公开(公告)号:US20220285983A1
公开(公告)日:2022-09-08
申请号:US17706200
申请日:2022-03-28
Applicant: Operation Technology Inc.
Inventor: Mohammad Reza Dadash Zadeh , Farrokh Shokooh , Jun Qiu
Abstract: A system for estimating faulted area in an electric distribution system. The system includes a database storing input data, a fault detection module to estimate, based on the input data, if a new faulted area estimation process is required, a condition estimation module to estimate condition of metered protective devices, un-metered protective devices, and metered devices (PMDs), an upstream to downstream module to assess condition of each metered protective device, un-metered protective device, and metered device (PMD), starting from a feeder circuit breaker towards feeder downstream, to estimate a tripped protective device and a last metered device upstream of a fault, and a downstream to upstream module configured to assess outaged electric loads or elements towards network upstream to find the common interrupting protective device.
-
公开(公告)号:US20240348088A1
公开(公告)日:2024-10-17
申请号:US18611466
申请日:2024-03-20
Applicant: Operation Technology Inc.
Inventor: Mohammad Reza Dadash Zadeh , Farrokh Shokooh , Jun Qiu
CPC classification number: H02J13/00034 , G01R31/088 , G01R31/2836 , H02H3/042 , H02J13/00002
Abstract: A system for estimating faulted area in an electric distribution system. The system includes a database storing input data, a fault detection module to estimate, based on the input data, if a new faulted area estimation process is required, a condition estimation module to estimate condition of metered protective devices, un-metered protective devices, and metered devices (PMDs), an upstream to downstream module to assess condition of each metered protective device, un-metered protective device, and metered device (PMD), starting from a feeder circuit breaker towards feeder downstream, to estimate a tripped protective device and a last metered device upstream of a fault, and a downstream to upstream module configured to assess outaged electric loads or elements towards network upstream to find the common interrupting protective device.
-