Abstract:
PURPOSE: A metering system is provided to save a communication charge by transmitting the metered data in a circuit data transmission mode in case of transmission failure of packet data. CONSTITUTION: A power meter(11) meters the amount of electric power generated from a generator of a power plant, stores the metered data in a memory, receives a metered data transmission command from a wireless modem(12), and transmits the metered data stored in the memory. The wireless modem transmits the metered data in a packet data transmission mode or a circuit data transmission mode by using a mobile communication network(13). A router(14) receives the packet data, extracts the location of the packet, and transmits the location of the packet to a metering server. A server wireless modem(15) transmits and receives the circuit data to and from the wireless modem. A metering server(16) manages and analyzes the metered data and transmits the setup information of the wireless modem and a metered data non-reception signal. An information DB server(18) stores the setup information.
Abstract:
PURPOSE: An AGC real time performance evaluation system and an evaluation method thereof are provided to evaluate the AGC performance of a generator by accurately calculating and analyzing the ramp rate of the generator. CONSTITUTION: A communication module communicates with an SCADA(Supervisory Control And Data Acquisition) server(110) of an energy management system(10). A central controller(230) includes a selection module and an operation module. The selection module selects an object generator or evaluation performance test method. The operation module calculates the ramp rate of a generator to be tested using current output and time data of the generator. A database unit(250) stores the AGC data about the generator. A display unit(270) displays the AGC data about the generator.
Abstract:
본 발명은 강제할입 제어 시스템 및 그 방법을 개시한다. 취급대의 긴급 전화 요청시, 기구비된 주장치/보조장치를 이용하여 소정의 ARS 음성 데이터 또는 통화요청 음성신호를 생성시켜 지역 급전부에 전달하거나, 혹은 지역 급전부가 취급대 외에 다른 외부 단말기와 통화 중일시 지역 급전부와 외부 단말기 간의 통화 중 상태를 강제 할입시키는 강제할입 제어 시스템 및 그 방법을 구현함으로써, 긴급 상황 발생시, 취급대가 지역 급전부의 통화 중 상태를 강제 할입할 수 있도록 제어하여 취급대와 지역 급전부 간의 긴밀한 통화인 1:1 긴급 전화, 혹은 다중 긴급 전화를 빠르고 정확하게 연결함에 따른 긴급 상황 발생에 대한 효과적인 대처율을 향상시키고, 지역 급전부 부재시, 취급대가 ARS 음성 데이터 또는 통화요청 음성신호를 지역 급전부에 송출케 함에 따른 업무적인 통신 네트워크에 대한 효율성을 극대화하는 기대를 높인다. 급전전화 호 제어부, 강제 할입, ARS 음성 데이터, 통화요청 음성신호
Abstract:
본 발명은 자동회선 절체 제어시스템 및 그 방법을 개시한다. 주장치, 보조장치를 구비하는 급전전화 호 제어부를 이용하여 양단간의 급전전화를 실시간으로 연결하는 급전전화 시스템상에서 주장치, 보조장치 중에 어느 하나가 오작동 또는 장비 고장을 일으키는 경우 주장치, 보조장치 중에 정상 동작하는 어느 하나를 자동 선택하고, 다수의 지역 급전부마다 연결된 모든 급전전화 회선들을 기선택된 정상 동작하는 어느 하나로 자동 절체시키는 자동회선 절체 제어시스템 및 그 방법을 구현함으로써, 전체 통신망의 단절없이 모든 급전전화 회선의 수용함을 통해 긴급 전화 또는 방송업무 처리환경을 극대화시키고, 이에 따른 업무 처리의 신속성과 효율성 향상의 기대를 높인다. 자동회선 절체장치, 급전전화 호 제어부, 주장치/보조장치
Abstract:
The present invention relates to a method to generate an automatic generation control signal to periodically eliminate accumulated energy in an energy storage device of generation resources for limited energy resources participating in frequency control and a system to operate a system using the same and. More specifically, the said invention relates to a method to generate an automatic generation control signal to eliminate accumulated energy in an energy storage device of limited energy generation resources such as electric vehicle batteries, participating in automatic generation control of a power system using existing generation resources capable of self-generating every predetermined period and a system using the same. According to an embodiment of the present invention, flexibility in operating the resources generated can be increased by eliminating the accumulated energy in an energy storage device of limited energy resources, such as electric vehicle batteries, participating in the automatic generation control of a power system using existing generation resources capable of self-generating every predetermined period to allow the energy storage device to stably participate in the automatic generation control of the power system without dissipation due to a full charge or full discharge.
Abstract:
PURPOSE: A modem with a remote metering function is provided to transfer metering data through a circuit data transferring method. CONSTITUTION: A power unit(124) comprises a power supply unit, a reserve power supply unit, and a power state display unit. The reserve power supply unit supplies reserve power, when power is not supplied by the power unit. The power state display unit checks the quality of the power. A display driving unit(125) drives a display unit which displays the operation state and communication state of the metering modem. A wireless communication unit(127) transmits and receives the metering server, a packet data, and the circuit data through a wireless communication network.
Abstract:
PURPOSE: A training simulation system for quickly and accurately evaluating AGC in a training simulation process is provided to evaluate the capability of dispatcher by performing a simulation training under a same condition of an actual power system state. CONSTITUTION: A DTS(Dispatcher Training Simulation) operator(510) acquires data required for simulation. The DTS operator relays the interval of a simulation unit(530) and the dispatcher and controls the simulation situation. The simulation unit practices the dispatcher training simulation. A simulation manager(550) manages the simulation by control signal. A DTS database(570) stores data created in the simulation process.
Abstract:
본 발명은 에너지관리시스템(Energy Management System, EMS)의 하드웨어 규격 산정방법에 관한 것이다. 이를 위하여 본 발명은 EMS의 하드웨어 규격 산정 방법에 있어서, 시스템의 규모와 응용 프로그램에 따라 호스트노드/RTU데이터취득노드/RCC데이터취득노드/히스토리데이터노드 등에 대응하는 각각의 변수값을 입력받고 그 결과값을 계산하여 출력하는 에너지 관리 시스템을 구성하는 하드웨어 규격 산정 방법을 제공하여, 전력계통 운영의 특징이 반영되도록 접근 가능하고, 안정적인 계통상태 뿐만 아니라 고장(또는 사고)발생시에도 요구 성능을 충분히 발휘할 수 있도록 한다. 에너지 관리 시스템(EMS), 하드 웨어, 규격 산정