-
公开(公告)号:US12272948B1
公开(公告)日:2025-04-08
申请号:US18862937
申请日:2023-05-03
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Mads Rajczyk Skjelmose , Ines Pereira Barreira , Kouroush Nayebi
Abstract: Operating a renewable energy power includes receiving a measurement signal indicative of a measured power characteristic of the plant at a point of connection to a power network; controlling the plant 12) according to a normal mode of operation to provide power by determining and dispatching power set points, the power set points being determined by: acquiring samples of the measurement signal at a sample rate; and determining the power set points based on the sampled measurements and a target level for the measured power characteristic; and monitoring the measurement signal to detect an undersampled oscillation of the measured power characteristic in the sampled measurements, and thereby detecting a control fault; and then controlling the plant according to a fault mode of operation.
-
2.
公开(公告)号:US10539118B2
公开(公告)日:2020-01-21
申请号:US16312541
申请日:2017-07-05
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Steve Jessen , Søren Kappelgaard , Jacob Barsøe Kjærgaard , Kouroush Nayebi , Mads Rajczyk Skjelmose , Mu Wei
Abstract: A wind power plant has a plurality of wind turbine generators and a power plant controller arranged to communicate with the plurality of wind turbines generators. Each wind turbine generator has a controller arranged to control an active power output in its respective wind turbine generator according to an active power set point received from the wind power plant controller. A change in the active power reference changes the active power set point for each wind turbine generator by a weighting factor.
-
公开(公告)号:US12155220B2
公开(公告)日:2024-11-26
申请号:US17914704
申请日:2021-03-05
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Mads Rajczyk Skjelmose , Henrik Møller , Kouroush Nayebi
Abstract: The invention relates to a method for providing power ramp rate control of a hybrid power plant with a plurality of energy assets including wind turbine generators and possibly solar power units, and an energy storage unit. Each energy asset has a ramp rate capability defined as the highest possible ramp rate at a given time, and the method includes receiving from each energy asset the corresponding ramp rate capability, and taking into account the ramp rate capabilities from the energy assets when calculating the power setpoint to each energy asset, so as to improve the power ramp rate control of the hybrid power plant.
-
公开(公告)号:US11936188B2
公开(公告)日:2024-03-19
申请号:US17278128
申请日:2019-09-10
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Henrik Møller , Mads Rajczyk Skjelmose
CPC classification number: H02J3/381 , H02J3/46 , H02J2300/24 , H02J2300/28
Abstract: The invention relates to a hybrid power plant for producing power to the electrical grid, the hybrid power plant comprising a plurality of energy assets; a first renewable power generating unit, such as wind turbine generators, a second renewable power generating unit, such as a plurality of solar power units, and an energy storage unit, such as a battery energy storage system. A power plant controller is arranged to perform a first comparison of an active power reference with an available power from the first and the second renewable power generating units and performing a second comparison of available charging, or discharging, capability of the energy storage unit with said first comparison. In response to this first comparison, set points are distributed to the first and the second renewable power generating units so as to deliver power from the hybrid power plant in accordance with the received active power reference.
-
公开(公告)号:US12264651B2
公开(公告)日:2025-04-01
申请号:US17616116
申请日:2020-05-04
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Mads Rajczyk Skjelmose , Steve Jessen
IPC: F03D7/04 , F03D7/02 , G05B19/042 , H02J3/38 , H02J3/46
Abstract: The invention relates to a method for controlling power generation from a power plant which comprises power generating units such as wind turbine generators. The power generating units are controllable to produce power dependent on individual power set-points. The method comprises steps of obtaining desired target power set-points for one or more prioritized power generating units, determining final target power set-points for the one or more prioritized power generating units based on the target power set-points and an available power adjustment margin of the power plant which is available for adjustment of the power set-points of the one or more prioritized power generating units, and dispatching the final target power set-points to the prioritized power generating units.
-
公开(公告)号:US20230411966A1
公开(公告)日:2023-12-21
申请号:US17914704
申请日:2021-03-05
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Mads Rajczyk Skjelmose , Henrik Møller , Kouroush Nayebi
CPC classification number: H02J3/46 , H02J3/381 , H02J2300/28
Abstract: The invention relates to a method for providing power ramp rate (RR) control of a hybrid power plant (100) with a plurality of energy assets (EA1, EA2, EA3) including wind turbine generators (WTG1, WTG2, WTG3) and possibly solar power units (PV1, PV2, PV3, 102), and an energy storage unit (ESU), Each energy asset has a ramp rate capability (RRC_i) defined as the highest possible ramp rate at a given time, and the method includes receiving from each energy asset the corresponding ramp rate capability, and taking into account the plurality of ramp rate capabilities from the energy assets when calculating the power setpoint (Pset_i) to each energy asset, so as to improve the power ramp rate (RR) control of the hybrid power plant (100).
-
7.
公开(公告)号:US11174840B2
公开(公告)日:2021-11-16
申请号:US16312655
申请日:2017-07-05
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Steve Jessen , Søren Kappelgaard , Jacob Barsøe Kjærgaard , Kouroush Nayebi , Mads Rajczyk Skjelmose , Mu Wei
Abstract: A wind power plant supplies power to a utility grid in accordance with an active power reference, where the wind power plant comprises a plurality of wind turbine generators and a power plant controller arranged to send an active power set point to the wind turbine controller of each of the plurality of wind turbine generators.
-
公开(公告)号:US12261436B2
公开(公告)日:2025-03-25
申请号:US17787527
申请日:2020-12-16
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Mu Wei , Mads Rajczyk Skjelmose
Abstract: The invention relates to a method for controlling power generation from a power plant which comprises a plurality of power generating units. The method involves setting a maximal allowed power production for each power generating unit in a selection of one or more power generating units of second priority to a non-zero value, where the maximal allowed power production is determined dependent on whether a first power production gap is greater or less than zero and dependent on a comparison of the first power production gap with a second available power production capability of the selection of the one or more power generating units of the second priority.
-
公开(公告)号:US12199443B2
公开(公告)日:2025-01-14
申请号:US18718374
申请日:2022-10-31
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Dan Wu , Mads Rajczyk Skjelmose , Kouroush Nayebi
Abstract: The invention relates to a power plant connected to an electrical grid and a method for controlling the power plant. The power plant comprises one or more power generators and at least one synchronous condenser. The power generators may be wind turbine generators, solar photovoltaic elements or other kinds of renewable power generators. During a deviation in frequency on the electrical grid, the synchronous condenser counteracts the frequency deviation, but it may also unintentional supply active power during the frequency event. The control method is controlling the active power supply from the power generators during the frequency events based only on the active power output from the power generators.
-
公开(公告)号:US11626739B2
公开(公告)日:2023-04-11
申请号:US17417097
申请日:2019-11-28
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Mads Rajczyk Skjelmose , Henrik Møller
Abstract: The invention relates to a hybrid power plant for producing power to the electrical grid, the hybrid power plant comprising a plurality of energy assets; a first renewable power generating unit, such as wind turbine generators, and an energy storage unit, preferably a battery energy storage system. The hybrid power plant has a power plant controller arranged to communicate with the plurality of energy assets, and, when an under-frequency event occurs, the energy storage unit provides frequency support during the under-frequency event by providing additional power as a function of a state of charge of the energy storage unit at the time when the under-frequency event occurs. Thus, during an under-frequency event, it is possible to obtain a more stable power output from the hybrid power plant.
-
-
-
-
-
-
-
-
-