公开(公告)号:US12129606B2
公开(公告)日:2024-10-29
申请号:US16808404
申请日:2020-03-04
Inventor: Haiyan Li , Zhichao Yang , Yan Huang , Liyuan Wu , Xiaoran Zhang , Ziyang Zhang , Jinxi Li
CPC classification number: E01C11/225 , B32B3/30 , B32B5/16 , B32B13/047 , E01C7/32 , B32B2264/10 , B32B2307/726
Abstract: A method for permeable pavement of dirt interception comprises laying a permeable structure layer with a toothed groove between the base layer and the transition surface of the cushion layer or directly setting the upper surface of the cushion layer as a toothed structure; in the base layer, laying at least one layer of dirt interception trough; providing a water-permeable coating or fine sand at the bottom of the sewage interception trough; the present invention traps the dirt between the base layer and the cushion layer that are most likely to cause void blocking in the base layer, close to the shallow part of the surface layer is used to remove dirt by high-pressure flushing operations.