Method of forming semiconductor composite structure
    1.
    发明专利
    Method of forming semiconductor composite structure 有权
    形成半导体复合结构的方法

    公开(公告)号:JP2011181955A

    公开(公告)日:2011-09-15

    申请号:JP2011111716

    申请日:2011-05-18

    Abstract: PROBLEM TO BE SOLVED: To form a patterned silicon-on-insulator (SOI)/silicon-on-nothing (SON) composite structure by a porous Si technique.
    SOLUTION: A patterned SOI/SON composite structure and a method of forming the same are provided. In the SOI/SON composite structure, a patterned SOI/SON structure is sandwiched between an Si overlayer and a semiconductor substrate. The method of forming the patterned SOI/SON composite structure includes a shared processing treatment step wherein both SOI and SON structures are formed. This invention further provides a method of forming a composite structure including an embedded conductive/SON structure, and a method of forming a composite structure including only an embedded void plane.
    COPYRIGHT: (C)2011,JPO&INPIT

    Abstract translation: 要解决的问题:通过多孔Si技术形成图案化的绝缘体上硅(SOI)/无硅(SON)复合结构。 解决方案:提供了图案化的SOI / SON复合结构及其形成方法。 在SOI / SON复合结构中,图案化SOI / SON结构夹在Si覆层和半导体衬底之间。 形成图案化SOI / SON复合结构的方法包括形成SOI和SON结构的共同处理处理步骤。 本发明还提供一种形成包括嵌入式导电/ SON结构的复合结构的方法,以及形成仅包括嵌入的空隙平面的复合结构的方法。 版权所有(C)2011,JPO&INPIT

    Shared enterprise cloud
    2.
    发明专利

    公开(公告)号:GB2604965A

    公开(公告)日:2022-09-21

    申请号:GB202114741

    申请日:2021-10-15

    Applicant: IBM

    Abstract: A cloud-enterprise resource management system enables sharing of computing resources belonging to different datacenters by one or more clients of a resource pooling and sharing service. Each datacenter of includes a first partition of computing resources and a second partition of computing resources. The first partition is designated as reserved for use by an enterprise operating the datacenter. The second partition is designated as available for use by one or more clients of the resource pooling and sharing service. A workload manager in each datacenter predicts workload and transfers (i) a first computing resource from the first partition to the second partition wherein when the predicted workload is below a first threshold and (ii) a second computing resource from the second partition to the first partition when the predicted workload is above a second threshold.

Patent Agency Ranking