Providing dynamic latency in an integration flow

    公开(公告)号:GB2528949A

    公开(公告)日:2016-02-10

    申请号:GB201413977

    申请日:2014-08-07

    Applicant: IBM

    Abstract: A workload manager component manages an integration flow connecting multiple integration nodes and including at least one repeat node. The repeat node may repeat by sending a message, a variation of a message, or an element of a message to multiple paths or to a single path multiple times; registering a repeat node for monitoring with the workload manager component; collecting data relating to the effect on performance by the integration flow including the monitored repeat node; determining required latencies or variations of latencies between firing of repeats of the repeat node based on the collected data; instructing the latencies or variations of latencies between firing of the repeats of the repeat node to influence dynamically a flow of elements through the repeat node. Priority may be used to weight latency, and its affect on applications assessed, by collecting data from systems resources, applications or resources in the integration flow and service level agreement components for a service orientated architecture using an enterprise service bus.

Patent Agency Ranking