Abstract:
본 발명은 천층처분시설 방사성 폐기물 드럼의 정치를 위한 가이드 장치에 관한 것으로서, 상세하게는 천층처분(Near Surface) 방사성폐기물 처분시설의 처분고(Vault) 바닥 또는 그라우트 바닥에 방사성 폐기물 드럼을 정위치에 고정하는 가이드 장치를 설치하여 방사성 폐기물 드럼을 적치시 적치 편리성과 정확한 위치를 사전에 지정하여 제도적 관리기간 동안 손상된 방사성폐기물 드럼을 손쉽게 조치하여 주변 드럼으로 그 피해가 확산되는 것을 방지하는 등 방사성 폐기물 드럼의 정치 안정성과 정치 후 구조 안정성을 증대시키도록 하는 천층처분시설 방사성 폐기물 드럼의 정치를 위한 가이드 장치에 관한 것이다.
Abstract:
The present invention relates to an underground water flow characteristic monitoring system for grouting in an excavation of a drain type tunnel for underground disposal of radioactive wastes, of which a plurality of piezometers, which is spaced apart from each other, is installed in a horizontal direction with respect to a tunnel, and a flow net is created to gather data measured from each piezometer to determine the flow of underground water near the tunnel. Thus, a location where underground water is concentrated can be determined so grouting efficiency is improved by determining the target range of the grouting, and the flow change of the underground water and the concentration of the underground water can be determined in advance after the grouting, thereby preventing the tunnel from collapsing.
Abstract:
본 발명은 방사성 폐기물 저장용 지하 구조물 시공을 위한 지반 굴착 방법에 관한 것으로서, 특히 대상 지반을 절토하여 수평면을 형성하는 수평면 절토 공정과; 수평면을 제 1설계 굴착선까지 수직으로 굴착하고, 바닥판을 제 1굴착 바닥면 일측에 인양 장비로 하강시켜 수평하게 설치한 후 제 1굴착 측면에 숏크리트를 타설하는 1차 굴착 공정과; 상기 바닥판이 최종 설치된 곳을 제외하고, 제 2설계 굴착선까지 수직으로 굴착하는 2차 굴착 공정과; 상기 인양 장비로 상기 바닥판을 제 2굴착 바닥면 일측으로 하강시켜 수평하게 설치하고, 나머지 제 1굴착 바닥면을 제 2굴착 바닥면과 동일 선상으로 굴착하고, 제 2굴착 측면에 숏크리트를 타설하는 3차 굴착 공정과; 상기 바닥판이 최종 설치된 곳을 제외하고, 제 n설계 굴착선까지 수직으로 굴착하는 n차 굴착 공정; 및 상기 인양 장비로 상기 바닥판을 제 n굴착 바닥면 일측으로 하강시켜 수평하게 설치하고, 나머지 제 2굴착 바닥면을 상기 제 n굴착 바닥면과 동일 선상으로 굴착하고, 제 n굴착 측면에 숏크리트를 타설하는 n+1차 굴착 공정으로 이루어지는 것을 특징으로 한다. 상기와 같은 본 발명에 따르면 지반을 수직으로 굴착시 발파나 천공 등에 의해 울퉁불퉁한 굴착 바닥면에 바닥판을 설치하여 수평한 작업 공간을 제공하고, 굴착시 바닥판을 제외한 공간을 굴착한 다음, 바닥판을 아래에 형성된 굴착 바닥면으로 인양 장비를 통해 이동시킨 후 굴착을 진행함으로써 공사 장비의 이동이 용이하고, 연속적으로 굴착을 진행함으로써 공사 기간을 단축시킬 수 있으며 안전사고 예방에 효과적 이다.
Abstract:
본 발명은 천층처분시설 방사성 폐기물 드럼의 정치를 위한 가이드 장치에 관한 것으로서, 상세하게는 천층처분(Near Surface) 방사성폐기물 처분시설의 처분고(Vault) 바닥 또는 그라우트 바닥에 방사성 폐기물 드럼을 정위치에 고정하는 가이드 장치를 설치하여 방사성 폐기물 드럼을 적치시 적치 편리성과 정확한 위치를 사전에 지정하여 제도적 관리기간 동안 손상된 방사성폐기물 드럼을 손쉽게 조치하여 주변 드럼으로 그 피해가 확산되는 것을 방지하는 등 방사성 폐기물 드럼의 정치 안정성과 정치 후 구조 안정성을 증대시키도록 하는 천층처분시설 방사성 폐기물 드럼의 정치를 위한 가이드 장치에 관한 것이다.
Abstract:
The present invention relates to a method for constructing a semi-basement for storing radioactive waste and, more particularly, to a method for constructing a semi-basement for storing radioactive waste, capable of performing an impervious construction and preventing the diffusion of radioactive materials by installing hydrophobic limestone powder, a radiation shielding sheet, and a waterproof panel between the ground and a wall while constructing an upper structure on the ground after constructing the wall and base of a silo under the ground by excavating the ground. Also, the structure is applied to a base rock, a soft ground, a sand ground, and a subterranean water ground. An impact buffering space part is separated from the wall installed under the ground with a preset distance. An earthquake-proof structure is designed and the diffusion of the radiation is prevented in an emergency situation by filling the impact buffering space part with cement mortar and curing the cement mortar with the impact buffering materials in the emergency situation when the impact buffering space part is filled with impact buffering materials.
Abstract:
PURPOSE: A method for checking a blasting advance per each step such as a boring and a charging step in a long hole blasting process is provided to accurately check blasting advance, thereby obtaining certainty for a next blasting task. CONSTITUTION: A method for checking a blasting advance per each step such as a boring and a charging step in a long hole blasting process includes the following steps of: forming bores by boring a target vertical tunnel with an air-cooling type or a hydraulic drilling machine; taping an explosive (14) on one end of a vinyl rope (12) with a tape (16) and hanging the explosive on the bore; charging and blasting after surrounding the surface of the vinyl rope with a detonating fuse (18); and checking the blasting advance of the bore hole by inserting a rock drilling hose into the bore hole and injecting air via the rock drilling hose.
Abstract:
The present invention provides a guide pocket for piling a radioactive waste disposal container capable of preventing the generation of position error of the disposal container when the disposal container is piled and increasing pile stability. The guide pocket for piling the radioactive waste disposal container is positioned on a silo bottom, an upper part of the disposal container, and a lower part of the disposal container. The guide pocket for piling the radioactive waste disposal container comprises a lower guide pocket and an upper guide pocket. The lower guide pocket comprises a concrete structure and a lower anchor plate which is buried into the concrete structure. The upper guide pocket comprises the concrete structure and an upper anchor plate which is buried into the concrete structure.
Abstract:
The present invention provides a structure for reinforcing a vertical hole in a fault rock section and a construction method thereof for ensuring construct ability, independence ability (stability), and safety of a worker by inserting a corrugated steel pipe into a vertical hole to stand independently a vertical hole which is excavated. According to the structure for reinforcing a vertical hole in a fault rock section of the present invention for achieving the above purpose, the corrugated steel pipe is inserted and installed in the ground of the fault rock section. According to the present invention for achieving the above purpose, the construction method of a fault rock section comprises: a step for forming a boring hole by excavating a fault rock section in the fixed diameter and the fixed depth; and a step for inserting and installing the corrugated steel pipe in the boring hole.