-
公开(公告)号:US20230086699A1
公开(公告)日:2023-03-23
申请号:US17787017
申请日:2020-12-16
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Ewan MACHEFAUX , Juan Pablo MURCIA
Abstract: Aspects of the present invention relate to a method for determining annual energy production of a wind farm. The method comprises: receiving a definition of the wind farm; modelling the wind field of the wind farm for a plurality of freestream wind speeds in a plurality of wind directions; defining locations for virtual measurement masts upstream of upstream turbines in each wind direction at a clearance from each upstream turbine for identifying wind farm blockage effects; determining a wind farm blockage factor for each freestream wind speed in each wind direction based on data from the virtual measurement masts; receiving measurements from a physical measurement mast located at the site of the wind farm; and determining an annual energy production for the wind farm based on adjusted wind speeds obtained by applying the blockage factors to measurements from the physical measurement mast.
-
公开(公告)号:US20210123416A1
公开(公告)日:2021-04-29
申请号:US17054152
申请日:2019-05-02
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Jakob VESTERGAARD , Anders Steen NIELSEN , Juan Pablo MURCIA
Abstract: A method of operating a wind turbine. The wind turbine is operated over an operating period in accordance with a control strategy. A sensor signal is received over the operating period from a sensor measuring an operational parameter of the turbine. A model is used to obtain a modelled fatigue value based on the sensor signal. The modelled fatigue value provides an estimate of fatigue loading applied to a component of the turbine over the operating period. The control strategy is modified based on the modelled fatigue value.
-