-
公开(公告)号:US20210004953A1
公开(公告)日:2021-01-07
申请号:US16863093
申请日:2020-04-30
Applicant: SAS INSTITUTE INC.
Inventor: Sharmin Pathan , Hamza Mustafa Ghadyali , Xunlei Wu , Ivan Borges Oliveira
IPC: G06T7/00 , G05B19/418 , G06N3/08 , G06F16/9035
Abstract: A computing system obtains image data capturing first and second objects. The system determines, based on user-identified data points, boundaries of the objects and generates a component of a dataset by computing a first data value related to an attribute of a key point in the first image; and computing a second data value related to an attribute of a key point in the first image. The system generates a second component of the dataset, the second component representing updated relative information between the first and second object by generating predicted changes in the first data value and second data value for the second image. The system computes a third data value and a fourth data value related to respective data points in a first and second polygon in the second image. The generating the updated relative information is based on the predicted changes and computed values.
-
公开(公告)号:US20190370836A1
公开(公告)日:2019-12-05
申请号:US16425341
申请日:2019-05-29
Applicant: SAS Institute Inc.
Inventor: Natalia Summerville , Ivan Borges Oliveira , Scott Shuler , Golbarg Tutunchi , Fang Liang
IPC: G06Q30/02
Abstract: Managing the amount of computing resources required to execute a process for determining values of a parameter associated with an object over a lifetime of the object is disclosed here. In one example, a data structure is generated. The data structure including candidate values for the parameter that comply with constraints assigned to multiple dates occurring during the lifetime of the object. The data structure is pruned by aggregating actionable periods. A first combination of candidate values associated with the aggregated actionable periods is determined that results in the minimum amount of the object being provided to the users during the lifetime. A second combination of candidate values associated with the aggregated actionable periods is determined that satisfies a return objective. The second combination of values are usable by a remote computing device to implement a value schedule for the object.
-
公开(公告)号:US10540669B2
公开(公告)日:2020-01-21
申请号:US16425341
申请日:2019-05-29
Applicant: SAS Institute Inc.
Inventor: Natalia Summerville , Ivan Borges Oliveira , Scott Shuler , Golbarg Tutunchi , Fang Liang
Abstract: Managing the amount of computing resources required to execute a process for determining values of a parameter associated with an object over a lifetime of the object is disclosed here. In one example, a data structure is generated. The data structure including candidate values for the parameter that comply with constraints assigned to multiple dates occurring during the lifetime of the object. The data structure is pruned by aggregating actionable periods. A first combination of candidate values associated with the aggregated actionable periods is determined that results in the minimum amount of the object being provided to the users during the lifetime. A second combination of candidate values associated with the aggregated actionable periods is determined that satisfies a return objective. The second combination of values are usable by a remote computing device to implement a value schedule for the object.
-
-