of a plurality of convex parts(12); placing covers(20) on the convex parts of the molds and mounting wire meshes(30) in the spaces between the convex parts; filing and hardening the concrete between the spaces of the convex parts by pouring a concrete(40) on the molds; removing the covers from the convex parts of the molds; and filling soils(50) in the convex parts and growing plants(60).
Abstract translation: 提供了一种自然护理工程方法,通过在护岸的整个部分形成混凝土结构,确定护岸稳定安置,并通过在混凝土结构之间放置种植空间形成环保护岸。 自然护理工程方法包括以下步骤:将从底部部分(11)突出的模具(10)安装在切割表面或土壤表面(1)上以对多个凸起部分(12)的上部和下部进行穿孔; 将盖(20)放置在模具的凸部和安装线网(30)之间的凸起部分之间的空间中; 通过将模具上的混凝土(40)浇注并凸起凸起部分的空间之间的混凝土; 从模具的凸部移除盖子; 以及在所述凸部和生长植物(60)中填充土壤(50)。
-
公开(公告)号:KR200381678Y1
公开(公告)日:2005-04-14
申请号:KR2020040034760
申请日:2004-12-07
Applicant: 플러스파운틴(주)
Inventor: 김우진
CPC classification number: E02B1/00 , E02B2201/00 , E02D29/06 , F16L1/12
Abstract: 본 고안은 하천 분수용 수중 구조물에 관한 것으로, 본 고안의 하천 분수용 수중 구조물은 하천의 수중에 설치되며 상기 하천의 수면 위로 상단이 노출된 노즐과 상기 노즐로 하천의 물을 펌핑하여 공급하는 펌프와 상기 펌프와 상기 노즐을 연결하는 배관이 내부에 수용되는 몸체; 상기 몸체의 상기 하천의 상류 방향과 마주하며 하류 방향으로 경사지게 형성된 경사면을 구비한 것으로, 이러한 본 고안에 따른 하천 분수용 수중 구조물은 펌프를 포함한 각종 부가적인 장치들을 하천의 수중에 노즐과 함께 설치한 하천 분수용 수중 구조물에 설치되도록 함으로써 종래와 같이 별도의 기계실을 하천 주변에 설치할 필요가 없고, 또한 배관 길이의 최소화 및 그에 따라 대용량의 펌프를 사용하지 않아도 수중 분수의 기능이 효과적으로 이루어지도록 하므로 수중 분수의 설치비용을 최소화하고, 공사시간을 단축하는 효과가 있다. 또한 하천의 흐름을 전혀 방해하지 않으므로 하천 흐름의 방해에 의한 환경오염이 발생하는 것을 방지하고, 또한 하천의 흐름을 원활하게 하면서 수중 분수의 기능 및 설치상태 유지가 효율적으로 이루어지도록 하는 효과가 있다.
-
公开(公告)号:KR101747171B1
公开(公告)日:2017-06-14
申请号:KR1020160115730
申请日:2016-09-08
Applicant: 한국건설기술연구원
IPC: E02B3/12
CPC classification number: E02B3/122 , E02B3/121 , E02B2201/00
Abstract: 본발명은지오백(geo-bag) 내에모래, 골재, 사석, 콘크리트등의채움재를채워서세굴발생예상지역의수중지반면에포설하여수중지반면이세굴에의해유실되는것을방지하되, 지오백을설치할때 행어(hanger)를이용하여복수개의지오백이동시에그리고신속하고용이하게기초주변의세굴발생예상지역에설치되도록함으로써, 수중지반면에세굴현상이발생하는것을빠른시간내에신속하게, 그리고효과적으로차단할수 있게하는 '행어를이용한지오백설치에의한수중지반면의세굴방지시공방법'에관한것이다.
-
公开(公告)号:KR1020160117384A
公开(公告)日:2016-10-10
申请号:KR1020160119726
申请日:2016-09-20
Applicant: 신명옥
Inventor: 신명옥
CPC classification number: Y02A20/104 , Y02A20/108 , Y02W10/37 , E03B1/02 , B01D35/02 , C02F1/001 , C02F1/006 , E02B2201/00 , E03B3/02 , E03B5/00 , E03B11/10
Abstract: 본발명은, 아파트와같은주택단지나대형건물, 공공시설등에강우시빗물을저장하고이를재이용하기위한시스템에관한것으로서, 강우시수집되는빗물에포함된부유물질과오염물을거르는제1여과부, 상기제1여과부를통해 1차여과된빗물을저장하는노천형의집수정화못, 상기집수정화못에저장된빗물의수위가설정값이상이되면저장된빗물을무동력으로배출하는사이폰, 상기사이폰을통해배출되는빗물의오염물질을 2차로여과하는제2여과부, 상기제2여과부를통해공급되는빗물을저장하는지하저수탱크로구성된것을특징으로하는빗물저류조를활용한연못순환시스템을요지로한다. 본발명의빗물저류조를활용한연못순환시스템에의하면, 빗물저장및 재이용설비에있어서저장된우수가시간이경과함에따라세균이나해충의번식에의해오염되는문제를해결하고, 빗물의저장과관리를위한설비의설치및 유지관리가용이하며, 최소한의동력으로써햇빛과흐름에의한자정작용을제공하고빗물의재이용에있어서경제성을제공한다.
-
公开(公告)号:KR1020150140930A
公开(公告)日:2015-12-17
申请号:KR1020140069135
申请日:2014-06-09
Applicant: 주식회사 엠에스테크 , 전유석
Inventor: 전유석
CPC classification number: Y02E10/22 , Y02P70/525 , E02B1/00 , E02B8/00 , E02B9/022 , E02B2201/00 , E03B3/04
Abstract: 본발명은취수터널내부에서직접구조물을제작설치하지않고, 수문과취수터널을연결하는연결관의내부를직접막아취수터널로물이공급되는것을막으면서수문을교체후에는물을배수할수 있는구성을구비하여취수터널내부에간단하고견고하게설치가가능한연결관을차단하는취수탑의수문보수용차단장치에관한것이며, 취수터널(1)과수문을연결하는연결관(2)의내부에차단어셈블리(50)가설치되어연결관(20)의내부를차단하도록구성되고, 차단어셈블리(50)는지지구조물(10)에의하여지지되는지지관(40)으로연결되며, 지지구조물(10)은취수터널(1) 내부에설치되어수평서포트바(20)와수직서포트바(30)로취수터널(1)의벽면을압착하여지지되고, 지지관(40)에는배수밸브(45)가형성되어구성된것을특징으로한다.
Abstract translation: 本发明涉及一种阻挡装置,其能够通过形成能够在更换闸门之后能够排出水的构造,同时防止供水的情况下,将能够容易且牢固地安装在进气通道内的连接管阻塞进入塔的闸门 通过直接阻塞连接闸门和进气塔的连接管的内部空间而不直接制造和安装进气通道内的结构而进入进气通道。 阻塞组件(50)安装在连接进气通道(1)和闸门的连接管(2)内,以阻塞连接管(20)的内部空间。 阻挡组件(50)连接到由支撑结构(10)支撑的支撑管(40)。 所述支撑结构安装在所述进气通道(1)内,并且通过使用水平支撑杆(20)和垂直支撑杆(30)对所述进气通道(1)的壁表面进行支撑。 排出阀(45)形成在支撑管(40)上。
-
公开(公告)号:KR1020140005836A
公开(公告)日:2014-01-15
申请号:KR1020130164797
申请日:2013-12-27
Applicant: 이우성
Inventor: 이우성
IPC: E02B3/18
CPC classification number: E02B3/18 , E02B2201/00
Abstract: The present invention relates to a public waters reclamation device having a peace retained construction machine to promptly and efficiently prevent various natural disasters including large forest fires caused by droughts and floods on the land or around the sea, Asian dust, heavy snowfall, intense heat, typhoon, earthquakes and tidal waves, landslides, and radioactive contamination and various territorial disputes, wars, and terrorism based on the weather forecast of a National Weather Service which checks and analyzes weather data transmitted from a flood control device and an artificial satellite inside the body of the public waters reclamation device using reclamation devices having a nonpolluting natural energy construction machine, although a conventional technique has side effects due to a construction delay by executing a reclamation process using an engine which uses oil for operation.
Abstract translation: 本发明涉及一种具有和平保留建筑机械的公共水域开垦装置,能够及时有效地防范包括大面积,海上干旱和洪水造成的大型森林火灾,亚洲尘埃,大雪,强热等各种自然灾害, 根据国家气象局的天气预报,台风,地震,潮汐,山体滑坡和放射性污染以及各种领土争端,战争和恐怖主义,检查和分析从防洪装置传输的天气数据和身体内的人造卫星 使用具有非污染自然能建筑机械的回收装置的公共水回收装置,虽然传统技术由于通过使用使用油进行操作的发动机执行回收处理由于施工延迟而具有副作用。
-
公开(公告)号:KR1020110017079A
公开(公告)日:2011-02-21
申请号:KR1020090074572
申请日:2009-08-13
Applicant: 김욱희
Inventor: 김욱희
CPC classification number: Y02A40/81 , E04G17/06 , B28B7/00 , E02B3/12 , E02B2201/00 , E04G17/02 , E04G17/14
Abstract: PURPOSE: A mold device is provided to facilitate connection of a mold and a connection rod, since multiple molds are connected by connection rods to support concrete pressure. CONSTITUTION: A mold device comprises a mold(1), a connection rod(2), and a connection piece(3). A connection frame(4) is vertically on one side of the mold. The multiple insertion inclined grooves are formed in the connection frame at regular intervals. A through-hole is formed on the upper and lower parts of the insertion inclined groove. The connection rod is inserted into the insertion inclined groove. An insertion groove is formed in the connection piece for the insertion of the connection rod, and a though hole is formed on the upper and lower parts of the insertion groove.
Abstract translation: 目的:提供模具装置,以便于模具和连接杆的连接,因为多个模具通过连接杆连接以支撑混凝土压力。 构成:模具装置包括模具(1),连接杆(2)和连接件(3)。 连接框架(4)垂直于模具的一侧。 多个插入斜槽以规则的间隔形成在连接框架中。 在插入倾斜槽的上部和下部形成有通孔。 连接杆插入到插入倾斜槽中。 在连接件中形成插入槽以插入连接杆,并且在插入槽的上部和下部形成有通孔。
-
公开(公告)号:KR1020100131963A
公开(公告)日:2010-12-16
申请号:KR1020100119262
申请日:2010-11-28
Applicant: 한상관
Inventor: 한상관
CPC classification number: E02B7/20 , E02B1/00 , E02B8/00 , E02B2201/00 , E02D19/02
Abstract: PURPOSE: A construction method of a partition for replacing a floodgate without the backflow of sand and gravel is provided to prevent turbulence by installing partitions in both surfaces of a floodgate. CONSTITUTION: A construction method of a partition for replacing a floodgate without the backflow of sand and gravel is composed as follows. Multiple partitions(6) are formed in both side walls of multiple floodgates(5) using concrete structures to have a 5~30m bigger size than the floodgates. Coupler grooves(2) are formed in the ends of the partitions in order to block river water. Couplers(8,9) are formed in the upper and lower parts of the partitions. A tent material(7) is inserted into the couplers.
Abstract translation: 目的:提供一种用于更换没有沙子和砾石回流的闸门的隔板的施工方法,以通过在闸门的两个表面安装隔板来防止湍流。 构成:用于更换没有砂砾回流的闸门的分隔构造方法如下。 使用混凝土结构在多个闸门(5)的两个侧壁上形成多个隔板(6),其尺寸比闸门大5〜30m。 在隔板的端部形成有连接器槽(2),以阻挡河水。 隔板(8,9)形成在隔板的上部和下部。 帐篷材料(7)插入耦合器中。
-
公开(公告)号:KR1020100007823A
公开(公告)日:2010-01-22
申请号:KR1020090116921
申请日:2009-11-30
Applicant: 주식회사 한국종합환경연구소
CPC classification number: E02B3/10 , E02B2201/00 , E02D17/18
Abstract: PURPOSE: An artificial bank for restoration of coastal wet land and a method for restoration of coastal wet land using the same are provided to revive the structure and function of the ecosystem and keep the environment clean. CONSTITUTION: An artificial bank comprises a support bar(10) and a vegetation region(20). The vegetation region locates inside the support bar. The support bar comprises a first support(11), a second support(12) and a third support(13,13'). The second support is located to be apart from the first support. The third support interlinks the side of the second support and the first support. A length ratio of the second support and the first support is 1:1 ~ 5:1. The first, second and third supports are within 0.1m ~ 2m.
Abstract translation: 目的:为恢复沿海湿地的人造银行和恢复沿海湿地的方法,以恢复生态系统的结构和功能,保持环境清洁。 构成:人造银行包括支撑杆(10)和植被区域(20)。 植被区域位于支撑杆内。 支撑杆包括第一支撑件(11),第二支撑件(12)和第三支撑件(13,13')。 第二个支持位于第一个支持位置。 第三个支持链接第二个支持的一侧和第一个支持。 第二支撑件和第一支撑件的长度比为1:1〜5:1。 第一,第二和第三支撑在0.1m〜2m之内。
-
公开(公告)号:KR1020060084299A
公开(公告)日:2006-07-24
申请号:KR1020050005118
申请日:2005-01-19
Applicant: 주식회사 라스아이티에스
Inventor: 유대규
CPC classification number: E02B3/06 , E02B3/16 , E02B2201/00
Abstract: 본 발명은 방파제의 상부 일측에 인명 보호용 보호 블럭을 일체 결합시켜 예기치 못한 파랑으로부터 보행자를 보호할 수 있도록 한 방파제의 시공방법에 관한 것으로, 그 시공방법은 방파제의 상부면 일측에 길이방향으로 위치하도록 미리 제작된 일정 높이의 보호 블럭을 안착시키고, 그 안착된 보호 블럭의 양측 테두리를 방파제의 상부면과 일체화되도록 결합부재를 매개로 결합시켜 일체화시키는 각각의 단계로 이루어진 것이다.
또한, 본 발명의 시공방법은 규격화된 형태로 미리 제작된 적어도 둘이상의 보호 블럭을 방파제측으로 운반하고, 그 운반된 다수개의 보호 블럭을 파랑이 일측방향으로 전달되는 방파제의 일측 상부면에 방파제의 길이방향으로 안착시키며, 그 안착되는 보호 블럭들이 상호 밀착되게 면 접촉되도록 결합시키고, 결합된 보호 블럭들을 상기 방파제의 상부면에 결합부재를 매개로 일체 결합시키는 단계를 포함하여 된 것이다.
이에 따르면, 본 발명은 방파제 전체의 높이를 높이지 않고도 상부면 일측에 상측으로 미리 제작된 규격화된 보호 블럭이 일체 결합가능하게 되므로, 공사 비용 절감 및 공사기간을 단축시킴과 아울러 방파제를 보행하는 보행자들의 안전을 보호하는 매우 유용한 효과를 갖는다.
-
-
-
-
-
-
-
-
-