-
公开(公告)号:US20160171442A1
公开(公告)日:2016-06-16
申请号:US14881084
申请日:2015-10-12
Applicant: REDZONE ROBOTICS, INC.
Inventor: SUBRAMANIAN VALLAPUZHA , ERIC C. CLOSE
IPC: G06Q10/10
CPC classification number: F16L55/32 , B23K9/0956 , B23K9/1274 , G01B11/24 , G01N21/954 , G01N2021/9544 , G01N2021/9548 , G06Q10/06 , G06Q10/10
Abstract: One aspect provides a method, including: storing an infrastructure project summary report with one or more other infrastructure project reports pooled in a database of project summary reports; the infrastructure project report being prepared via accessing fluid conveyance infrastructure summary data describing a condition of a fluid conveyance infrastructure segment; and using a processor of an electronic device to match the infrastructure project summary report with one or more other infrastructure project reports pooled in the database of project summary reports. Other aspects are described and claimed.
Abstract translation: 一个方面提供了一种方法,包括:将基础设施项目摘要报告与一个或多个其他基础设施项目报告合并在项目摘要报告的数据库中; 该基础设施项目报告正在通过访问流体输送基础设施概述数据来描述流体输送基础设施部分的状况; 并使用电子设备的处理器将基础设施项目总结报告与集合在项目摘要报告数据库中的一个或多个其他基础架构项目报告相匹配。 描述和要求保护其他方面。
-
公开(公告)号:US20190156531A1
公开(公告)日:2019-05-23
申请号:US16249424
申请日:2019-01-16
Applicant: RedZone Robotics, Inc.
Inventor: SUBRAMANIAN VALLAPUZHA , ERIC C. CLOSE
CPC classification number: G06T11/206 , B23K9/0956 , B23K9/1274 , F16L55/32 , G01B11/24 , G01N21/954 , G01N2021/9544 , G01N2021/9548 , G06Q10/06 , G06Q10/10 , G06Q10/30 , G06Q30/0611 , G06T3/0037 , G06T7/0004 , G06T2207/10028 , H04N7/183
Abstract: An embodiment provides for storing, in a server, pipe segment data, e.g., pipe scan data derived from a pipe inspection robot that traversed through an interior of the segment of pipe. The pipe scan data may include three-dimensional (3D) and two-dimensional (2D) image data of the interior of the segment of pipe, where the 2D image data includes a flat graph formed from the 3D image data. In one example, infrastructure summary data is stored in the server, including a level of corrosion and a level of sediment buildup determined based on the pipe scan data. An infrastructure project summary report is based on the infrastructure summary data, and after receiving a request from a client device, the pipe segment data and the infrastructure project summary report are transmitted to the client device.
-