Method and device for detecting a maximum system power output of a photovoltaic system

    公开(公告)号:US11228277B2

    公开(公告)日:2022-01-18

    申请号:US16792375

    申请日:2020-02-17

    Abstract: A method for determining a system power, which is maximally possible at a point in time, of a photovoltaic system, comprising a plurality of photovoltaic generators, wherein the photovoltaic system is not operated at the maximally possible system power at the point in time, and wherein at least some of the photovoltaic generators of the plurality of photovoltaic generators are operated at different operating points at the point in time, is disclosed. The method and associated apparatus includes defining a mapping between the different operating points of the individual photovoltaic generators and virtual operating points of a standard generator, determining virtual operating points of a standard generator corresponding to the different operating points of the individual photovoltaic generators based on the mapping, determining a characteristic curve of the standard generator from the virtual operating points of the standard generator, determining a maximum of the characteristic curve, and determining the maximally possible system power at the point in time from the maximum of the characteristic curve of the standard generator.

    Method for controlling a load
    4.
    发明授权

    公开(公告)号:US10103543B2

    公开(公告)日:2018-10-16

    申请号:US15190485

    申请日:2016-06-23

    Abstract: A method for controlling a load by providing a total energy consumption and a time window for the total energy consumption of the load from one or more energy sources is described. The method includes determining of energy blocks, wherein the energy blocks are based on a power interval during a time interval, the time intervals are within the time window and the energy blocks are allocated energy-source-dependent costs, sorting of the energy blocks in ascending order according to the level of the costs per energy block and subsequent summation of quantities of energy that the energy blocks contain in ascending order of sorting until the total energy consumption of the load is reached. From this, on and off times of the load are determined by means of the time intervals that belong to the summed energy blocks, wherein the power intervals belonging to the respective energy blocks determine a power consumption of the load at the respective instant, and the load is actuated in accordance with the on and off times. An apparatus for carrying out the method is likewise disclosed.

    Device for connecting a sub-network to an alternating voltage network and method for controlling an electrical power

    公开(公告)号:US11563383B2

    公开(公告)日:2023-01-24

    申请号:US17005783

    申请日:2020-08-28

    Abstract: A method for controlling an electrical power which flows into or out of an electrical subnetwork via a connection point is disclosed. The subnetwork has at least one electrical load, and the electrical load is connected to a control device via a communication connection, the electrical power flowing via the connection point is measured and a maximum power consumption of the electrical load is set by means of the control device on the basis of the electrical power flowing via the connection point. A device for connecting a multiphase subnetwork, which has an energy production installation and an energy store, to a superordinate multiphase alternating voltage network is configured to transmit electrical power between the alternating voltage network and the subnetwork and comprises an AC/AC converter having a network connection, two inverter bridge circuits with an interposed intermediate circuit and a subnetwork connection. The device also comprises a control device which is configured to set the electrical powers flowing via the individual phases of the subnetwork connection on the basis of power values of the energy production installation and/or of the energy store by suitably controlling the inverter bridge circuits of the AC/AC converter.

    METHOD AND APPARATUS FOR IDENTIFYING AN ASSOCIATION OF PHASE LINES TO CONNECTIONS OF AN ELECTRICAL DEVICE CAPABLE OF UNBALANCED-LOAD OPERATION

    公开(公告)号:US20210215774A1

    公开(公告)日:2021-07-15

    申请号:US17215076

    申请日:2021-03-29

    Abstract: A method for identifying an assignment of phase lines of an electrical distribution grid to connections of an electrical device capable of unbalanced-load operation, wherein the device is connected to a plurality of phase lines of the electrical distribution grid, includes setting target parameters assigned to an unbalanced load profile at each of the connections of the electrical device, detecting a temporal profile of a measurement parameter on each of the plurality of phase lines using a detection circuit, comparing the detected temporal profiles of the measurement parameters with the target parameters of the unbalanced load profile for each of the plurality of phase lines, respectively, and identifying the assignment of the phase lines to the connections on the basis of the comparison.

    METHOD AND DEVICE FOR DETECTING A MAXIMUM SYSTEM POWER OUTPUT OF A PHOTOVOLTAIC SYSTEM

    公开(公告)号:US20200186083A1

    公开(公告)日:2020-06-11

    申请号:US16792375

    申请日:2020-02-17

    Abstract: A method for determining a system power, which is maximally possible at a point in time, of a photovoltaic system, comprising a plurality of photovoltaic generators, wherein the photovoltaic system is not operated at the maximally possible system power at the point in time, and wherein at least some of the photovoltaic generators of the plurality of photovoltaic generators are operated at different operating points at the point in time, is disclosed. The method and associated apparatus includes defining a mapping between the different operating points of the individual photovoltaic generators and virtual operating points of a standard generator, determining virtual operating points of a standard generator corresponding to the different operating points of the individual photovoltaic generators based on the mapping, determining a characteristic curve of the standard generator from the virtual operating points of the standard generator, determining a maximum of the characteristic curve, and determining the maximally possible system power at the point in time from the maximum of the characteristic curve of the standard generator.

    METHOD FOR CONTROLLING A LOAD
    8.
    发明申请
    METHOD FOR CONTROLLING A LOAD 审中-公开
    控制负荷的方法

    公开(公告)号:US20160380431A1

    公开(公告)日:2016-12-29

    申请号:US15190485

    申请日:2016-06-23

    Abstract: A method for controlling a load by providing a total energy consumption and a time window for the total energy consumption of the load from one or more energy sources is described. The method includes determining of energy blocks, wherein the energy blocks are based on a power interval during a time interval, the time intervals are within the time window and the energy blocks are allocated energy-source-dependent costs, sorting of the energy blocks in ascending order according to the level of the costs per energy block and subsequent summation of quantities of energy that the energy blocks contain in ascending order of sorting until the total energy consumption of the load is reached. From this, on and off times of the load are determined by means of the time intervals that belong to the summed energy blocks, wherein the power intervals belonging to the respective energy blocks determine a power consumption of the load at the respective instant, and the load is actuated in accordance with the on and off times. An apparatus for carrying out the method is likewise disclosed.

    Abstract translation: 描述了通过提供总能量消耗和用于来自一个或多个能量源的负载的总能量消耗的时间窗来控制负载的方法。 该方法包括确定能量块,其中能量块基于时间间隔期间的功率间隔,时间间隔在时间窗口内,并且能量块被分配与能量源相关的成本,能量块的分类 根据每个能量块的成本水平和能量块以排序的升序包含的能量量的总和的升序,直到达到负载的总能量消耗。 由此,通过属于相加的能量块的时间间隔来确定负载的开和关时间,其中属于相应能量块的功率间隔确定在相应瞬间的负载的功率消耗,并且 根据开关时间启动负载。 同样公开了一种用于执行该方法的装置。

Patent Agency Ranking