Abstract:
A production management method includes the steps of: pre-storing production information including delivery date information, manufacturing apparatus information and lot information; calculating a scheduled shipping date for each lot on the basis of the production information; reading a delivery date of the lot; calculating the number of delay days of the lot; outputting an alarm to the lot when the number of delay days is a positive number; and analyzing the main cause of the delay of the lot and generating an expedite instruction when the number of delay days is larger than 1.