OUTER PIPE SLEEVE FOR SEA FLOOR MOORING PILE
    1.
    发明申请
    OUTER PIPE SLEEVE FOR SEA FLOOR MOORING PILE 审中-公开
    用于海面运动桩的外管套管

    公开(公告)号:WO2009060049A1

    公开(公告)日:2009-05-14

    申请号:PCT/EP2008/065099

    申请日:2008-11-07

    CPC classification number: E21B7/20 B63B21/27 B63B21/50

    Abstract: The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.

    Abstract translation: 本公开提供了一种用于增加桩上的锚定力的改进的系统和方法。 关于桩的概念可以适用于桩是否退化并且不再能够支撑其预期载荷,或者桩上的载荷已经增加到可能过度施加桩的水平。 即使在海底条件下也可以安装套筒,并且可以用于为现有桩提供额外的固定力。 套筒可以包括用于将锚定线或其它联接构件联接到要固定的结构的自己的垫。 套筒还可包括与至少一个纵向构件联接在一起的环组件。 具有彼此隔开一定距离的环的组件可以有助于减小套筒上安装在海底上的安装摩擦力。

    A Method of Installing Pin Piles into a Seabed
    2.
    发明申请
    A Method of Installing Pin Piles into a Seabed 审中-公开
    将桩桩安装在海床上的方法

    公开(公告)号:WO2014174366A1

    公开(公告)日:2014-10-30

    申请号:PCT/IB2014/000946

    申请日:2014-04-11

    Applicant: TECHNIP FRANCE

    CPC classification number: F16L1/201 E02D5/54 E02D7/00 E02D7/08 E02D7/14 F16L1/16

    Abstract: A method of installing pin piles into a seabed A method of installing a plurality of pin piles into a seabed comprising at least the steps of: (a) lowering a pin pile apparatus comprising a first pin pile and an attached clump weight towards the seabed; (b) allowing the first pin pile to self-penetrate the seabed based on self-weight of the pin pile apparatus and the momentum from step (a) until the clump weight reaches the sea bed; (c) disconnecting the clump weight from the first pin pile; and (d) recovering the clump weight for use with a second pin pile and repeating steps (a)-(c). In this way, the pin piles are easily installed from their descent to the seabed with the clump weight, which can then be removed and applied to the next pin pile in an easy and repeatable operation without requiring a suction apparatus or hammer or drill.

    Abstract translation: 一种将销桩安装在海床中的方法将多个销桩安装在海底中的方法,至少包括以下步骤:(a)将包括第一桩桩和附着的重量的针桩设备降低到海底; (b)允许第一针桩基于针桩装置的自重自重穿透海床,并且从步骤(a)到达重量达到海床的动量; (c)从第一针桩断开团块重量; 和(d)回收与第二针桩一起使用的重量,并重复步骤(a) - (c)。 以这种方式,销桩很容易从下沉到海床,并且可以以简单且可重复的操作将其卸下并施加到下一个针桩上,而不需要抽吸装置或锤子或钻头。

    A METHOD OF INSTALLING PIN PILES INTO A SEABED
    4.
    发明公开
    A METHOD OF INSTALLING PIN PILES INTO A SEABED 有权
    VERFAHREN ZUM INSTALLIEREN VONSTIFTPFÄHLENAUF DEM MEERESGRUND

    公开(公告)号:EP2989258A1

    公开(公告)日:2016-03-02

    申请号:EP14736017.6

    申请日:2014-04-11

    Applicant: Technip France

    CPC classification number: F16L1/201 E02D5/54 E02D7/00 E02D7/08 E02D7/14 F16L1/16

    Abstract: A method of installing pin piles into a seabed A method of installing a plurality of pin piles into a seabed comprising at least the steps of: (a) lowering a pin pile apparatus comprising a first pin pile and an attached clump weight towards the seabed; (b) allowing the first pin pile to self-penetrate the seabed based on self-weight of the pin pile apparatus and the momentum from step (a) until the clump weight reaches the sea bed; (c) disconnecting the clump weight from the first pin pile; and (d) recovering the clump weight for use with a second pin pile and repeating steps (a)-(c). In this way, the pin piles are easily installed from their descent to the seabed with the clump weight, which can then be removed and applied to the next pin pile in an easy and repeatable operation without requiring a suction apparatus or hammer or drill.

    Abstract translation: 一种将多个销桩安装在海床中的方法,至少包括以下步骤:(a)将包括第一针桩和附着的重量的针桩装置降低到海底; (b)允许第一针桩基于针桩设备的自重和从步骤(a)的动量直到团块重量到达海床自身穿透海床; (c)从第一针桩断开团块重量; 和(d)回收与第二针桩一起使用的重量,并重复步骤(a) - (c)。 以这种方式,销桩可以轻易地从下沉到海床,并且可以以简单且可重复的操作将其卸下并施加到下一个销桩上,而不需要抽吸装置或锤子或钻头。

    OUTER PIPE SLEEVE FOR SEA FLOOR MOORING PILE
    5.
    发明公开
    OUTER PIPE SLEEVE FOR SEA FLOOR MOORING PILE 审中-公开
    FOR DALBE在海床上的管的外覆盖件

    公开(公告)号:EP2220329A1

    公开(公告)日:2010-08-25

    申请号:EP08847107.3

    申请日:2008-11-07

    Applicant: Technip France

    CPC classification number: E21B7/20 B63B21/27 B63B21/50

    Abstract: The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.