TIME-BASED CONVERTER APPARATUS AND CORRESPONDING METHOD

    公开(公告)号:US20250088090A1

    公开(公告)日:2025-03-13

    申请号:US18829765

    申请日:2024-09-10

    Abstract: A time-based DC-DC converter is controlled in response to a first oscillator signal based on a first control signal, a second oscillator signal based on a second control signal and a controlled current based on a feedback control signal. The first control signal and the second control signal are a function of the controlled current. The feedback control signal is generated as a function of the first and second oscillator signals by: generating at least two binary signals including a first binary signal based on a difference between the first oscillator signal and the reference signal and a second binary signal based on a difference between the second oscillator signal and the reference signal; and generating via a charge pump the feedback control signal based on the first binary signal and the second binary signal.

    CHARGE PUMP INTEGRATION IN WIRELESS CHARGER POWER MANAGEMENT INTEGRATED CIRCUIT

    公开(公告)号:US20240396442A1

    公开(公告)日:2024-11-28

    申请号:US18201931

    申请日:2023-05-25

    Inventor: Alberto CATTANI

    Abstract: A wireless charging and data transmission system that includes first and second half-bridges coupled in parallel between supply and ground nodes. Each half-bridge includes high-side and low-side transistors. A first high-side driving circuit drives the control terminal of the high-side transistor of the first half-bridge with a first bootstrap voltage at a first node, and a second high-side driving circuit drives the control terminal of the high-side transistor of the second half-bridge with a second bootstrap voltage at a second node. A charge pump circuit generates and maintains a master bootstrap voltage at a master node, which is equal to the voltage at the supply node plus a given voltage. A switch circuit couples the master node to the first node during the low-side conduction period of the first half-bridge and couples the master node to the second node during the low-side conduction period of the second half-bridge.

Patent Agency Ranking