Abstract:
PROBLEM TO BE SOLVED: To provide a wireless communication infrastructure entity in a wireless communication system implementing an uplink control channel using a narrow band frequency resource within a broad band frequency resource. SOLUTION: This entity 500 includes a controller 520 communicably coupled to a transceiver 510, wherein the controller 520 is configured to cause the transceiver 510 to signal a change of the location for an uplink control channel within the wide band frequency resource. The uplink control channel includes at least a pair of uplink control channels separated within the wide band frequency resource and accommodates to simultaneous uplink transmissions by a plurality of user apparatuses communicating in the wireless communication system. COPYRIGHT: (C)2010,JPO&INPIT
Abstract:
A wireless communication entity schedulable in a -wireless communication network, including a controller (603) communicably coupled to a power amplifier (608) wherein the controller varies a maximum transmit power of the wireless communication entity based on the radio resource assignment information receiver by the radio receiver.
Abstract:
A wireless communication entity schedulable in a wireless communication network, including a controller (603) communicably coupled to a power amplifier (608), wherein the controller varies a spectrum emissions level of the wireless communication entity based on the radio resource assignment information receiver by the radio receiver.
Abstract:
A method in a wireless communication network infrastructure scheduling entity (102), including allocating a radio resource to a schedulable wireless communication entity in the wireless communication network, the radio resource allocated based on a maximum power available to the schedulable wireless communication entity for the radio resource allocated, the radio resource allocated based on an interference impact of the schedulable wireless communication entity operating on the radio resource allocated.
Abstract:
A wireless communication entity schedulable in a wireless communication network, including a controller (603) communicably coupled to a power amplifier (608), wherein the controller varies a spectrum emissions level of the wireless communication entity based on the radio resource assignment information receiver by the radio receiver.
Abstract:
A method in a wireless communication network infrastructure scheduling entity (102), including allocating a radio resource to a schedulable wireless communication entity in the wireless communication network, the radio resource allocated based on a maximum power available to the schedulable wireless communication entity for the radio resource allocated, the radio resource allocated based on an interference impact of the schedulable wireless communication entity operating on the radio resource allocated.
Abstract:
Entidad de infraestructura de comunicaciones inalámbricas en un sistema de comunicaciones inalámbricas que implementa un canal de control de enlace ascendente usando un recurso de frecuencia de banda corta dentro de un recurso de frecuencia de banda ancha. La entidad incluye un controlador acoplado en comunicacion al transceptor, donde el controlador está configurado para hacer que el transceptor senalice un cambio de localizacion de un canal de control de enlace ascendente dentro del recurso de frecuencia de banda ancha. El canal de control de enlace ascendente incluye al menos un par de canales de control de enlace ascendente separados dentro del recurso de frecuencia de banda ancha y da lugar a transmisiones de enlace ascendente simultáneas por parte de multiples equipos de usuario que se comunican en el sistema de comunicaciones inalámbricas.