-
1.
公开(公告)号:WO2011150363A1
公开(公告)日:2011-12-01
申请号:PCT/US2011/038399
申请日:2011-05-27
Applicant: WEATHERFORD/LAMB, INC. , VAN PETEGEM, Ronald , QUICK, Kevin , ABRAHAMSEN, Egill , CARLINE, Brian, Michael , HEIDECKE, Karsten , BOUTWELL, Doyle, Frederick,JR.
Inventor: VAN PETEGEM, Ronald , QUICK, Kevin , ABRAHAMSEN, Egill , CARLINE, Brian, Michael , HEIDECKE, Karsten , BOUTWELL, Doyle, Frederick,JR.
IPC: E21B7/124 , E21B17/01 , E21B19/14 , E21B19/15 , E21B15/02 , E21B19/09 , E21B19/00 , B63B35/03 , B63B35/00
CPC classification number: E21B7/124 , B63B25/28 , B63B35/00 , E21B15/02 , E21B17/012 , E21B17/015 , E21B19/002 , E21B19/09 , E21B19/143 , E21B19/15
Abstract: Methods and apparatus for installing deepwater completions and performing well intervention from a "non-dedicated" vessel that can perform other duties while not running completions or performing interventions. The system for installing deepwater completions and performing well intervention may comprise a surface pipe handling and deployment package including a horizontally operated rig that may also be operated in a slanted mode. Deepwater completions may be deployed from the non-dedicated vessel via a buoyant horizontal riser (BHR), which may be supported by a submerged buoyant tensioning system (BTS). In this manner, the cost of performing completion or intervention operations may be significantly reduced compared to such operations run from a drilling rig.
Abstract translation: 从“非专用”船只安装深水完井和进行良好干预的方法和装置,可以在不运行完井或执行干预措施时执行其他任务。 用于安装深水完井和进行良好干预的系统可以包括表面管道处理和展开包装,其包括也可以倾斜模式操作的水平操作的钻机。 深水完井可以从非专用船舶通过浮力水平提升管(BHR)部署,水平立管可由淹没的浮力张紧系统(BTS)支撑。 以这种方式,与从钻机运行的这种操作相比,执行完成或干预操作的成本可能显着降低。
-
公开(公告)号:WO2009135220A3
公开(公告)日:2011-09-09
申请号:PCT/US2009042748
申请日:2009-05-04
Applicant: WEATHERFORD LAMB , OLSTAD DELANEY MICHAEL , THOMPSON RUSSELL W , MORGAN RUSSELL LEE , HOLLINGSWORTH JIM , BOUTWELL DOYLE FREDERIC , HAYES MICHAEL , LIESS MARTIN , HOOKER JOHN D
Inventor: OLSTAD DELANEY MICHAEL , THOMPSON RUSSELL W , MORGAN RUSSELL LEE , HOLLINGSWORTH JIM , BOUTWELL DOYLE FREDERIC , HAYES MICHAEL , LIESS MARTIN , HOOKER JOHN D
IPC: E21B19/16 , E21B3/02 , E21B21/10 , E21B33/126 , E21B33/127
CPC classification number: E21B19/06 , E21B19/10 , E21B19/16 , E21B21/106 , E21B23/00 , E21B33/126 , E21B33/127 , Y10T403/56
Abstract: A fill -up and circulation tool (100) includes a mandrel (105); a packer assembly (150) is disposed around the mandrel; and a valve assembly (200) connected to the mandrel, wherein the valve assembly is configured to selectively control fluid flow into the tool and out of the tool.
Abstract translation: 填充和循环工具(100)包括心轴(105); 封隔器组件(150)围绕心轴设置; 以及连接到所述心轴的阀组件(200),其中所述阀组件被配置为选择性地控制流入所述工具并流出所述工具的流体流动。
-
3.
公开(公告)号:WO2011150363A4
公开(公告)日:2012-02-23
申请号:PCT/US2011038399
申请日:2011-05-27
Applicant: WEATHERFORD LAMB , VAN PETEGEM RONALD , QUICK KEVIN , ABRAHAMSEN EGILL , CARLINE BRIAN MICHAEL , HEIDECKE KARSTEN , BOUTWELL DOYLE FREDERICK JR
Inventor: VAN PETEGEM RONALD , QUICK KEVIN , ABRAHAMSEN EGILL , CARLINE BRIAN MICHAEL , HEIDECKE KARSTEN , BOUTWELL DOYLE FREDERICK JR
IPC: E21B7/124 , B63B35/00 , B63B35/03 , E21B15/02 , E21B17/01 , E21B19/00 , E21B19/09 , E21B19/14 , E21B19/15
CPC classification number: E21B7/124 , B63B25/28 , B63B35/00 , E21B15/02 , E21B17/012 , E21B17/015 , E21B19/002 , E21B19/09 , E21B19/143 , E21B19/15
Abstract: Methods and apparatus for installing deepwater completions and performing well intervention from a "non-dedicated" vessel that can perform other duties while not running completions or performing interventions. The system for installing deepwater completions and performing well intervention may comprise a surface pipe handling and deployment package including a horizontally operated rig that may also be operated in a slanted mode. Deepwater completions may be deployed from the non-dedicated vessel via a buoyant horizontal riser (BHR), which may be supported by a submerged buoyant tensioning system (BTS). In this manner, the cost of performing completion or intervention operations may be significantly reduced compared to such operations run from a drilling rig.
Abstract translation: 从“非专用”船只安装深水完井和进行良好干预的方法和装置,可以在不运行完井或执行干预措施时执行其他任务。 用于安装深水完井和进行良好干预的系统可以包括表面管道处理和展开包装,其包括也可以倾斜模式操作的水平操作的钻机。 深水完井可以从非专用船舶通过浮力水平提升管(BHR)部署,水平立管可由淹没的浮力张紧系统(BTS)支撑。 以这种方式,与从钻机运行的这种操作相比,执行完成或干预操作的成本可能显着降低。
-
公开(公告)号:WO2010099347A3
公开(公告)日:2010-10-21
申请号:PCT/US2010025453
申请日:2010-02-25
Applicant: WEATHERFORD LAMB , HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL DOYLE F JR , BADRAK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
Inventor: HEIDECKE KARSTEN , HAYES MICHAEL , TILTON FREDERICK T , BOUTWELL DOYLE F JR , BADRAK ROBERT , RIALS JOSEPH ROSS , HAVENS DAVID J
IPC: E21B19/16
CPC classification number: E21B19/16 , E21B19/06 , E21B19/084 , E21B19/10 , E21B31/20
Abstract: The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided.
Abstract translation: 本发明一般涉及一种用于与位于钻井台上的钻机上的管状连接系统(例如焊接或锻造组件)一起使用的管道处理系统。 在一个方面,提供了一种使用在井眼处的接合组件形成管子串的方法。 连接组件包括内部接合工具和外部接合工具。 该方法包括使用电梯拾起管接头的步骤。 该方法还包括将管接头的下端邻近设置在外部接合工具中的一排管的端部定位的步骤。 该方法还包括将内部接合工具从第一位置移动到相对于电梯的第二位置的步骤,其中第二位置在管接头和管子串之间。 该方法还包括在管接头和管柱之间形成连接的步骤。 该方法还包括用夹紧工具抓住管接头并将电梯从管接头释放的步骤。 此外,该方法包括将管接头和管柱降低到井筒中的步骤。 另一方面,提供了一种使用钻机上的连接组件形成管子串的方法。 在另一方面,提供了一种用于将管接头定位在包括内部接合工具和外部接合工具的连接组件中的管道处理系统。
-
公开(公告)号:WO2010099347A2
公开(公告)日:2010-09-02
申请号:PCT/US2010/025453
申请日:2010-02-25
Applicant: WEATHERFORD/LAMB, INC. , HEIDECKE, Karsten , HAYES, Michael , TILTON, Frederick, T. , BOUTWELL, Doyle, F., Jr. , BADRAK, Robert , RIALS, Joseph, Ross , HAVENS, David, J.
Inventor: HEIDECKE, Karsten , HAYES, Michael , TILTON, Frederick, T. , BOUTWELL, Doyle, F., Jr. , BADRAK, Robert , RIALS, Joseph, Ross , HAVENS, David, J.
IPC: E21B19/16
CPC classification number: E21B19/16 , E21B19/06 , E21B19/084 , E21B19/10 , E21B31/20
Abstract: The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided.
Abstract translation: 本发明总体上涉及一种与位于钻井装置上的管状接合系统(例如焊接或锻造组件)一起使用的管道处理系统。 在一个方面,提供了一种使用井眼中的接合组件形成管柱的方法。 接合组件包括内部接合工具和外部接合工具。 该方法包括使用电梯拾取管接头的步骤。 该方法还包括将管接头的下端定位成邻近设置在外部接合工具中的管柱的端部的步骤。 该方法还包括使内部接合工具相对于电梯从第一位置移动到第二位置的步骤,其中第二位置位于管接头和管柱之间。 该方法还包括在管接头和管柱之间形成连接的步骤。 该方法还包括用夹持工具夹紧管接头并从管接头释放电梯的步骤。 另外,该方法包括将管接头和管柱降入井眼中的步骤。 另一方面,提供了一种使用钻机上的连接组件形成管柱的方法。 在另一方面,提供了一种用于将管接头定位在包括内部接合工具和外部接合工具的接合组件中的管道处理系统。 p>
-
公开(公告)号:WO2009126940A3
公开(公告)日:2009-11-26
申请号:PCT/US2009040283
申请日:2009-04-10
Applicant: WEATHERFORD LAMB , MOUTON DAVID E , HAYES MICHAEL , HEIDECKE KARSTEN , HAVENS DAVID J , FISHER RALEIGH , HOLLINGSWORTH JIM , BOUTWELL DOYLE
Inventor: MOUTON DAVID E , HAYES MICHAEL , HEIDECKE KARSTEN , HAVENS DAVID J , FISHER RALEIGH , HOLLINGSWORTH JIM , BOUTWELL DOYLE
CPC classification number: E21B41/08 , E21B17/07 , E21B19/09 , E21B41/0014
Abstract: The present invention generally relates to an apparatus (100) and method for compensating a landing string (50) due to movement of a floating rig platform. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint (20) member to a riser (40) disposed below the floating rig (5). In another aspect, a method for compensating a landing string due to movement of a floating rig is provided.
Abstract translation: 本发明总体上涉及一种用于补偿由于浮式钻机平台的移动引起的着陆柱(50)的装置(100)和方法。 一方面,提供了一种与着陆柱一起使用的补偿系统。 补偿系统包括可附接到着陆柱的滑动接头构件,滑动接头构件具有上部和下部。 补偿系统还包括第一锁定组件,其构造成将滑动接头构件的上部连接到浮动钻机。 此外,补偿系统包括第二锁定组件,其被配置为将滑动接头(20)构件的下部连接到设置在浮动钻台(5)下方的提升管(40)。 在另一方面,提供了一种由于浮动钻机的移动而补偿着陆柱的方法。
-
公开(公告)号:WO2008157441A1
公开(公告)日:2008-12-24
申请号:PCT/US2008/067033
申请日:2008-06-13
Applicant: WEATHERFORD/LAMB, INC. , BOUTWELL, Doyle, Frederic, Jr. , HEIDECKE, Karsten , WOOD, Kevin , PIETRAS, Bernd-Georg
IPC: E21B17/10
CPC classification number: E21B17/1035 , E21B17/026 , E21B19/22 , E21B29/04
Abstract: A control line running system includes a control line storage unit and a guiding system having a guiding device and a guide rail for guiding a control line from the control line storage unit toward a well center. The system may also include a control line manipulator assembly for moving the control line toward a tubular and a control line clamp for attaching the control line to the tubular.
Abstract translation: 控制线运行系统包括控制线存储单元和具有用于将控制线从控制线存储单元导向井中心的引导装置和导轨的引导系统。 该系统还可以包括用于将控制线移向管状的控制线操纵器组件和用于将控制线附接到管状物的控制线夹。
-
公开(公告)号:WO2009135220A2
公开(公告)日:2009-11-05
申请号:PCT/US2009/042748
申请日:2009-05-04
Applicant: WEATHERFORD/LAMB, INC. , OLSTAD, Delaney, Michael , THOMPSON, Russell, W. , MORGAN, Russell, Lee , HOLLINGSWORTH, Jim , BOUTWELL, Doyle, Frederic , HAYES, Michael , LIESS, Martin , HOOKER, John, D.
Inventor: OLSTAD, Delaney, Michael , THOMPSON, Russell, W. , MORGAN, Russell, Lee , HOLLINGSWORTH, Jim , BOUTWELL, Doyle, Frederic , HAYES, Michael , LIESS, Martin , HOOKER, John, D.
IPC: E21B21/08
CPC classification number: E21B19/06 , E21B19/10 , E21B19/16 , E21B21/106 , E21B23/00 , E21B33/126 , E21B33/127 , Y10T403/56
Abstract: A fill-up and circulation tool includes a mandrel; a packer assembly is disposed around the mandrel; and a valve assembly connected to the mandrel, wherein the valve assembly is configured to selectively control fluid flow into the tool and out of the tool.
Abstract translation: 填充和循环工具包括一个心轴; 封隔器组件设置在心轴周围; 以及连接到所述心轴的阀组件,其中所述阀组件被配置成选择性地控制流入所述工具并流出所述工具的流体流。
-
公开(公告)号:WO2009126940A2
公开(公告)日:2009-10-15
申请号:PCT/US2009/040283
申请日:2009-04-10
Applicant: WEATHERFORD/LAMB, INC. , MOUTON, David, E. , HAYES, Michael , HEIDECKE, Karsten , HAVENS, David, J. , FISHER, Raleigh , HOLLINGSWORTH, Jim , BOUTWELL, Doyle
Inventor: MOUTON, David, E. , HAYES, Michael , HEIDECKE, Karsten , HAVENS, David, J. , FISHER, Raleigh , HOLLINGSWORTH, Jim , BOUTWELL, Doyle
CPC classification number: E21B41/08 , E21B17/07 , E21B19/09 , E21B41/0014
Abstract: The present invention generally relates to an apparatus and method for compensating a landing string due to movement of a floating rig platform. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint member to a riser disposed below the floating rig. In another aspect, a method for compensating a landing string due to movement of a floating rig is provided.
Abstract translation: 本发明一般涉及一种由于浮动钻机平台的移动而补偿着陆柱的装置和方法。 一方面,提供了一种与着陆柱一起使用的补偿系统。 补偿系统包括可附接到着陆柱的滑动接头构件,滑动接头构件具有上部和下部。 补偿系统还包括第一锁定组件,其构造成将滑动接头构件的上部连接到浮动钻机。 此外,补偿系统包括第二锁定组件,其被配置为将滑动接头构件的下部连接到设置在浮动钻机下方的立管。 在另一方面,提供了一种由于浮动钻机的移动而补偿着陆柱的方法。
-
公开(公告)号:WO2004090279A1
公开(公告)日:2004-10-21
申请号:PCT/US2004/010442
申请日:2004-04-05
Applicant: WEATHERFORD/LAMB, INC. , MCDANIEL, Gary , THOMAS, Allen, Keith, Jr. , CUMMINS, Pat , HILL, Troy , CUMMINS, Tracy , BOUTWELL, Doyle , HAYES, Michael
Inventor: MCDANIEL, Gary , THOMAS, Allen, Keith, Jr. , CUMMINS, Pat , HILL, Troy , CUMMINS, Tracy , BOUTWELL, Doyle , HAYES, Michael
IPC: E21B19/06
CPC classification number: E21B19/004 , E21B19/06 , E21B19/10 , E21B19/166 , E21B19/20
Abstract: Aspects of the present invention provide a tubular handling system for handling wellbore tubulars. In one aspect, the present invention provides a tubular handling system adapted to retain a tubular without damaging the outer surface of the tubular. In another aspect, the present invention provides a method of connecting tubulars by remotely controlling the connection process, including joint compensation, alignment, make up, and interlock. In one embodiment, the tubular handling system comprises an elevator (50) adapted to support a tubular utilizing a first portion of an upset of the tubular and a spider (70) adapted to support the tubular utilizing a second portion of the upset. In another embodiment, at least one of the elevator and the spider is remotely controllable. In yet another embodiment, the tubular handling system comprising a joint compensator system (200) adapted to provide fluid communication to the elevator during rotation of the tubular.
Abstract translation: 本发明的方面提供一种用于处理井眼管的管状处理系统。 一方面,本发明提供一种适于保持管状而不损坏管状物的外表面的管状处理系统。 另一方面,本发明提供了一种通过远程控制连接过程(包括关节补偿,对准,补充和互锁)来连接管件的方法。 在一个实施例中,管状处理系统包括适于支撑管状物的电梯(50),其利用管状物的镦粗的第一部分和适于利用镦粗的第二部分来支撑管状物的支架(70)。 在另一个实施例中,电梯和蜘蛛中的至少一个是可远程控制的。 在另一个实施例中,管状处理系统包括接头补偿器系统(200),其适于在管状物旋转期间提供与电梯的流体连通。
-
-
-
-
-
-
-
-
-