公开(公告)号:KR1020130019311A
公开(公告)日:2013-02-26
申请号:KR1020110081387
申请日:2011-08-16
Applicant: 한국과학기술정보연구원
Abstract: PURPOSE: A green computing control device using task management and a method thereof are provided to minimize the energy consumption of a system by executing a task with only nodes required for actually executing the task and blocking tasks of the rest of the nodes. CONSTITUTION: A calculating unit(111) calculates the number of nodes required for task execution in a computer formed of nodes. A comparing unit(112) compares the number of nodes currently executed with the number of nodes required for the task execution. If the number of the nodes currently executed is more than the number of the nodes required for the task execution, a blocking unit(113) selects nodes to block the tasks from the nodes currently executed in order of residual task execution time and blocks the tasks of the selected nodes. A power control unit(114) blocks power of nodes blocking the tasks. [Reference numerals] (111) Calculating unit; (112) Comparing unit; (113) Blocking unit; (114) Power control unit; (115) Determining unit; (116) Checking unit; (121) Node 1; (122) Node 2; (123) Node N
Abstract translation: 目的:提供使用任务管理的绿色计算控制装置及其方法,以通过仅执行任务所需的节点来实现系统的能量消耗,从而最小化能量消耗,该任务只需要实际执行任务所需的节点,并阻止其余节点的任务。 构成:计算单元(111)计算由节点形成的计算机中的任务执行所需的节点数。 比较单元(112)将当前执行的节点数与任务执行所需的节点数进行比较。 如果当前执行的节点的数量大于任务执行所需节点的数量,则阻塞单元(113)选择节点来按照剩余任务执行时间的顺序从当前执行的节点阻止任务,并阻止任务 的选定节点。 功率控制单元(114)阻止节点阻塞任务的功率。 (111)计算单元; (112)比较单位; (113)封闭单元; (114)电源控制单元; (115)确定单位; (116)检查单位; (121)节点1; (122)节点2; (123)节点N
-
公开(公告)号:KR101306995B1
公开(公告)日:2013-09-09
申请号:KR1020110081387
申请日:2011-08-16
Applicant: 한국과학기술정보연구원
Abstract: 그린 컴퓨팅 제어 장치 및 방법이 개시된다. 본 발명의 실시예들은 다수의 노드들로 구성된 컴퓨터에서 실제로 작업을 실행하기 위해 필요한 노드의 수가 현재 실행 중인 노드의 수보다 적은 경우, 실제로 작업을 실행하기 위해 필요한 노드만을 이용하여 작업을 실행하고, 나머지 노드의 작업을 차단함으로써, 시스템의 에너지 소모를 최소화할 수 있도록 하는 기술에 대한 것이다.
-