-
公开(公告)号:ES2083558T3
公开(公告)日:1996-04-16
申请号:ES91850083
申请日:1991-03-28
Applicant: OTIS ELEVATOR CO
Inventor: RICHARDS DOUGLAS , ANDERSON ROBERT , BENNETT PAUL
-
公开(公告)号:MY123947A
公开(公告)日:2006-06-30
申请号:MYPI9804543
申请日:1998-10-05
Applicant: OTIS ELEVATOR CO
Inventor: THOMPSON MARK S , BEALS JAMES T , MCCLUSKEY PHILIP H , MCKEE DAVID W , LANG MICHAEL C , LUSSIER FRED J , LEDOUX JOSEPH A L , NGUYEN DAT T , BENNETT PAUL
Abstract: AN ELEVATOR SAFETY BRAKE FOR STOPPING AN ELEVATOR CAR IS PROVIDED WITH A BRAKE SHOE (25) HAVING A MOLYBDENUM ALLOY FRICTION SURFACE (32) FOR CONTACTING AN ELEVATOR GUIDE RAIL SURFACE (16) TO PROVIDE A STOPPING FORCE. THE MOLYBDENUM ALLOY CONTAINS 99.4 WEIGHT PERCENT MOLYBDENUM, 0.5 WEIGHT PERCENT TITANIUM AND 0.1 WEIGHT PERCENT ZIRCONIUM. THE FRICTION SURFACE (32) OF THE BRAKE FORMED FROM THE ALLOY EXHIBITS A CONSISTENT HIGH FRICTION AND LOW WEAR SUITABLY ACCOMMODATING HIGH SPEED, HIGH LOAD ELEVATORS INSTALLED IN VERY TALL BUILDINGS.(FIGURE 1)
-
公开(公告)号:SG64455A1
公开(公告)日:1999-04-27
申请号:SG1997003840
申请日:1997-10-22
Applicant: OTIS ELEVATOR CO
Inventor: WAN SAMUEL C , COONEY ANTHONY , SALMON LUCYMARY , MCCARTHY RICHARD C , BITTAR JOSEPH , BARKER FREDERICK H , POWELL BRUCE A , BENNETT PAUL
IPC: B61B13/12 , B61B15/00 , B66B1/14 , B66B1/18 , B66B9/16 , B66B1/24 , B66B9/00 , B66B9/02 , B66B11/04 , B66B17/20 , B66B17/28
Abstract: Elevator cabs (A,B) are transferred between elevators, which may be shuttles, in various levels of a building, such as transport floors, in response to car calls registered in the cabs and hall calls registered on the transport floors. The cabs may be transferred from carriages (107) or bogeys onto elevator car frames (104) in a lateral direction, which is perpendicular to the motion of the cab on a carriage (107) or bogey, or in a longitudinal direction which is the same as the direction of motion of a cab on a carriage or bogey. The horizontal/vertical control and transfer may be effected in response to the arrival at transport floors of elevators having cabs therein, or in response to the arrival at an elevator of a bogey carrying a cab which must be transported between a transport floor on one level of a building and a transport floor on another level of a building, in order to serve the need of a car call registered therein or a hall call. The horizontal transportation may occur on transport floors within a building, or may extend between different building segments or between different buildings.
-
公开(公告)号:ZA9700365B
公开(公告)日:1998-07-02
申请号:ZA9700365
申请日:1997-01-16
Applicant: OTIS ELEVATOR CO
Inventor: BARKER FREDERICK H , BITTAR JOSEPH , BENNETT PAUL , COONEY ANTHONY , MCCARTHY RICHARD CHARLES , POWELL BRUCE A , WAN SAMUEL C , WIERSCHKE GILBERT WAYNE
CPC classification number: B66B1/2458 , B66B1/2491 , B66B9/00 , B66B9/003 , B66B2201/303 , B66B2201/304 , B66B2201/306 , Y10S187/902
-
公开(公告)号:AU1017997A
公开(公告)日:1997-07-24
申请号:AU1017997
申请日:1997-01-15
Applicant: OTIS ELEVATOR CO
Inventor: BARKER FREDERICK H , BITTAR JOSEPH , BENNETT PAUL , COONEY ANTHONY , MCCARTHY RICHARD CHARLES , POWELL BRUCE A , WAN SAMUEL C , WIERSCHKE GILBERT WAYNE
Abstract: An elevator shuttle includes a plurality of elevator hoistways (14, 19, 24) which overlap, the elevator car frames (13, 21, 25) traveling in each hoistway including two decks per cab being carried by the car frame, plus an extra deck on car frames (20) in other than the highest (24) and lowest (14) hoistways. This allows cabs (C) traveling simultaneously, upwardly, in three or more hoistways to pass cabs (A, B) simultaneously traveling downwardly in those hoistways. The cabs may be loaded and unloaded while in the hoistway (Figs. 1, 13, 21) , or while in off-hoistway landing areas (Fig. 28). Embodiments include one cab per hoistway and two cabs per hoistway; three hoistways and four hoistways.
-
公开(公告)号:AU7198496A
公开(公告)日:1997-06-12
申请号:AU7198496
申请日:1996-11-26
Applicant: OTIS ELEVATOR CO
Inventor: WAN SAMUEL C , POWELL BRUCE A , SALMON JOHN KENNEDY , BENNETT PAUL , COONEY ANTHONY , MCCARTHY RICHARD CHARLES , BITTAR JOSEPH , BARKER FREDERICK H
Abstract: A first slidable auxiliary pinion (58a) on the bottom of a horizontally moveable elevator cab A disposed on a car frame (14) or a landing is moved out from under the cab toward another car frame (13) or landing by means of a motorized pinion (56) until it engages a motorized pinion (57) on the adjacent car frame (13) or landing, which then pulls the auxiliary pinion and the entire cab toward the other car frame or landing until a main rack (45) fixed to the bottom of the cab engages a motorized pinion (34) on the other car frame (13) or landing, which pinion then pulls the entire cab onto the other car frame or landing. The auxiliary racks (58a, 58b) may be mounted on a common auxiliary rack member (58), or may be separate. The auxiliary motorized pinions (55, 56, 57) may be bidirectional, or may be unidirectional and mounted on the same shaft with main pinions (32a, 32c; 33a, 33c; 34a, 34c).
-
公开(公告)号:AU7191696A
公开(公告)日:1997-06-05
申请号:AU7191696
申请日:1996-11-21
Applicant: OTIS ELEVATOR CO
Inventor: POWELL BRUCE A , BITTAR JOSEPH , BARKER FREDERICK H , WAN SAMUEL C , SALMON JOHN KENNEDY , BENNETT PAUL , COONEY ANTHONY , MCCARTHY RICHARD CHARLES
IPC: B66B9/00
-
公开(公告)号:AU7191496A
公开(公告)日:1997-06-05
申请号:AU7191496
申请日:1996-11-21
Applicant: OTIS ELEVATOR CO
Inventor: MCCARTHY RICHARD CHARLES , COONEY ANTHONY , BENNETT PAUL , WIERSCHKE GILBERT WAYNE , BITTAR JOSEPH , POWELL BRUCE A , BARKER FREDERICK H , WAN SAMUEL C
Abstract: A plurality of elevator shuttles (1-10) are dispatched in a sequence at regular intervals which extend across the average round trip run time for all of the shuttles, by enabling a shuttle to run (101, in response to the shuttle being ready to run (96) following expiration of a dispatching interval (97) which equals the average run time of all the shuttles (91).
-
公开(公告)号:ZA969390B
公开(公告)日:1997-06-02
申请号:ZA969390
申请日:1996-11-07
Applicant: OTIS ELEVATOR CO
-
公开(公告)号:ZA969384B
公开(公告)日:1997-06-02
申请号:ZA969384
申请日:1996-11-07
Applicant: OTIS ELEVATOR CO
Inventor: WAN SAMUEL C , POWELL BRUCE A , SALMON JOHN KENNEDY , BENNETT PAUL , COONEY ANTHONY , MCCARTHY RICHARD CHARLES , BITTAR JOSEPH , BARKER FREDERICK H
Abstract: A first slidable auxiliary pinion (58a) on the bottom of a horizontally moveable elevator cab A disposed on a car frame (14) or a landing is moved out from under the cab toward another car frame (13) or landing by means of a motorized pinion (56) until it engages a motorized pinion (57) on the adjacent car frame (13) or landing, which then pulls the auxiliary pinion and the entire cab toward the other car frame or landing until a main rack (45) fixed to the bottom of the cab engages a motorized pinion (34) on the other car frame (13) or landing, which pinion then pulls the entire cab onto the other car frame or landing. The auxiliary racks (58a, 58b) may be mounted on a common auxiliary rack member (58), or may be separate. The auxiliary motorized pinions (55, 56, 57) may be bidirectional, or may be unidirectional and mounted on the same shaft with main pinions (32a, 32c; 33a, 33c; 34a, 34c).
-
-
-
-
-
-
-
-
-