FILE MONITORING
    2.
    发明申请
    FILE MONITORING 有权
    文件监控

    公开(公告)号:US20130219049A1

    公开(公告)日:2013-08-22

    申请号:US13401801

    申请日:2012-02-21

    CPC classification number: G06F11/3433 G06F11/323 G06F11/3495

    Abstract: A server receives a first set of file activity data from a first file monitor. The first set of file activity data indicates activity associated with a first set of files accessed at a first compute node in communication with a network. Further, the server receives a second set of file activity data from a second file monitor. The second set of file activity data indicates activity associated with a second set of files accessed at a second compute node in communication with the network. In addition, the server aggregates the first set of file activity data and the second set of file activity data into an aggregated set of network file activity data.

    Abstract translation: 服务器从第一文件监视器接收第一组文件活动数据。 第一组文件活动数据指示与在与网络通信的第一计算节点处访问的第一组文件相关联的活动。 此外,服务器从第二文件监视器接收第二组文件活动数据。 第二组文件活动数据指示与在与网络通信的第二计算节点处访问的第二组文件相关联的活动。 此外,服务器将第一组文件活动数据和第二组文件活动数据聚合成一组聚合的网络文件活动数据。

    DYNAMIC ALLOCATION OF COMPUTE RESOURCES
    3.
    发明申请
    DYNAMIC ALLOCATION OF COMPUTE RESOURCES 审中-公开
    计算资源的动态分配

    公开(公告)号:US20130219386A1

    公开(公告)日:2013-08-22

    申请号:US13401786

    申请日:2012-02-21

    CPC classification number: G06F9/5061 G06F9/45558 G06F2009/45562

    Abstract: A resource broker determines availability of a portion of a set of compute resources in real-time. The set of compute resources is assigned as a priority to a master process. Further, the resource broker assigns the portion of the set of compute resources to an auxiliary process if the portion of the set of compute resources is available. In addition, the resource broker determines that the master process is attempting to utilize the portion of the set of compute resources. The resource broker also assigns the portion of the set of compute resources to the master process from the auxiliary process without an interruption that exceeds a predetermined time threshold of processing being performed by the master process.

    Abstract translation: 资源代理实时地确定一组计算资源的一部分的可用性。 计算资源集合作为主进程的优先级分配。 此外,如果该组计算资源的部分可用,则资源代理将该组计算资源的一部分分配给辅助进程。 另外,资源代理确定主进程正试图利用该组计算资源的一部分。 资源代理还将辅助处理的计算资源集合的一部分分配给主进程,而不会中断超过由主进程执行的预定时间阈值。

    Dry etching method for compound semiconductors
    4.
    发明授权
    Dry etching method for compound semiconductors 失效
    化学半导体干蚀刻法

    公开(公告)号:US5624529A

    公开(公告)日:1997-04-29

    申请号:US437532

    申请日:1995-05-10

    Abstract: A dry etching method. According to the present invention, a gaseous plasma comprising, at least in part, boron trichloride, methane, and hydrogen may be used for dry etching of a compound semiconductor material containing layers including aluminum, or indium, or both. Material layers of a compound semiconductor alloy such as AlGaInP or the like may be anisotropically etched for forming electronic devices including field-effect transistors and heterojunction bipolar transistors and for forming photonic devices including vertical-cavity surface-emitting lasers, edge-emitting lasers, and reflectance modulators.

    Abstract translation: 干蚀刻法。 根据本发明,至少部分地包含三氯化硼,甲烷和氢气的气态等离子体可用于干法蚀刻包含铝或铟的二者的化合物半导体材料或两者。 可以各向异性地蚀刻诸如AlGaInP等的化合物半导体合金的材料层,以形成包括场效应晶体管和异质结双极晶体管的电子器件,并且用于形成包括垂直腔表面发射激光器,边缘发射激光器和 反射调制剂。

    BATCH SCHEDULER MANAGEMENT OF TASKS
    5.
    发明申请
    BATCH SCHEDULER MANAGEMENT OF TASKS 有权
    任务管理调度员

    公开(公告)号:US20130219395A1

    公开(公告)日:2013-08-22

    申请号:US13401773

    申请日:2012-02-21

    CPC classification number: G06F9/5072 G06F2209/504 Y02D10/22

    Abstract: A request from a client to perform a task is received. The client has a predetermined limit of compute resources. The task is dispatched from a batch scheduler to a compute node as a non-speculative task if a quantity of compute resources is available at the compute node to process the task, and the quantity of compute resources in addition to a total quantity of compute resources being utilized by the client is less than or equal to the predetermined limit, such that the non-speculative task is processed without being preempted by an additional task requested by an additional client. The task is dispatched, from the batch scheduler to the compute node, as a speculative task if the quantity of compute resources is available to process the task, and the quantity of compute resources in addition to the total quantity of compute resources is greater than the predetermined limit.

    Abstract translation: 接收到客户端执行任务的请求。 客户端具有预定的计算资源限制。 如果在计算节点处可用计算资源的数量来处理该任务,以及除计算资源总数之外的计算资源数量,则将任务作为非推测性任务从批处理调度程序分派到计算节点 由客户端使用的小于或等于预定限制,使得非推测性任务被处理而不被附加客户端请求的附加任务抢占。 如果计算资源的数量可用于处理任务,那么从批处理调度程序到计算节点的任务作为推测性任务进行分派,除了计算资源的总数之外,计算资源的数量大于 预定限度。

    Batch scheduler management of speculative and non-speculative tasks based on conditions of tasks and compute resources
    8.
    发明授权
    Batch scheduler management of speculative and non-speculative tasks based on conditions of tasks and compute resources 有权
    根据任务和计算资源的条件对投机和非投机性任务进行批量调度管理

    公开(公告)号:US09104491B2

    公开(公告)日:2015-08-11

    申请号:US13401773

    申请日:2012-02-21

    CPC classification number: G06F9/5072 G06F2209/504 Y02D10/22

    Abstract: A request from a client to perform a task is received. The client has a predetermined limit of compute resources. The task is dispatched from a batch scheduler to a compute node as a non-speculative task if a quantity of compute resources is available at the compute node to process the task, and the quantity of compute resources in addition to a total quantity of compute resources being utilized by the client is less than or equal to the predetermined limit, such that the non-speculative task is processed without being preempted by an additional task requested by an additional client. The task is dispatched, from the batch scheduler to the compute node, as a speculative task if the quantity of compute resources is available to process the task, and the quantity of compute resources in addition to the total quantity of compute resources is greater than the predetermined limit.

    Abstract translation: 接收到客户端执行任务的请求。 客户端具有预定的计算资源限制。 如果在计算节点处可用计算资源的数量来处理该任务,以及除计算资源总数之外的计算资源数量,则将任务作为非推测性任务从批处理调度程序分派到计算节点 由客户端使用的小于或等于预定限制,使得非推测性任务被处理而不被附加客户端请求的附加任务抢占。 如果计算资源的数量可用于处理任务,那么从批处理调度程序到计算节点的任务作为推测性任务进行分派,除了计算资源的总数之外,计算资源的数量大于 预定限度。

    Method for remote plasma deposition of fluoropolymer films
    10.
    发明授权
    Method for remote plasma deposition of fluoropolymer films 失效
    氟聚合物膜的远程等离子体沉积方法

    公开(公告)号:US06444275B1

    公开(公告)日:2002-09-03

    申请号:US09699413

    申请日:2000-10-31

    CPC classification number: B41J2/1606

    Abstract: A thermal ink jet printhead contains, on a front face, a remote plasma deposited fluoropolymer film. The fluoropolymer film has a high fluorine to carbon ratio. The film also possesses excellent mechanical durability. The film may be prepared by forming a remote plasma from precursor gases containing flurocarbons and depositing from the remote plasma onto a front face of a thermal ink jet printhead

    Abstract translation: 热喷墨打印头在正面上包含远程等离子体沉积的氟聚合物膜。 氟聚合物膜具有高的氟碳比。 该膜还具有优异的机械耐久性。 可以通过从含有氟碳的前体气体形成远程等离子体并从远程等离子体沉积到热喷墨打印头的前面来制备膜

Patent Agency Ranking