Improvements relating to the Construction of Ferro-concrete Piles.

    公开(公告)号:GB113375A

    公开(公告)日:1918-02-21

    申请号:GB623117

    申请日:1917-05-02

    Abstract: 113,375. Stewart, W. J., and Woolcock, J. May 2, 1917. Piles.-In forming concrete piles, reinforced or otherwise, by driving a tube, filling the tube with plastic concrete, and then withdrawing the tube, means inserted in the tube before filling are withdrawn after filling so as to break up any arch in the concrete and also to relieve friction between the concrete and tube during removal of the latter. In the form shown in Fig. 1, the disturbing means comprise pivoted triangular links e, e carried by a tube &c. C. The form shown in Fig. 2, for use where a central member forms an obstruction in the pile tube, comprises tubes h, h assisted by a cross-piece i and carrying pivoted diamond links j. Where the concrete is inserted in a semi-plastic state, water may be added through the tubes c, h, h , which may be perforated, during their removal.

    Improvements in and relating to Ties for Reinforcements for Concrete Work.

    公开(公告)号:GB191405192A

    公开(公告)日:1914-05-07

    申请号:GB191405192D

    申请日:1914-02-28

    Abstract: 5192. Stewart, W. J., and Woolcock, J. Feb. 28. Reinforced-concrete columns, beams, and walls; reinforced concrete. - Bonds or shear members consist of steel ribbon a, Fig. 3, with their ends slitted longitudinally and the separate parts d bent around the main bars band secured by being passed through slotted collars c, shown in plan in Fig. 4, and then bent over. Fig. 5 shows a beam reinforcement in which the members a occur alternately on opposite sides of the bent-up bar f. Fig. 6 shows a wall reinforcement in which the longitudinal bars h are supported by the bonds a. For columns, a spiral winding i, Fig. 7, is clipped at its ends to the main bars; diagonal or cross ties a' may be added.

Patent Agency Ranking