수문 및 수리분석 통합시스템
    1.
    发明授权
    수문 및 수리분석 통합시스템 有权
    水文与液压分析综合系统

    公开(公告)号:KR101094221B1

    公开(公告)日:2011-12-15

    申请号:KR1020110034969

    申请日:2011-04-15

    CPC classification number: G06Q50/26 G09B29/007

    Abstract: PURPOSE: An integrated system for analyzing water gate and irrigation is provided to shorten an analysis time by automating a passive/repetitive work which calculates floods and analyzes irrigation and integrating a system. CONSTITUTION: A precipitation database(100) holds a real-time rainfall measuring data and a PMP(Probable Maximum Precipitation) map of all parts of the country. An automatic PMP calculator(200) automatically calculates the PMP by using the PMP map of all parts of the country. An automatic statistical precipitation calculator(300) automatically calculates the probability rainfall by using the real-time rainfall measuring data. An automatic flood analyzer(400) automatically analyzes floods by collecting the result of the PMP and an automatic probability rainfall calculating unit. An automatic irrigation analyzer(500) automatically analyzes the irrigation by using the result of the automatic flood analysis unit.

    Abstract translation: 目的:提供一个分析水闸和灌溉的综合系统,通过自动化一个被动/重复的工作,缩短分析时间,从而计算洪水,分析灌溉和整合系统。 规定:降水资料库(100)拥有全国各地的实时降雨量测数据和PMP(可能的最大降水)图。 自动PMP计算器(200)通过使用国家所有部分的PMP图自动计算PMP。 自动统计降水计算器(300)通过使用实时降水量测量数据自动计算降雨概率。 自动洪水分析仪(400)通过收集PMP的结果和自动概率降雨计算单元自动分析洪水。 自动灌溉分析仪(500)利用自动淹水分析单元的结果自动分析灌溉。

Patent Agency Ranking