CREATION OF FUTURE TIME INTERVAL POWER GENERATION DATA USING HISTORICAL DATA
    1.
    发明申请
    CREATION OF FUTURE TIME INTERVAL POWER GENERATION DATA USING HISTORICAL DATA 审中-公开
    使用历史数据创建未来时间间隔发电数据

    公开(公告)号:US20060106739A1

    公开(公告)日:2006-05-18

    申请号:US10904493

    申请日:2004-11-12

    CPC classification number: G06Q10/06 G06Q50/06

    Abstract: Methods, apparatus, and articles of manufacture such as software media for creating projected power production data are described herein. The method may comprise storing historical heat rate data for at least one power generation unit in a historical heat rate database. The method may also comprise retrieving the historical heat rate data from the database for a selected time interval and creating a projected cost curve and/or a projected price curve for a future time interval based on the historical heat rate data.

    Abstract translation: 本文描述了用于创建投影电力生产数据的方法,装置和制品,例如用于创建投影电力生产数据的软件介质。 该方法可以包括将用于至少一个发电单元的历史热量数据存储在历史热量数据库中。 该方法还可以包括在所选择的时间间隔内从数据库检索历史热量数据,并且基于历史热量数据创建未来时间间隔的预计成本曲线和/或预计价格曲线。

    NEURAL MODELING FOR NOx GENERATION CURVES
    2.
    发明申请
    NEURAL MODELING FOR NOx GENERATION CURVES 审中-公开
    氮氧化物生成曲线的神经模型

    公开(公告)号:US20060106501A1

    公开(公告)日:2006-05-18

    申请号:US10904491

    申请日:2004-11-12

    CPC classification number: G05D21/02

    Abstract: A method of generating NOx curves over a range of load points includes obtaining current measurements from a respective sensor and validating the current measurements. A plurality of input curves are generated using predefined inputs for each load point. The plurality of input curves include a first set point curve and a second set point curve, where the second setpoint curve includes the first setpoint curve offset with the current measurements. A plurality of NOx curves are generated including a design curve, an adjusted design curve, and a NOx generation curve created by a neural model. The second setpoint curve is passed through the neural model to derive the NOx generation curve. After validating the NOx generation curve and adjusted design curve, one of the plurality of NOx curves is outputted.

    Abstract translation: 在一系列负载点上产生NOx曲线的方法包括从相应的传感器获得电流测量值并验证电流测量值。 使用每个负载点的预定义输入生成多个输入曲线。 多个输入曲线包括第一设定点曲线和第二设定点曲线,其中第二设定点曲线包括具有当前测量值的第一设定点曲线偏移。 产生多个NOx曲线,其包括设计曲线,经调整的设计曲线和由神经模型产生的NOx生成曲线。 第二个设定曲线通过神经模型得到NOx生成曲线。 在验证NOx生成曲线和调整后的设计曲线之后,输出多个NOx曲线中的一个。

    CREATION AND CORRECTION OF FUTURE TIME INTERVAL POWER GENERATION CURVES FOR POWER GENERATION COSTING AND PRICING
    3.
    发明申请
    CREATION AND CORRECTION OF FUTURE TIME INTERVAL POWER GENERATION CURVES FOR POWER GENERATION COSTING AND PRICING 审中-公开
    未来时间间隔的发电和校正用于发电成本和定价的发电曲线

    公开(公告)号:US20060106740A1

    公开(公告)日:2006-05-18

    申请号:US10904494

    申请日:2004-11-12

    CPC classification number: G06Q10/06 G06Q50/06

    Abstract: Methods, apparatus, and articles of manufacture such as software media for creating projected power production data are disclosed. The method may comprise storing historical heat rate data and historical process information for at least one power generation unit in a historical heat rate database. The method may also comprise retrieving the historical heat rate data from the database for a selected time interval and correcting the historical rate data using correction factors which may be based on differences between the historical process information and projected process information; and creating a projected cost or a projected price for a future time interval based on the retrieved historical heat rate data.

    Abstract translation: 公开了用于创建投影电力生产数据的方法,设备和制品,例如软件介质。 该方法可以包括将用于至少一个发电单元的历史热速率数据和历史过程信息存储在历史热量数据库中。 该方法还可以包括在所选择的时间间隔内从数据库检索历史热量数据,并使用可以基于历史过程信息和预计过程信息之间的差异的校正因子校正历史速率数据; 并根据检索的历史热量数据创建未来时间间隔的预计成本或预计价格。

    CALCULATION OF REAL TIME INCREMENTAL EMISSIONS COST
    5.
    发明申请
    CALCULATION OF REAL TIME INCREMENTAL EMISSIONS COST 审中-公开
    计算实时增加排放成本

    公开(公告)号:US20060106737A1

    公开(公告)日:2006-05-18

    申请号:US10904489

    申请日:2004-11-12

    CPC classification number: G01M15/102 G06Q30/0283

    Abstract: A method of generating emission curves over a range of load points includes obtaining current measurements from a respective sensor. The current measurements are validated and a plurality of emission curves using predefined inputs for each load point are generated. The plurality of emission curves includes an emission design curve and a corresponding real time incremental emission curve. Each corresponding real time incremental emission curve and emission design curve are validated to generate a validated emission curve. An incremental emission cost curve using each validated emission curve for each type of emission is generated. Each incremental emission cost curve is summed if there is more than one incremental emission cost curve.

    Abstract translation: 在一系列负载点上产生发射曲线的方法包括从相应的传感器获得电流测量值。 当前测量被验证,并且产生使用用于每个负载点的预定义输入的多个发射曲线。 多个发射曲线包括发射设计曲线和对应的实时增量发射曲线。 每个对应的实时增量排放曲线和排放设计曲线都被验证,以产生有效的排放曲线。 生成每种类型的发射使用每个经验证的发射曲线的增量排放成本曲线。 如果有多于一个增量排放成本曲线,则每个增量排放成本曲线相加。

Patent Agency Ranking