-
公开(公告)号:KR101403428B1
公开(公告)日:2014-06-03
申请号:KR1020130111254
申请日:2013-09-16
Applicant: 충남대학교산학협력단
CPC classification number: E01D21/00 , E01D2/00 , E01D19/125 , E04C3/02
Abstract: The present invention relates to a method for manufacturing and constructing a bridge using longitudinal girders integral with cap beams which involves constructing longitudinal girders integral with cap beams on heads of piles and then constructing a floor plate on the girders after the piles are installed. According to the present invention, the construction method is conducted wherein the piles are spaced apart from each other by a given distance (L) along an extension direction (A1) of the length of the bridge, and at the position transversely spaced from the extension direction at the intermediate portion (L/2) between the two piles, the piles are spaced apart from each other by the given distance (L) along an extension direction (A2) of the length of the bridge.
Abstract translation: 本发明涉及一种使用与盖梁一体化的纵梁制造和构造桥梁的方法,该方法涉及在桩头之后构造与盖梁一体的纵向纵梁,然后在安装桩后在梁上构造地板。 根据本发明,进行施工方法,其中桩沿着桥的长度的延伸方向(A1)彼此间隔给定距离(L),并且在与延伸部横向间隔开的位置处 在两个桩之间的中间部分(L / 2)处的方向,桩沿着桥的长度的延伸方向(A2)彼此间隔开给定的距离(L)。