-
公开(公告)号:JPH09125983A
公开(公告)日:1997-05-13
申请号:JP25940796
申请日:1996-09-30
Applicant: ABB RESEARCH LTD
Inventor: FURANTSU YOOSU , TEIMOSHII GURIFUIN , HANSU KOTSUHO
IPC: F01N3/08 , F01N3/24 , F02C3/20 , F02C3/28 , F02C7/26 , F02C9/34 , F23C6/04 , F23C13/00 , F23R3/40 , F23C11/00
Abstract: PROBLEM TO BE SOLVED: To avoid a preload generating a harmful matter by preventing hot gas derived from previously performed combustion from being supplied to a catalyst stage. SOLUTION: In an operation method of a power station plant which is mainly composed of a compressor 4, a combustion unit and a turbine 12, and takes a form in which the combustion unit is composed of an adjusting stage and a combustion chamber for at least a part of combustion air, a part 13a of compressed air 13 from the compressor 4 is mixed with a fuel quantity 14a by being quided through the adjusting stage. An air-fuel mixture reaches a genarator 8, and hydrogen fractionated in the generator is introduced into the combustion chamber. The combustion chamber is composed of a starting burner 1, a catalyst stage 2 and a second combustion stage on its downstream side. An air-fuel mixture 16a fractionated in the generator 8 and another compressed air 13 reach the combustion chamber, and between plural combustion devices in this combustion chamber, interdependent combustion is generated to reduce discharge of a harmful matter in relation to high speed operation of the plant.