-
公开(公告)号:KR1020090089013A
公开(公告)日:2009-08-21
申请号:KR1020080014315
申请日:2008-02-18
Applicant: 충남대학교산학협력단
CPC classification number: H05K1/0236 , H05K1/0233 , H05K9/0081
Abstract: A unit cell of a local spiral EBG(Electromagnetic Band Gap) structure is provided to minimize discontinuity on the power supply plane by locally arranging the unit cell in only via or port of the power supply plane of a PCB. A unit cell is formed by etching the power supply plane of the PCB. The unit cell includes a hexagonal patch(110) and a line(120). The line is extended from one edge(111) of the hexagonal patch. The line spirally surrounds the hexagonal patch several times. A predetermined interval is formed between lines. The hexagonal patch is positioned in the via or port of the power supply plane of the PCB. The extended end of the line is connected to the power supply plane.
Abstract translation: 提供本地螺旋EBG(电磁带隙)结构的单位单元,以通过仅在PCB的电源平面的通孔或端口中局部布置单元电池来最小化电源平面上的不连续性。 通过蚀刻PCB的电源平面形成晶胞。 单元电池包括六边形贴片(110)和线(120)。 该线从六边形贴片的一个边缘(111)延伸。 线条螺旋地围绕六角贴片几次。 线之间形成预定间隔。 六边形贴片位于PCB的电源平面的通孔或端口中。 线路的延长端连接到电源平面。
-
公开(公告)号:KR1020090089014A
公开(公告)日:2009-08-21
申请号:KR1020080014316
申请日:2008-02-18
Applicant: 충남대학교산학협력단
IPC: H01P1/15
CPC classification number: H01P1/2005 , H01P1/15 , H05K1/0236
Abstract: An EBG(Electromagnetic Band Gap) structure is provided to maintain signal integrity by securing an SSN(Simultaneous Switching Noise) suppressing characteristic. Two patches(110a,110b) face each other. A bridge unit(10) electrically connects the two patches. The bridge unit includes a central line(11), a first extension line(12), and a second extension line(13). The central line is arranged in parallel to the patch. The first extension line is connected to one of two patches from one end of the central line. The second extension line is connected to the other of the two patches from the other end of the central line. A first open stub is formed between the central line and the first extension line. The first open stub is extended in parallel to the patch from the first extension line. The second open stub is formed between the central line and the second extension line. The second open stub is extended in parallel to the patch from the second extension line.
Abstract translation: 提供EBG(电磁带隙)结构以通过确保SSN(同时开关噪声)抑制特性来保持信号完整性。 两个贴片(110a,110b)彼此面对。 桥接单元(10)电连接两个贴片。 桥单元包括中心线(11),第一延伸线(12)和第二延伸线(13)。 中心线与贴片平行布置。 第一个延长线连接到中心线一端的两个补丁之一。 第二个延长线从中心线的另一端连接到两个补丁中的另一个。 在中心线和第一延伸线之间形成第一开放短截线。 第一个开放桩与第一条延长线的补丁平行延伸。 第二开放短管形成在中心线和第二延伸线之间。 第二个开放桩与第二条延长线的补丁平行延伸。
-