Optimal wind farm operation
    1.
    发明授权

    公开(公告)号:US10161386B2

    公开(公告)日:2018-12-25

    申请号:US15375904

    申请日:2016-12-12

    Applicant: ABB Schweiz AG

    Abstract: The present application is concerned with a flexible way of operating a wind farm with a plurality of degrading wind turbine components. According to the invention, maintenance scheduling and power production in the wind farm are handled concurrently in a single optimization step. Instead of a serial approach first scheduling maintenance activities and subsequently adapting the power production and/or wind turbine operation the two aspects are optimized together. The wind farm operation takes maintenance aspects into account by adapting life index or health status based on modeled mechanical and electrical stress. Accordingly, the wind farm owner may decide when and how much energy to produce accepting which level of stress to the turbine equipment. The proposed optimization of wind farm operation includes all aspects of transmission network operator settings, the topology of wind farms and the underlying collector grid, the short and long term wind conditions forecasts, the conditions of the turbines, the estimated remaining operational time under different usage patterns and times, as well as aspects of the electricity market.

    OPTIMAL WIND FARM OPERATION
    2.
    发明申请

    公开(公告)号:US20170089325A1

    公开(公告)日:2017-03-30

    申请号:US15375904

    申请日:2016-12-12

    Applicant: ABB Schweiz AG

    Abstract: The present application is concerned with a flexible way of operating a wind farm with a plurality of degrading wind turbine components. According to the invention, maintenance scheduling and power production in the wind farm are handled concurrently in a single optimization step. Instead of a serial approach first scheduling maintenance activities and subsequently adapting the power production and/or wind turbine operation the two aspects are optimized together. The wind farm operation takes maintenance aspects into account by adapting life index or health status based on modeled mechanical and electrical stress. Accordingly, the wind farm owner may decide when and how much energy to produce accepting which level of stress to the turbine equipment. The proposed optimization of wind farm operation includes all aspects of transmission network operator settings, the topology of wind farms and the underlying collector grid, the short and long term wind conditions forecasts, the conditions of the turbines, the estimated remaining operational time under different usage patterns and times, as well as aspects of the electricity market.

Patent Agency Ranking