-
公开(公告)号:WO2010142001A2
公开(公告)日:2010-12-16
申请号:PCT/AU2010000732
申请日:2010-06-14
Applicant: TECH RESOURCES PTY LTD , BARON ALISTAIR
Inventor: BARON ALISTAIR
CPC classification number: E21C41/00 , E21C35/24 , G05B2219/13 , G06Q10/06311
Abstract: A system for scheduling mine activities is disclosed. The system comprises a plurality of sources of operational data indicative of scheduling relevant information associated with a plurality of mine operations, at least some of which are interdependent, a scheduling facility remotely disposed relative to the mine operations, the scheduling facility comprising at least one display, and a communications network arranged to facilitate transfer of the operational data from the mine operations to the scheduling facility. The scheduling facility is arranged to use the operational data to display scheduling relevant information indicative of the status of a production workflow such that a scheduling operator at the scheduling facility is provided with an overview of production workflow across at least the interdependent mine operations.
Abstract translation: 披露了排雷活动安排制度。 该系统包括多个操作数据源,指示与多个矿井操作相关联的调度相关信息,其中至少一些是相互依赖的,相对于矿井操作远程设置的调度设施,该调度设施包括至少一个显示器 以及布置成便于将操作数据从矿井操作传送到调度设施的通信网络。 调度设施被布置成使用操作数据来显示指示生产工作流程状态的调度相关信息,使得在调度设施处的调度运营商至少在至少相互依赖的矿井操作中提供生产工作流的概述。
-
公开(公告)号:AU2010258105B2
公开(公告)日:2014-11-27
申请号:AU2010258105
申请日:2010-06-14
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
Abstract: A system for scheduling mine activities is disclosed. The system comprises a plurality of sources of operational data indicative of scheduling relevant information associated with a plurality of mine operations, at least some of which are interdependent, a scheduling facility remotely disposed relative to the mine operations, the scheduling facility comprising at least one display, and a communications network arranged to facilitate transfer of the operational data from the mine operations to the scheduling facility. The scheduling facility is arranged to use the operational data to display scheduling relevant information indicative of the status of a production workflow such that a scheduling operator at the scheduling facility is provided with an overview of production workflow across at least the interdependent mine operations.
-
公开(公告)号:AU2012101082B4
公开(公告)日:2013-05-09
申请号:AU2012101082
申请日:2012-07-19
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
Abstract: A method of integrating the operations of a plurality of mine sites and associated infrastructure distributed 5 across at least one regional area and producing one or more bulk commodities is disclosed. The method comprises the steps of scheduling mining activities at each one of the plurality of mine sites so as to produce a scheduled level of ore at each mine site and associated 10 infrastructure, and transmitting operational data from equipment at each one of the plurality of mine sites to an operations facility common to the plurality of mine sites and associated infrastructure. The method also comprises selecting a sub-set of the operational data from each mine 15 site and associated infrastructure and displaying information indicative of the sub-sets at the operations facility to identify a production rate from one or more of the mine sites and associated infrastructure below the scheduled level of production, and re-scheduling the 20 mining activities at one or more of the mine sites and/or associated infrastructure in response to identifying a production rate at a mine site or associated infrastructure below a scheduled rate so as to minimise any reduction to aggregate output from the plurality of 25 mine sites. 2981962_1 (GHMatters) P81250.AU 2
-
公开(公告)号:AU2016213833A1
公开(公告)日:2016-09-01
申请号:AU2016213833
申请日:2016-08-11
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
Abstract: A system is disclosed for scheduling mine activities. The system comprises a plurality of data gathering devices 5 arranged to gather data indicative of the status of mine activities at a plurality of interdependent mine operations including at least one mine site, at least one port facility and at least one rail network. The system also comprises a scheduling facility remotely disposed 10 relative to the interdependent mine operations, and a communications network arranged to facilitate transfer of the data indicative of the status of mine activities at a plurality of interdependent mine operations from the mine operations to the scheduling facility. The scheduling 15 facility is arranged to communicate the data indicative of the status of mine activities at a plurality of interdependent mine operations to a scheduling operator at the monitoring facility. 80779681 (GHMatters) P81250.AU.8 11/08/16
-
公开(公告)号:AU2010258105B9
公开(公告)日:2015-07-16
申请号:AU2010258105
申请日:2010-06-14
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
IPC: G06Q10/06
Abstract: A mine operation monitoring system a plurality of mine equipment interfaces each being located at a mine operation and being associated with at least one item of mine equipment, each mine equipment interface being arranged to monitor operation of the at least one associated item of mine equipment. A plurality of monitoring stations is located remotely to the mine operations and is arranged to communicate with at least one equipment interface associated with a different mine operation so as to monitor operation of at least one item of mine equipment associated with said at least one equipment interface from the remote locations. A plurality of local monitoring stations located at respective mine operations monitors operation of the one time of equipment associated with the one interface. A communications network is arranged to facilitate communications between the equipment interfaces, the local monitoring stations and the remote monitoring stations.
-
公开(公告)号:AU2010258105A1
公开(公告)日:2012-01-19
申请号:AU2010258105
申请日:2010-06-14
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR
Abstract: A system for scheduling mine activities is disclosed. The system comprises a plurality of sources of operational data indicative of scheduling relevant information associated with a plurality of mine operations, at least some of which are interdependent, a scheduling facility remotely disposed relative to the mine operations, the scheduling facility comprising at least one display, and a communications network arranged to facilitate transfer of the operational data from the mine operations to the scheduling facility. The scheduling facility is arranged to use the operational data to display scheduling relevant information indicative of the status of a production workflow such that a scheduling operator at the scheduling facility is provided with an overview of production workflow across at least the interdependent mine operations.
-
公开(公告)号:ZA201200188B
公开(公告)日:2013-01-30
申请号:ZA201200188
申请日:2012-01-10
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , ANDREW WHITE
IPC: G06Q10/06 , E21C20060101
Abstract: A mine operation monitoring system a plurality of mine equipment interfaces each being located at a mine operation and being associated with at least one item of mine equipment, each mine equipment interface being arranged to monitor operation of the at least one associated item of mine equipment. A plurality of monitoring stations is located remotely to the mine operations and is arranged to communicate with at least one equipment interface associated with a different mine operation so as to monitor operation of at least one item of mine equipment associated with said at least one equipment interface from the remote locations. A plurality of local monitoring stations located at respective mine operations monitors operation of the one time of equipment associated with the one interface. A communications network is arranged to facilitate communications between the equipment interfaces, the local monitoring stations and the remote monitoring stations.
-
公开(公告)号:AU2012101082A4
公开(公告)日:2012-08-16
申请号:AU2012101082
申请日:2012-07-19
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
Abstract: A method of integrating the operations of a plurality of mine sites and associated infrastructure distributed 5 across at least one regional area and producing one or more bulk commodities is disclosed. The method comprises the steps of scheduling mining activities at each one of the plurality of mine sites so as to produce a scheduled level of ore at each mine site and associated 10 infrastructure, and transmitting operational data from equipment at each one of the plurality of mine sites to an operations facility common to the plurality of mine sites and associated infrastructure. The method also comprises selecting a sub-set of the operational data from each mine 15 site and associated infrastructure and displaying information indicative of the sub-sets at the operations facility to identify a production rate from one or more of the mine sites and associated infrastructure below the scheduled level of production, and re-scheduling the 20 mining activities at one or more of the mine sites and/or associated infrastructure in response to identifying a production rate at a mine site or associated infrastructure below a scheduled rate so as to minimise any reduction to aggregate output from the plurality of 25 mine sites. 2981962_1 (GHMatters) P81250.AU 2
-
公开(公告)号:CL2011003137A1
公开(公告)日:2012-07-20
申请号:CL2011003137
申请日:2011-12-12
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
Abstract: UN SISTEMA Y MÉTODO PARA PROGRAMAR LAS ACTIVIDADES DE UNA MINA, QUE COMPRENDE UNA PLURALIDAD DE FUENTES DE INFORMACIÓN OPERACIONAL INDICATIVA DE INFORMACIÓN DE PROGRAMACIÓN RELEVANTE ASOCIADA CON UNA PLURALIDAD DE SITIOS DE LA MINA E INFRAESTRUCTURA ASOCIADA, LA INFRAESTRUCTURA ASOCIADA INCLUYE UNA RED FERROVIARIA EN SERVICIO A LOS SITIOS DE LA MINA Y UNA PLURALIDAD DE TRENES ASOCIADOS A LA RED FERROVIARIA; UNA INSTALACIÓN DE PROGRAMACIÓN REMOTAMENTE COLOCADA RELATIVA A AL MENOS ALGUNO DE LOS SITIOS DE LA MINA E INFRAESTRUCTURA ASOCIADA, LA INSTALACIÓN DE PROGRAMACIÓN COMPRENDE AL MENOS UN VISUALIZADOR; Y UNA RED DE COMUNICACIONES AJUSTADA PARA FACILITAR A TRANSFERENCIA DE LA INFORMACIÓN OPERACIONAL DESDE LOS SITIOS DE LA MINA E INFRAESTRUCTURA ASOCIADA, A LA INSTALACIÓN DE PROGRAMACIÓN, LA INFORMACIÓN OPERACIONAL INCLUYENDO INFORMACIÓN INDICATIVA DE UNA TASA DE PRODUCCIÓN DE MINERAL DESDE LOS SITIOS DE LA MINA E INFRAESTRUCTURA ASOCIADA Y DE LAS UBICACIONES DE LOS TRENES EN LA RED FERROVIARIA; LA INSTALACIÓN DE PROGRAMACIÓN SIENDO AJUSTADA PARA USAR LA INFORMACIÓN OPERACIONAL PARA VISUALIZAR LA INFORMACIÓN RELEVANTE DE PROGRAMACIÓN INDICATIVA DEL ESTATUS DE UNA TASA DE PRODUCCIÓN DE MINERAL DESDE LOS SITIOS DE LA MINA E INFRAESTRUCTURA ASOCIADA, DE FORMA QUE UN OPERADOR DE PROGRAMACIÓN EN LA INSTALACIÓN DE PROGRAMACIÓN ES PROVISTO DE UN PANORAMA DEL FLUJO DE TRABAJO DE PRODUCCIÓN A TRAVÉS DE LOS SITIOS DE LA MINA E INFRAESTRUCTURA ASOCIADA; Y ES CAPAZ DE DETERMINAR UNA TASA DE PRODUCCIÓN EN UN SITIO DE LA MINA BAJO UNA TASA DE PRODUCCIÓN PROGRAMADA Y EN RESPUESTA SI REPROGRAMAR AL MENOS UN TREN EN LA RED FERROVIARIA, DE MANERA QUE MINERAL ES CARGADO EN AL MENOS UN TREN EN UN SITIO DE LA MINA ALTERNATIVO AL SITIO DE LA MINA QUE EXPERIMENTA UNA TASA DE PRODUCCIÓN BAJO LA TASA DE PRODUCCIÓN PROGRAMADA.
-
公开(公告)号:CA2765234C
公开(公告)日:2019-01-08
申请号:CA2765234
申请日:2010-06-14
Applicant: TECH RESOURCES PTY LTD
Inventor: BARON ALISTAIR , WHITE ANDREW
Abstract: A system for scheduling mine activities is disclosed. The system comprises a plurality of sources of operational data indicative of scheduling-related information associated with a plurality of mine operations, at least some of which are interdependent, a scheduling facility remotely disposed relative to the mine operations, the scheduling facility comprising at least one display, and a communications network arranged to facilitate transfer of the operational data from the mine operations to the scheduling facility. The scheduling facility is arranged to use the operational data to display scheduling-related information indicative of the status of a production workflow such that a scheduling operator at the scheduling facility is provided with an overview of production workflow across at least the interdependent mine operations.
-
-
-
-
-
-
-
-
-