-
公开(公告)号:KR1020120043250A
公开(公告)日:2012-05-04
申请号:KR1020100104447
申请日:2010-10-26
Applicant: 티엠리서치주식회사
Inventor: 이경주
Abstract: PURPOSE: A golf course bunker and a construction method thereof are provided to reduce maintenance costs by preventing the slope of the bunker from collapsing at the time of a heavy rain. CONSTITUTION: A golf course bunker comprises the ground(10), a drain structure(20), a sand sheet, and a sand layer. The drain structure drains water flowing along the ground and comprises a slope drain structure(21) and a curve drain structure(22). The slope drain structure is installed on the slope of the bunker and drains water flowing along the slope of the bunker. The curve drain structure is installed on the curve of the bunker and drains water flowing along the curve of the bunker. The sand sheet covers the ground and the drain structure. The sand layer is formed on the top of the sand sheet.
Abstract translation: 目的:提供一种高尔夫球场沙坑及其施工方法,通过防止沙尘暴在大雨时坍塌而降低维护成本。 构成:高尔夫球场掩体包括地面(10),排水结构(20),砂层和砂层。 排水结构排出沿着地面流动的水,并包括斜坡排水结构(21)和曲线排水结构(22)。 斜坡排水结构安装在沙坑的斜坡上,排出沿着沙坑斜坡流动的水。 曲线排水结构安装在沙坑的曲线上,并排放沿着沙坑曲线流动的水。 沙板覆盖地面和排水结构。 砂层形成在砂纸的顶部。
-
公开(公告)号:KR1020120043249A
公开(公告)日:2012-05-04
申请号:KR1020100104445
申请日:2010-10-26
Applicant: 티엠리서치주식회사
Inventor: 이경주
CPC classification number: E01C13/08 , E01C13/02 , E01C2201/10 , E01C2201/20
Abstract: PURPOSE: A turf structure for a golf course and a construction method thereof are provided to uniformly maintain the quality of turf by preventing the lack of oxygen. CONSTITUTION: A turf structure for a golf course comprises the ground, a drain structure, a top turf layer, and turf. The ground has an inclined plane. The drain structure, composed of multiple drain units(21) connected to each other, collects water flowing along the inclined plane and drains the collected water. The drain structure comprises first and second drain units(211,212). The first drain unit is formed along the inclined plane. The second drain unit is connected to the end of the first drain unit. The top turf layer is formed on the inclined plane and the top of the drain structure. The turf is formed on the top of the top turf layer.
Abstract translation: 目的:提供一种用于高尔夫球场的草皮结构及其施工方法,以通过防止缺氧而均匀地保持草皮的质量。 构成:用于高尔夫球场的草皮结构包括地面,排水结构,顶部草皮层和草地。 地面有一个倾斜的飞机。 由相互连接的多个排水单元(21)组成的排水结构收集沿倾斜面流动的水并排出收集的水。 漏极结构包括第一和第二漏极单元(211,212)。 第一排水单元沿倾斜平面形成。 第二排水单元连接到第一排水单元的端部。 顶部草皮层形成在倾斜平面和排水结构的顶部。 草皮形成在顶部草皮层的顶部。
-