-
公开(公告)号:WO2013043583A3
公开(公告)日:2013-12-12
申请号:PCT/US2012055890
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
CPC classification number: E21B43/122
Abstract: When a fossil fuel well is producing fossil fuel, lift gas injected into the well to bring the naturally occurring fluids in the well to the surface along with the fossil fuel and the plunger if the well has a plunger. An instrument is programmed to use the predetermined criteria to dynamically control the rate of injection of the lift gas into the well.
Abstract translation: 当矿物燃料井生产化石燃料时,如果井内有活塞,则将注入井中的气体提升以将天然存在的流体与井中的化石燃料和柱塞一起带到地面。 仪器被编程为使用预定标准来动态控制升降气体注入井中的速率。
-
公开(公告)号:CA2849074A1
公开(公告)日:2013-03-28
申请号:CA2849074
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
Abstract: When a fossil fuel well is producing fossil fuel, lift gas injected into the well to bring the naturally occurring fluids in the well to the surface along with the fossil fuel and the plunger if the well has a plunger. An instrument is programmed to use the predetermined criteria to dynamically control the rate of injection of the lift gas into the well.
-
公开(公告)号:HRP20170522T1
公开(公告)日:2017-06-16
申请号:HRP20170522
申请日:2017-03-31
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
-
公开(公告)号:AU2012312657B2
公开(公告)日:2017-03-23
申请号:AU2012312657
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
Abstract: When a fossil fuel well is producing fossil fuel, lift gas injected into the well to bring the naturally occurring fluids in the well to the surface along with the fossil fuel and the plunger if the well has a plunger. An instrument is programmed to use the predetermined criteria to dynamically control the rate of injection of the lift gas into the well.
-
公开(公告)号:CA2849074C
公开(公告)日:2019-09-10
申请号:CA2849074
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
Abstract: When a fossil fuel well is producing fossil fuel, lift gas injected into the well to bring the naturally occurring fluids in the well to the surface along with the fossil fuel and the plunger if the well has a plunger. An instrument is programmed to use the predetermined criteria to dynamically control the rate of injection of the lift gas into the well.
-
公开(公告)号:PL2758629T3
公开(公告)日:2017-07-31
申请号:PL12766555
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
-
公开(公告)号:AU2012312657A1
公开(公告)日:2014-03-20
申请号:AU2012312657
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
Abstract: When a fossil fuel well is producing fossil fuel, lift gas injected into the well to bring the naturally occurring fluids in the well to the surface along with the fossil fuel and the plunger if the well has a plunger. An instrument is programmed to use the predetermined criteria to dynamically control the rate of injection of the lift gas into the well.
-
公开(公告)号:HUE032510T2
公开(公告)日:2017-09-28
申请号:HUE12766555
申请日:2012-09-18
Applicant: ABB INC
Inventor: GREEN JOHN WILLIAM
-
-
-
-
-
-
-