-
公开(公告)号:WO2012040235A3
公开(公告)日:2012-03-29
申请号:PCT/US2011/052407
申请日:2011-09-20
Applicant: WEATHERFORD/LAMB, INC. , NOSKE, Joe , SMITH, Roddie R. , SMITH, Paul L. , BAILEY, Thomas F. , MCDOWELL, Christopher L.
Inventor: NOSKE, Joe , SMITH, Roddie R. , SMITH, Paul L. , BAILEY, Thomas F. , MCDOWELL, Christopher L.
Abstract: A method of operating an isolation valve in a wellbore includes: deploying a work string into the wellbore through a tubular string disposed in the wellbore. The work string comprises a deployment string, a shifting tool, and a bottomhole assembly (BHA). The tubular string comprises the isolation valve and an actuator. The method further includes rotating the actuator using the shifting tool, thereby opening or closing the isolation valve. The isolation valve isolates a formation from an upper portion of the wellbore in the closed position.
-
公开(公告)号:WO2012040220A2
公开(公告)日:2012-03-29
申请号:PCT/US2011/052383
申请日:2011-09-20
Applicant: WEATHERFORD/LAMB, INC. , NOSKE, Joe , SMITH, Roddie R. , SMITH, Paul L. , BAILEY, Thomas F. , MCDOWELL, Christopher L. , TILTON, Frederick T.
Inventor: NOSKE, Joe , SMITH, Roddie R. , SMITH, Paul L. , BAILEY, Thomas F. , MCDOWELL, Christopher L. , TILTON, Frederick T.
CPC classification number: E21B34/06 , E21B34/063 , E21B34/08 , E21B34/14 , E21B43/103 , E21B47/12 , E21B2021/006 , E21B2034/005
Abstract: A method of drilling a wellbore includes drilling the wellbore through a formation by injecting drilling fluid through a drill string and rotating a drill bit. The drill string includes a shifting tool, a receiver in communication with the shifting tool, and the drill bit. The method further includes retrieving the drill string from the wellbore through a casing string until the shifting tool reaches an actuator. The casing string includes an isolation valve in an open position and the actuator. The method further includes sending a wireless instruction signal to the receiver. The shifting tool engages the actuator in response to the receiver receiving the instruction signal. The method further includes operating the actuator using the engaged shifting tool, thereby closing the isolation valve and isolating the formation from an upper portion of the wellbore.
Abstract translation: 钻井井的方法包括通过将钻井液喷射穿过钻柱并旋转钻头而将井眼穿过地层钻井。 钻柱包括换档工具,与换档工具连通的接收器和钻头。 该方法还包括通过套管柱从钻井中取出钻柱,直到换档工具到达致动器。 套管柱包括处于打开位置的隔离阀和致动器。 该方法还包括向接收机发送无线指令信号。 响应于接收器接收到指令信号,换档工具接合致动器。 该方法还包括使用所接合的换档工具来操作致动器,从而关闭隔离阀并将地层与井筒的上部隔离。
-
公开(公告)号:WO2014151285A2
公开(公告)日:2014-09-25
申请号:PCT/US2014/025374
申请日:2014-03-13
Applicant: WEATHERFORD/LAMB, INC.
Inventor: SMITH, Roddie R. , SIDES, Winfield
IPC: E21B34/10
CPC classification number: E21B34/105 , E21B2034/005
Abstract: The present invention generally relates to a deepset wireline retrievable safety valve for controlling fluid flow through a production tubing string. In one aspect, a valve for use in a wellbore is provided. The valve includes a housing having a bore. The valve further includes an actuator sleeve movable within the housing between a retracted position and an extended position. The actuator sleeve in the retracted position allows a flapper member to obstruct the bore in the housing. Additionally, the valve includes a first piston member attached to a first side of the actuator sleeve and a second piston member attached to a second side of the actuator sleeve, wherein wellbore fluid pressure acts on the first piston member, which results in a first force, and acts on the second piston, which results in a second force, and the first force and the second force are applied to the actuator sleeve in an opposite direction.
Abstract translation: 本发明一般涉及一种用于控制通过生产油管柱的流体流动的深层钢丝绳可回收安全阀。 一方面,提供了一种用于井眼的阀。 阀包括具有孔的壳体。 所述阀还包括可在所述壳体内在缩回位置和延伸位置之间移动的致动器套筒。 处于缩回位置的致动器套筒允许挡板构件阻塞壳体中的孔。 另外,阀包括附接到致动器套筒的第一侧的第一活塞构件和附接到致动器套筒的第二侧的第二活塞构件,其中井筒流体压力作用在第一活塞构件上,这导致第一力 并且作用在第二活塞上,这导致第二力,并且第一力和第二力沿相反方向施加到致动器套筒。
-
公开(公告)号:WO2014127156A1
公开(公告)日:2014-08-21
申请号:PCT/US2014/016306
申请日:2014-02-13
Applicant: WEATHERFORD/LAMB, INC.
Inventor: SMITH, Roddie R. , SMITH, Paul L.
IPC: E21B34/10
CPC classification number: E21B34/10
Abstract: The present invention generally relates to a hydraulic communication device (10)that is used in a wellbore for fluid communication during a wellbore operation. In one aspect, a hydraulic communication device (10) is provided. The hydraulic communication device includes a body (30) having a central passageway (40) and a bore (55) formed in a wall of the body. The bore is in fluid communication with the central passageway, and the bore is configured to receive an end of a control line (25). The hydraulic communication device further includes a plug assembly (100) disposed in the bore formed in the wall of the body. The plug assembly is movable from a first position in which fluid communication through the bore is blocked and a second position in which fluid communication through the bore is unblocked.
Abstract translation: 本发明一般涉及在井筒操作期间用于井筒中的流体连通的液压通信装置(10)。 一方面,提供一种液压通信装置(10)。 液压连通装置包括具有中心通道(40)的主体(30)和形成在主体的壁中的孔(55)。 所述孔与所述中心通道流体连通,并且所述孔构造成接收控制线(25)的端部。 液压连通装置还包括设置在形成在主体壁上的孔中的塞子组件(100)。 插头组件可从第一位置移动,在第一位置,通过所述孔的流体连通被阻挡,以及第二位置,其中通过所述孔的流体连通被阻挡。
-
公开(公告)号:EP2619401A2
公开(公告)日:2013-07-31
申请号:EP11761250.7
申请日:2011-09-20
Applicant: Weatherford/Lamb, Inc.
Inventor: NOSKE, Joe , SMITH, Roddie R. , SMITH, Paul L. , BAILEY, Thomas F. , MCDOWELL, Christopher L. , TILTON, Frederick T.
CPC classification number: E21B34/06 , E21B34/063 , E21B34/08 , E21B34/14 , E21B43/103 , E21B47/12 , E21B2021/006 , E21B2034/005
Abstract: A method of drilling a wellbore includes drilling the wellbore through a formation by injecting drilling fluid through a drill string and rotating a drill bit. The drill string includes a shifting tool, a receiver in communication with the shifting tool, and the drill bit. The method further includes retrieving the drill string from the wellbore through a casing string until the shifting tool reaches an actuator. The casing string includes an isolation valve in an open position and the actuator. The method further includes sending a wireless instruction signal to the receiver. The shifting tool engages the actuator in response to the receiver receiving the instruction signal. The method further includes operating the actuator using the engaged shifting tool, thereby closing the isolation valve and isolating the formation from an upper portion of the wellbore.
Abstract translation: 钻井眼的方法包括通过将钻井液注入钻柱并旋转钻头钻穿井眼。 钻柱包括移位工具,与移位工具连通的接收器以及钻头。 该方法进一步包括通过套管柱从钻井取回钻柱,直到切换工具到达致动器。 套管柱包括处于打开位置的隔离阀和致动器。 该方法还包括向接收机发送无线指令信号。 响应于接收器接收到指令信号,切换工具接合致动器。 该方法进一步包括使用接合的换挡工具操作致动器,由此关闭隔离阀并且将地层与井筒的上部隔离。
-
公开(公告)号:EP2619402A2
公开(公告)日:2013-07-31
申请号:EP11761794.4
申请日:2011-09-20
Applicant: Weatherford/Lamb, Inc.
Inventor: NOSKE, Joe , SMITH, Roddie R. , SMITH, Paul L. , BAILEY, Thomas F. , MCDOWELL, Christopher L.
CPC classification number: E21B41/00 , E21B23/02 , E21B23/06 , E21B34/14 , E21B43/103 , E21B2021/006
Abstract: A method of operating an isolation valve in a wellbore includes: deploying a work string into the wellbore through a tubular string disposed in the wellbore. The work string comprises a deployment string, a shifting tool, and a bottomhole assembly (BHA). The tubular string comprises the isolation valve and an actuator. The method further includes rotating the actuator using the shifting tool, thereby opening or closing the isolation valve. The isolation valve isolates a formation from an upper portion of the wellbore in the closed position.
Abstract translation: 在井筒中操作隔离阀的方法包括:通过设置在井眼中的管状柱将工作柱部署到井眼中。 工作串包括展开串,换档工具和井底组件(BHA)。 管状串包括隔离阀和致动器。 该方法还包括使用换档工具旋转致动器,从而打开或关闭隔离阀。 隔离阀在闭合位置将地层与井筒的上部隔离开来。
-
公开(公告)号:EP2971472A2
公开(公告)日:2016-01-20
申请号:EP14719454.2
申请日:2014-03-13
Applicant: Weatherford/Lamb, Inc.
Inventor: SMITH, Roddie R. , SIDES, Winfield
IPC: E21B34/10
CPC classification number: E21B34/105 , E21B2034/005
Abstract: The present invention generally relates to a deepset wireline retrievable safety valve for controlling fluid flow through a production tubing string. In one aspect, a valve for use in a wellbore is provided. The valve includes a housing having a bore. The valve further includes an actuator sleeve movable within the housing between a retracted position and an extended position. The actuator sleeve in the retracted position allows a flapper member to obstruct the bore in the housing. Additionally, the valve includes a first piston member attached to a first side of the actuator sleeve and a second piston member attached to a second side of the actuator sleeve, wherein wellbore fluid pressure acts on the first piston member, which results in a first force, and acts on the second piston, which results in a second force, and the first force and the second force are applied to the actuator sleeve in an opposite direction.
-
-
-
-
-
-