-
公开(公告)号:US10668440B2
公开(公告)日:2020-06-02
申请号:US14739612
申请日:2015-06-15
Applicant: Hexion Inc.
Inventor: John W. Green , Jerome F. Borges , Scott E. Spillars , Regie Ahmad , Justin Niles , Leo Elder , Adrian Barajas , Chris E. Higganbotham
Abstract: Dust produced by handling proppant during fracking or other mechanical operations can be a health and/or safety hazard. The dust can be eliminated or at least mitigated using a method of conducting a hydraulic fracturing or other mechanical operation on an oil or gas well including treating a proppant that has been transported to an end use site at a level sufficient to prevent the formation of dust during handling of the proppant.