Method of Making Safe an Undersea Bottom-to-Surface Production Pipe When Production is Stopped

    公开(公告)号:US20210164312A1

    公开(公告)日:2021-06-03

    申请号:US17171816

    申请日:2021-02-09

    Applicant: SAIPEM S.A.

    Abstract: Installation for producing fluid such as crude oil having a floating support having at least two tanks, an undersea bottom-to-surface connection pipe having a first pipe portion on the sea bottom from a well head to the bottom end of a second pipe portion at the floating support, a first auxiliary pipe for transporting gas extending from the floating support to the bottom end of the second pipe, and a plurality of valves for isolating or putting into communication the first auxiliary pipe, for isolating or putting into communication the first production pipe portion and the second production pipe portion, end to end, and suitable for isolating or putting into communication the proximal end of the first production pipe portion and the bottom end either of a fourth auxiliary pipe rising directly to the surface, or a bottom portion of the first auxiliary pipe.

    Method of Making Safe an Undersea Bottom-to-Surface Production Pipe When Production is Stopped

    公开(公告)号:US20180298712A1

    公开(公告)日:2018-10-18

    申请号:US15956104

    申请日:2018-04-18

    Applicant: SAIPEM S.A.

    Abstract: Method of stopping production and making safe an undersea bottom-to-surface connection production pipe having a first pipe portion on the sea bottom from a well head to the bottom end of a second pipe portion extending to a ship or floating support. After stopping production, depressurization of the entire undersea bottom-to-surface connection production pipe is performed. Thereafter, the following steps are preformed: isolating the first production pipe portion from the second pipe portion, and leaving the production fluid in the first production pipe portion, but not in said second pipe portion, depressurizing the first production pipe portion filled with production fluid by reducing the pressure in the first pipe portion and by discharging more completely the gas contained in the production fluid that it contains.