불확실성 기반의 비용 효율적인 보강공법 선정을 위한 의사결정 방법
    22.
    发明公开
    불확실성 기반의 비용 효율적인 보강공법 선정을 위한 의사결정 방법 失效
    基于不确定性选择成本有效的最优改造方法的决策方法

    公开(公告)号:KR1020100076374A

    公开(公告)日:2010-07-06

    申请号:KR1020080134392

    申请日:2008-12-26

    CPC classification number: G06Q10/06375 G06Q10/04 G06Q50/08

    Abstract: PURPOSE: A decision-making method for selecting cost-effective optimal retrofit method based on uncertainty is provided to support optimal decision making in consideration of quantitative cost efficiency when making a decision related to selection of the best retrofit method. CONSTITUTION: Relative economic efficiency is evaluated in consideration of uncertainty about an alternative satisfying absolute economic efficiency(S102). Relative performance considering uncertainty about the alternative is evaluated(S104). Cost efficiency considering uncertainty using the evaluated relative profitability and relative performance is evaluated(S105). A decision-making factor for qualitative evaluation is drawn(S107). A quantitative decision-making factor and a quantitative decision-making factor are determined(S108).

    Abstract translation: 目的:提出一种基于不确定性选择具有成本效益的最优改造方法的决策方法,以便在作出与选择最佳改造方法有关的决策时考虑到定量成本效益的最优决策。 构成:考虑到满足绝对经济效益的替代方案的不确定性,评估了相对经济效率(S102)。 评估考虑到替代方案的不确定性的相对性能(S104)。 评估考虑到使用评估的相对收益率和相对绩效的不确定性的成本效率(S105)。 绘制了定性评估的决策因素(S107)。 确定定量决策因素和定量决策因素(S108)。

    하프 프리캐스트 코핑부 시공방법
    24.
    发明公开
    하프 프리캐스트 코핑부 시공방법 有权
    半预制复合施工方法

    公开(公告)号:KR1020100009767A

    公开(公告)日:2010-01-29

    申请号:KR1020080070549

    申请日:2008-07-21

    Abstract: PURPOSE: A construction method of a half precast coping part is provided to secure the construction performance, the profitability, and safety of a column structure. CONSTITUTION: A construction method of a half precast coping part is as follows: A coping part(300) manufactured in a factory is installed on the top of a column structure. A reinforcement assembly of the coping part is connected with inner reinforcing bars of a body(310) in an inner hollow(S2). Concrete is placed in the inner hollow, and finished.

    Abstract translation: 目的:提供半预制应对部件的施工方法,以确保柱结构的施工性能,利润率和安全性。 构成:半预制应对部件的构造方法如下:工厂制造的应对部件(300)安装在柱结构的顶部。 所述应力部分的加强组件与内部空心(S2)中的主体(310)的内部加强筋连接。 混凝土被放置在内部空心中,并完成。

    횡방향이 이동이 가능한 프리캐스트 슬래브단차조절장치 및 이를 이용한 교량시공방법
    28.
    发明授权
    횡방향이 이동이 가능한 프리캐스트 슬래브단차조절장치 및 이를 이용한 교량시공방법 有权
    具有纵向移动和桥梁结构方法的SLAB差距调整装置

    公开(公告)号:KR101582611B1

    公开(公告)日:2016-01-19

    申请号:KR1020130154859

    申请日:2013-12-12

    Abstract: 횡방향으로연결되는프리캐스트슬래브세그먼트의솟음량에의한단차를간단하게조정하면서프리캐스트슬래브세그먼트를횡방향으로이동시킬수 있는횡방향이이동이가능한프리캐스트슬래브단차조절장치및 이를이용한교량시공방법및 이를이용한교량시공방법에대한것으로서프리캐스트슬래브단차조절장치는횡방향메인빔및 횡방향이동대차를포함하여횡방향이동대차에인장연결봉에의하여매달려설치된프리캐스트슬래브세그먼트가단차가보정된후, 횡방향메인빔의하부플랜지를따라횡방향이동하여서로접하도록설치된다.

    프리캐스트 연석모듈 제작방법
    30.
    发明公开
    프리캐스트 연석모듈 제작방법 有权
    预制曲棍球模块及其生产方法

    公开(公告)号:KR1020150057580A

    公开(公告)日:2015-05-28

    申请号:KR1020130141103

    申请日:2013-11-20

    CPC classification number: E01D19/10 E01C11/221 E01C19/502 E01D21/00

    Abstract: 양측판; 상기양 측판상단사이에형성된상판; 및상기상판을관통하도록형성된충전홀;을포함하는“∩”형태로프리캐스트부재로서, 프리캐스트슬래브의줄눈홈에상기양 측판의하단이삽입되어교축방향으로연결단부가서로접하도록세팅된상태에서, 교축방향으로연통된내측공간에충전홀을통해충전된콘크리트(C)에의하여구조적일체성을확보하도록하는프리캐스트연석모듈및 그제작방법이개시된다.

    Abstract translation: 公开了预制路缘石模块及其制造方法。 预制路缘石模块是形成为倒U形的预制构件,包括:两个侧板; 形成在两个侧板的上端之间的上板; 以及形成为穿透上板的填充孔。 虽然两个侧板的下端被插入到预制板的接合槽中,以便使连接端部能够在纵向彼此连接。所公开的预制路缘石模块及其制造方法确保了结构 通过混凝土(C)的完整性填充在通过填充孔沿纵向方向连通的内部空间。