Abstract:
본 발명은 철강 더스트 및 슬러지를 포함하는 산화물 원료를 환원하여 금속을 회수하는 공정에서, 교환기의 부착물을 근원적으로 저감시켜 열교환기 부착물 제거 시간을 단축시키는 방법으로서, 열교환기를 통과하는 배가스의 온도를 350℃ 이하로 낮추거나, 450℃ 이상으로 높이는 열교환기 부착물 저감 방법 및 산화물 원료 중 염소의 함량을 5% 이하로 제어하는 열교환기 부착물 저감 방법에 관한 것이다. 본 발명에 따르면 열교환기를 통과하는 배가스의 온도나 원료의 염소함량을 제어함으로써 열교환기 부착물을 저감시켜 열교환기 부착물 제거 시간을 크게 단축시킬 수 있다.
Abstract:
PURPOSE: A device for reinforcing a structure using multi-directional pre-stress is provided to offer uniform tensile force in both directions by installing a PS(Pre-stressed) strand extending in both directions and to prevent the loosening or relaxing of the PS strand. CONSTITUTION: A structure reinforcing device(100) using multi-directional pre-stressing comprises a PS strand(110), two fixation members(120) wound with the PS steel strand, a combining unit(130) for fixing the fixation members on a slab(10), and a strand fixing member(140) for fixing the PS strand. The fixation members include at least one positioning recesses on the outer face on which the strand is wound to stably fix the strand at a specific height.
Abstract:
PURPOSE: A stabilization method for a structure is provided to minimize the loss of a structure when restoring the damaged building structure caused by the ground subsidence and the pressure of underground water and to restore to the original state safety, and to cut down the maintenance expenses to the minimum. CONSTITUTION: The stabilization method for a structure comprises the steps of forming holes on both sides of a column(12) and one side of a wall(14), interposing an auxiliary column(30) to the hole, fixing a plate(50) on the upper part of the column(12) and the wall(14) using an anchor bolt(52) to form the same axis as the auxiliary column(30), installing a hydraulic cylinder(40) between the auxiliary column(30) and the plate(50) to make the hydraulic cylinder(40) support the lower part of the plate(50), removing the soil between the building structure and the ground, and removing pressure from the hydraulic cylinder(40) gradually to keep the building structure a parallel to the ground.
Abstract:
본 고안은 구조물 틈새 이음 구조에 관한 것으로, 특히 각종 교량이나 담수벽 등과 같은 건축구조물의 틈새를 탄성소재로 이은 후, 스테인리스 스틸 또는 강판으로 마감처리 하는 구조물 틈새 이음 구조에 관한 것이다. 본 고안의 목적을 달성하기 위한 구체적인 수단으로는; 구조물 사이의 개방부에 저밀도 패쇄형 탄성재인 홈이 구비된 봉함재를 끼워 시공하도록한 구조물 틈새 이음구조에 있어서; 블럭 아웃된 구조체의 표면에 시공된 탄성콘크리트 층을 형성하고, 상기 탄성콘크리트 층 및 봉함재의 대응되는 면과 홈에 에폭시 접착제로 도포되는 에폭시 접착제층이 구비되며, 상기 개방부의 양측에 형성된 탄성콘크리트 층에 앙카볼트를 이용하여 마감재로 마감함으로써 이루어진다.
Abstract:
펠릿의제조방법및 이에의하여제조된펠릿이제공된다. 본발명의일 실시예에의한펠릿의제조방법에의하면 T-Fe: 45wt% 내지 75%, 수분 30wt% 내지 40wt% 를포함하는고함수율의제철부산물을사용하여특정입도및 강도가우수한펠릿을제조할수 있다. 또한, 제조된펠릿을제철공정의원료로재사용할수 있어경제적이며자원폐기에따른환경오염을억제할수 있다.
Abstract:
An apparatus for injecting grout added with a plasticizer on the back of a tunnel lining is provided to fill up a hollow formed on the back of a tunnel lining completely using a main pipe and an auxiliary pipe. The invention relates to an apparatus for injecting grout added with a plasticizer to a hollow formed between the back of a tunnel lining and an internal wall of a tunnel by mounting a main pipe(100) having the appointed length to a through hole formed on the upper part of a tunnel lining and locating to a hollow formed on the back of a tunnel lining, injecting grout through many discharge ports(110) of the main pipe and curing the injected grout, connecting a grout supply pump to an auxiliary pipe(200) installed to the inside of the main pipe and injecting grout to the hollow through the auxiliary pipe precisely, cutting off the main pipe and the auxiliary pipe and closing up the through hole, wherein a cutoff cover(500) is installed on the end of the auxiliary pipe projected from the inside of the main pipe to the outside to prevent the grout discharged to the inside of the hollow through the discharge ports of the main pipe from flowing in the auxiliary pipe through the end of the auxiliary pipe.
Abstract:
PURPOSE: A concrete structure like an apartment building of wall-type structure and a load-carrying capacity and earthquake resistance reinforcement method thereof are provided to enhance the earthquake resistance performance of the concrete structure and to reinforce the earthquake resistance performance through low cost and easy construction. CONSTITUTION: A load-carrying capacity and earthquake resistance reinforcement method of a concrete structure like an apartment building of wall-type structure comprises steps of forming mounting grooves in wall bodies(110,120) of inner spaces; inserting reinforcing members(140,142) in the mounting grooves; fixing the reinforcing members to the wall bodies; and interconnecting the reinforcing members fixed to the wall bodies. The mounting grooves are formed in an elongated groove shape along the corners of the inner spaces.
Abstract:
본 고안은 콘크리트 빔, 강재 빔, 슬래브 등과 같은 구조물의 하부에 PS강선과 같은 긴장재를 사용하여 프리스트레스(prestress)를 도입할 수 있는 구조물의 보강 장치에 관한 것이다. 본 고안의 다방향 프리스트레싱을 이용한 구조물 보강장치는 보강이 필요한 구간에 서로 이격되어 설치되는 2개의 정착(fixation)부재와, 정착부재에 감겨지는 PS강선 및 PS강선의 양단이 서로 대응되는 방향에서 체결되고 PS강선에 인장을 가하는 강선고정부재를 포함하며, 정착부재에는 상기 PS강선이 감겨지는 외면에 위치고정홈을 형성된다.