Method for preparing multilayer metal composite pipe

    公开(公告)号:US11850645B2

    公开(公告)日:2023-12-26

    申请号:US17509043

    申请日:2021-10-24

    CPC classification number: B21C37/08 B21B25/00 B21C1/22 B21C3/06

    Abstract: A method for preparing a multilayer metal composite pipe includes steps of: internally and externally grinding blank pipes; cleaning oil stains; assembling a multilayer metal pipe; drawing to reduce a diameter; performing high-speed friction welding at the pipe ends; performing heat treatment; performing four-roller cross-rolling; straightening; performing two-roller cold-rolling; performing cold-drawing to reduce the diameter; performing cold-expansion to reduce the diameter; performing precise cold-rolling; degreasing; brightening; performing surface grinding; cleaning dust; detecting multilayer metal interface bonding; detecting flaws; testing metal structure performance; and sizing and packaging. By cycling the cold-drawing, the cold-expansion, and the precision cold-rolling, key indicators such as product dimensional accuracy, surface quality, material properties, and crystal grain size can be collaboratively controlled, so as to achieve higher accuracy, better performance, and more outstanding extreme specifications. The present invention solves the problem of inconsistent extension due to differences in metal properties.

    Fatigue bending and folding test device for ultra-thin metal strip

    公开(公告)号:US11965862B1

    公开(公告)日:2024-04-23

    申请号:US18536298

    申请日:2023-12-12

    CPC classification number: G01N3/20 G01N3/066 G01N33/20

    Abstract: A fatigue bending and folding test device for an ultra-thin metal strip, including: a first driver module, a first folding module, a first diameter adjustment module, an expansion module, and a frame. The first driver module, the first folding module, the first diameter adjustment module, and the expansion module are all disposed on the frame. The first driver module includes a servo motor, a coupler, and a drive gearbox; the drive gearbox includes a driving gear shaft, a driven gear shaft, a plurality of output end covers, and a plurality of bearings. The first folding module includes an upper folding member, a lower folding member, and a first mounting base. The first clamping member includes a sliding block, a lower clamping plate, an upper clamping plate, a rotating shaft, an intermediate pressure plate, and a plurality of fixing bolts.

    Method for preparing high-performance difficult-to-deform metal precision seamless pipe

    公开(公告)号:US12157154B2

    公开(公告)日:2024-12-03

    申请号:US17509040

    申请日:2021-10-24

    Abstract: A method for preparing a high-performance difficult-to-deform metal precision seamless pipe includes steps of performing a heat treatment; drilling; externally grinding; internally grinding; straightening; performing four-roller warm-rolling; performing warm-drawing to reduce a diameter; performing warm-expansion to reduce a wall thickness and increase the diameter; performing precise cold-rolling; degreasing; brightening; performing surface grinding; cleaning dust; detecting flaws; testing metal structure performance; and sizing and packaging. By cycling the warm-drawing, the warm-expansion, and the precision cold-rolling, key indicators such as product dimensional accuracy, surface quality, material properties, and crystal grain size can be collaboratively controlled, to achieve higher accuracy, better performance, and more outstanding extreme specifications. Product requirements of different hard-to-deform metal materials and different product specifications can be satisfied, to flexibly prepare metal pipe products with different material characteristics, which greatly improves production efficiency and effectively reduces production costs.

Patent Agency Ranking