Abstract:
PURPOSE: A method for repairing and reinforcing mega-spray asphalt road pavement of high rigidity to protect damage from seawater using environmentally-friendly watertight mega-polymer resin is provided to protect dry shrinkage and cracks in curing by using a watertight mega-polymer resin, and have excellent compressive strength, flexural strength, and bond strength, thereby extending lifetime with excellent rigidity. CONSTITUTION: A method for repairing and reinforcing mega-spray asphalt road pavement of high rigidity to protect damage from seawater using environmentally-friendly watertight mega-polymer resin is as follows. The superficial layer of a conventional road pavement is processed with a laitance process and removed foreign material and dust(S1). File cutting is implemented in parts of the superficial layer where plastic deformation and cracks are occurred and the parts are sealed with injected watertight mega-polymer resin. A watertight mega-polymer mortar is paved in the plastic deformation parts and pot holes and the planated surface is finished(S2). A permeable waterproof primer is painted to form a waterproof primer layer(S3). The watertight mega-polymer resin is painted to form a watertight mega-polymer resin layer(S4). The surface is hardened, finished, and cured(S5,S6).
Abstract:
PURPOSE: A method for repairing and reinforcing a grouting overlaid slip road using environmentally-friendly watertight mega-polymer concrete is provided to prevent drying shrinkage and cracks in curing and have excellent compressive strength, flexural strength, and bonding strength to extend lifetime. CONSTITUTION: A method for repairing and reinforcing a grouting overlaid slip road using environmentally-friendly watertight mega-polymer concrete is as follows. The surface layer of a conventional road pavement is implemented by a laitance process(S1). The surface of a road pavement is implemented by a grouting process and formed multiple boreholes in predetermined gaps(S2). Foreign material and dust are eliminated(S3). A permeable waterproof primer is coated to form a waterproof primer layer(S4). A wire mesh is installed(S5). A watertight mega polymer concrete is installed to impregnate the wire mesh and form a watertight mega-polymer concrete layer(S6). The surface is hardened, finished, and cured(S7,S8).
Abstract:
An earth anchor structure and an earth anchor method are provided to secure firm anchoring force with an earth anchor structure itself, specially, to be superior to the soft ground, to be inserted easily to a perforated hole even if a wedge body is prepared to be exposed to the outside, and to manufacture easily and to improve productivity by having a simple structure. An earth anchor structure comprises a wedge body(10) having a wedge blade(16), an insertion guide(12) composed of a guide(18) and a connection panel(20) connecting the guide and the wedge body, and an anchor head(14) having a strand(4) coupled to a space between the wedge body and the guide, which is a space provided by the connection panel, and contacted with the front end of the wedge body.
Abstract:
A method of forming a non-slip layer of a road using a slag ball and an acryl resin is provided to improve working efficiency by mixing the acryl resin with the ecological breaking slag ball as a slipping preventive agent, to improve adhesive effects and durability, to save aggregates suppress environmental pollution, and to shorten the braking distance and thereby enhance driving safety. A method of forming a non-slip layer of a road using a slag ball and an acryl resin comprises steps for stably manufacturing the slag ball in a spinal structure by a slag spray method(S1); finely breaking the slag ball roughly into 0.8~5 mm; mixing phosphoric acid of 0.5~1g, water of 0.5~2g, sodium silicate of 8~10g, and pigment of 2~7g about the broken slag ball 100g at room temperature(S2); inputting the slag ball mixed with a coating fluid into a sintering furnace over 500‹C and finishing the coating work after stirring and sintering for a certain time(S3); forcibly cooling at air by discharging the slag ball from the sintering furnace after the sintering work; and mixing a certain amount of acryl resin to the cooled slag ball and paving on the road surface(S4,S5).
Abstract:
본 발명은 교량지지용 폴리우레탄 내진완충받침에 관한 것이며, 그 목적은 강재에 고완충성의 특성을 가진 폴리우레탄을 재료로 하는 탄성베어링이 삽입된 구조로서 교량의 상부구조물과 하부구조물의 접점에 설치되어 교량상부의 하중과 외부물리적 변화등에 의해 발생되는 내부응력을 완충시키며, 지진시 구조부재를 탄성영역내에서 저항하도록 하여 부상 및 낙교를 방지하는 교량지지용 폴리우레탄 내진완충받침을 제공함에 있다. 상기 목적달성을 위한 본 발명은 교량의 상판과 교각사이에 설치되어 교량상부의 하중과 외부물리적 변화등에 의하여 발생되는 응력을 완충시켜주는 교량용 탄성받침에 있어서, 상기 교각의 상면에서 다수개의 앵커볼트(11)에 의해 고정 설치되는 하부판(3)과, 상기 하부판(3)의 상부에 놓여지고 상부에 안착홈(2a)이 형성되어 있는 중심판(2)과, 상기 하부판(3)과 중심판(2)의 사이에 삽입 고정되어 외부의 물리적 변화에 의하여 발생하는 내부응력을 완충시켜 주는 폴리우레탄 탄성베어링(5)과, 상기 중심판(2) 상부에 형성된 안착홈(2a)에 놓여져 미끄럼을 원활하게 하는 불소수지판(9)판과, 상기 교량 상판의 하부에 결합되어 불소수지판(9)의 상부에 놓여지며 양측단부에 이동제한 돌출부(6)가 형성되어 있는 상부판(1)에 관한 것을 그 기술적 요지로 한다. 교량, 폴리우레탄 탄성베어링, 부반력, 지진, 이동제한 고정부
Abstract:
본 고안은 선진도갱과 어깨부의 순으로 굴착하고 센터 스틸 리브와 사이드 스틸 리브를 가설한 다음 숏크리트 처리하는 동바리 설치 공정을 포함하는 터널 굴착 공사에 적합한 터널용 스틸 리브 지지장치를 제공하는 것으로서, 이것은 사이드 스틸 리브의 선단에 일체로 부착 고정되는 스크루 부재를 지지 함체의 외곽체 상면에 뚫린 통공으로 진입시켜서 그 스크루 볼트의 종단 측 브래킷에 형성된 축공과, 외곽체에 수용되는 리프터의 헤드에 뚫린 핀 공을 일치시켜 놓고, 다시 외곽체의 측면에 형성된 원호상의 유도 공을 통해 핀을 관통시킴과 동시에 상기 일치된 핀 공과 축공을 경유하게 하여, 상기 스크루 부재와 리프터가 일체로 연결되게 함으로써 상기 사이드 스틸 리브는 유도 공을 타고 이동하는 핀의 궤적에 따라 상기 리프터의 작용으로 상승 이동하게 되고, 상승 이동 후에는 상기 스크루 볼트의 외주에 설치된 조임 너트를 조절하여 부동상으로 보전되게 하는 구성으로 된 것이다. 터널 굴착, 스틸 리브 리프팅, 스틸 리브 가설, 스틸 리브 조립, 동바리 설치,
Abstract:
본 고안은 구조물의 신축이음부에 사용되는 안전진단용 계측장치에 관한 것이다. 본 고안은, 콘크리트 구조물(100)(100')의 신축이음부에 설치되어 구조물의 신축량을 측정할 수 있는 한편, 직사각형의 판재로, 일측에 볼트홀(210)이 형성되고, 타측에 눈금 지시부(230)가 형성되어 체결 볼트(600)에 의해 콘크리트 구조물(100')에 고정되는 측정표판(200); 상기 측정표판(200)의 하부면에 밀착되어 체결 볼트(600)로 콘크리트 구조물(100)에 고정되는 한편, 폭 방향 하측에 볼트홀(410)이 형성되고, 상측에 눈금(430)이 형성된 눈금판(400); 상기 눈금판(400)의 측면과 밀착되는 한편, 직사각형 판재로, 중앙부를 기점으로 양측에 각각 볼트홀(510)이 형성되고, 중앙부에 볼록부와 오목부가 형성된 접합판(500); 및 상기 콘크리트 구조물(100')에 측정표판(200)을 고정시키고, 상기 콘크리트 구조물(100)에 눈금판(400)과 접합판(500)을 고정시키는 체결 볼트(600);로 구성됨을 특징으로 하는 구조물 신축이음 안전진단 계측장치를 제공한다.