METHODS AND APPARATUS FOR SELECTIVE WORKLOAD OFF-LOADING ACROSS MULTIPLE DATA CENTERS
    1.
    发明公开
    METHODS AND APPARATUS FOR SELECTIVE WORKLOAD OFF-LOADING ACROSS MULTIPLE DATA CENTERS 有权
    多个数据中心工作选择性外包LAST的方法和装置来

    公开(公告)号:EP1891523A4

    公开(公告)日:2009-02-18

    申请号:EP05802961

    申请日:2005-09-30

    Applicant: IBM

    CPC classification number: G06F9/5027 G06F2209/509

    Abstract: Techniques for selectively off-loading workload across multiple data centers are disclosed. For example, a technique for processing a user request in accordance with a multiple data center environment comprises the following steps/operations. A user request is obtained at a first data center. The user request is classified based on one or more classification criterion. At least a portion of a workload associated with the classified user request is off-loaded to at least a second data center to be processed, wherein the off-loading step/operation is at least based on one or more administrative policies associated with at least one of the first data center and the second data center. The workload is processed such that the user request is at least substantially satisfied in accordance with a service level agreement for the requesting user.

    ON-DEMAND APPLICATION RESOURCE ALLOCATION THROUGH DYNAMIC RECONFIGURATION OF APPLICATION CLUSTER SIZE AND PLACEMENT
    2.
    发明申请
    ON-DEMAND APPLICATION RESOURCE ALLOCATION THROUGH DYNAMIC RECONFIGURATION OF APPLICATION CLUSTER SIZE AND PLACEMENT 审中-公开
    通过应用程序集群大小和放置的动态重新配置按需分配应用程序资源

    公开(公告)号:WO2006048364A3

    公开(公告)日:2006-08-03

    申请号:PCT/EP2005055055

    申请日:2005-10-06

    CPC classification number: G06F9/5066 G06F9/5061 G06F9/5083

    Abstract: A method, system and apparatus for on-demand application resource allocation. In accordance with the method of the invention, an anticipated workload can be compared to a measured capacity for an application cluster in one or more server computing nodes in a server farm. If the measured capacity warrants a re-configuration of the application clusters, a new placement can be computed for application server instances in individual ones of the server computing nodes. Subsequently, the new placement can be applied to the server computing nodes in the server farm. In this regard, the applying step can include starting and stopping selected ones of the application server instances in different ones of the server computing nodes to effectuate the new placement.

    Abstract translation: 一种按需应用资源分配的方法,系统和装置。 根据本发明的方法,可以将预期的工作负载与服务器场中的一个或多个服务器计算节点中的应用集群的测量容量进行比较。 如果测量的容量保证应用集群的重新配置,则可以针对各个服务器计算节点中的应用服务器实例计算新的放置。 随后,可以将新的布局应用于服务器场中的服务器计算节点。 就这一点而言,应用步骤可以包括在服务器计算节点中的不同服务器计算节点中启动和停止选择的应用服务器实例以实现新的布局。

    DISTRIBUTION OF DIGITAL CONTENTS USING WEB BROADCAST COMMUNICATION SERVICE

    公开(公告)号:JP2001274788A

    公开(公告)日:2001-10-05

    申请号:JP2001011996

    申请日:2001-01-19

    Applicant: IBM

    Abstract: PROBLEM TO BE SOLVED: To provide users with a method for surely receiving data on a system from a web broadcast communication interface through a plurality of channels. SOLUTION: This method includes a step, where promotion meta data that are available for reception are received through a 1st web broadcast communication channel and at least part of the data is assembled into promotion offering data, a step where data to be received are selected in relation to the above data, a step where data are received from a 2nd web broadcast communication channel, a step where the data are selected from the promotion meta data and encrypted by using a 1st encryption key, and a step where a computer- readable medium receives a 1st encryption decoding key, and the decoding key is used to decode at least part of the encrypted data received from the 2nd web broadcast communication channel.

    METHODS AND APPARATUS FOR SELECTIVE WORKLOAD OFF-LOADING ACROSS MULTIPLE DATA CENTERS
    4.
    发明申请
    METHODS AND APPARATUS FOR SELECTIVE WORKLOAD OFF-LOADING ACROSS MULTIPLE DATA CENTERS 审中-公开
    多种数据中心选择性工作负载关闭的方法和装置

    公开(公告)号:WO2006130170A3

    公开(公告)日:2007-09-13

    申请号:PCT/US2005035323

    申请日:2005-09-30

    CPC classification number: G06F9/5027 G06F2209/509

    Abstract: Techniques for selectively off-loading workload across multiple data centers are disclosed. For example, a technique for processing a user request in accordance with a multiple data center environment comprises the following steps/operations. A user request is obtained at a first data center. The user request is classified based on one or more classification criterion. At least a portion of a workload associated with the classified user request is off-loaded to at least a second data center to be processed, wherein the off-loading step/operation is at least based on one or more administrative policies associated with at least one of the first data center and the second data center. The workload is processed such that the user request is at least substantially satisfied in accordance with a service level agreement for the requesting user.

    Abstract translation: 公开了用于跨多个数据中心选择性地卸载工作负载的技术。 例如,根据多数据中心环境处理用户请求的技术包括以下步骤/操作。 在第一数据中心获得用户请求。 基于一个或多个分类标准对用户请求进行分类。 与分类用户请求相关联的工作负载的至少一部分被卸载到要处理的至少第二数据中心,其中卸载步骤/操作至少基于与至少相关联的一个或多个管理策略 第一个数据中心和第二个数据中心之一。 处理工作量使得用户请求至少基于针对请求用户的服务级别协议而基本上满足。

    TECHNIQUES FOR HEALTH MONITORING AND CONTROL OF APPLICATION SERVERS
    7.
    发明申请
    TECHNIQUES FOR HEALTH MONITORING AND CONTROL OF APPLICATION SERVERS 审中-公开
    应用服务器的健康监测和控制技术

    公开(公告)号:WO2006025892A3

    公开(公告)日:2006-04-27

    申请号:PCT/US2005018369

    申请日:2005-05-25

    Applicant: IBM

    CPC classification number: G06F11/3409 G06F11/1438 G06F2201/81

    Abstract: Techniques for improving application server performance and availability are provided. In one aspect, a method of monitoring the health of one or more application servers comprises the following steps. One or more health classes are specified, each of the one or more health classes defining one or more health policies for the one or more application servers. At least one of the one or more health policies is monitored. Violations, if any, of the one or more health policies are detected.

    Abstract translation: 提供了提高应用服务器性能和可用性的技术。 一方面,一种监视一个或多个应用服务器的健康状况的方法包括以下步骤。 指定一个或多个健康类别,一个或多个健康课程中的每一个为一个或多个应用服务器定义一个或多个运行状况策略。 监控一个或多个健康政策中的至少一个。 检测到一个或多个健康政策的违规行为(如果有的话)。

    COORDINATING SERVICE PERFORMANCE AND APPLICATION PLACEMENT MANAGEMENT
    8.
    发明申请
    COORDINATING SERVICE PERFORMANCE AND APPLICATION PLACEMENT MANAGEMENT 审中-公开
    协调服务业绩和应用场所管理

    公开(公告)号:WO2006037077A2

    公开(公告)日:2006-04-06

    申请号:PCT/US2005034933

    申请日:2005-09-28

    CPC classification number: G06F9/505

    Abstract: Provides apparatus, systems and methods for coordinating tasks of performance management and application placement management in a dynamic fashion. An example process is dynamic in the face of fluctuations in the request load to the distributed computer system and the periodic adjustments to the placement of applications onto servers in said distributed computer system. There are two opposite functional flows in said process: a demand estimation function and a capacity adjustment function. The coordination system involves two subsystems: a demand estimator and a capacity adjuster, along with appropriate interfaces to of the performance manager and the application placement manager. This results in application placement process reacting quicker to demand fluctuations, performance guarantees are better met by rearranging the resources to be allocated to the various classes of service, and the management system works in an unsupervised mode, thus reducing manual administration costs and human errors.

    Abstract translation: 提供用于以动态方式协调绩效管理和应用程序安置管理任务的设备,系统和方法。 面向分布式计算机系统的请求负载波动和对应用程序在所述分布式计算机系统中的服务器上的放置的周期性调整,示例过程是动态的。 所述过程中有两个相反的功能流程:需求估计功能和容量调整功能。 协调系统包括两个子系统:需求估计器和容量调整器,以及性能管理器和应用程序布局管理器的适当接口。 这导致应用放置过程更快地响应需求波动,通过重新分配分配给各种类别的服务的资源,更好地满足性能保证,管理系统以无监督的模式工作,从而减少手动管理成本和人为错误。

    METHODS AND APPARATUS FOR SELECTIVE WORKLOAD OFF-LOADING ACROSS MULTIPLE DATA CENTERS

    公开(公告)号:CA2610371A1

    公开(公告)日:2006-12-07

    申请号:CA2610371

    申请日:2005-09-30

    Applicant: IBM

    Abstract: Techniques for selectively off-loading workload across multiple data centers are disclosed. For example, a technique for processing a user request in accordance with a multiple data center environment comprises the following steps/operations. A user request is obtained at a first data center. The user request is classified based on one or more classification criterion. At least a portion of a workload associated with the classified user request is off- loaded to at least a second data center to be processed, wherein the off- loading step/operation is at least based on one or more administrative policies associated with at least one of the first data center and the second data center. The workload is processed such that the user request is at least substantially satisfied in accordance with a service level agreement for the requesting user.

    10.
    发明专利
    未知

    公开(公告)号:AT472782T

    公开(公告)日:2010-07-15

    申请号:AT00302244

    申请日:2000-03-20

    Applicant: IBM

    Abstract: A method for receiving digital content data on a user's system for playing or recording, the content data being compressed and encrypted with a first encrypting key, said method comprising the steps of: tuning a receiver to a selected frequency; receiving content data through a broadcast transmission at the selected frequency; assembling the content data that is received; and transferring the content data to a player for playing the content data after all the content data has been received. In accordance with another embodiment of the present invention, an information processing system and computer readable medium is disclosed for carrying out the above method.

Patent Agency Ranking