Abstract:
PURPOSE: A handrail installation structure for a floor plate having a tube-shaped section is provided to construct and dismantle easily by simplifying an installation structure. CONSTITUTION: In the handrail installation structure for a floor plate having a tube-shaped section, a handrail member(10) is installed on the lateral section of a floor plate(1), and provided with a vertical post member(11) installed vertically to protect vehicles and a horizontal insertion member connected with the vertical post member(11) and interposed to the tube-shaped inside of the floor plate(1). While the horizontal insertion member is interposed to the floor plate(1), a fastener(13) is fastened through the floor plate(1) and the horizontal insertion member, so that the handrail member(10) is installed on the floor plate(1).
Abstract:
콘크리트패널내에매립되는다수의섬유다발인스트랜드각각에일정한긴장력이도입되도록일괄적으로긴장력을도입함으로써, 콘크리트패널내에매립되는스트랜드각각에개별적으로긴장력을도입하는방법에비하여도입되는긴장력을일정하게유지함에따라품질을향상시킬수 있고, 그립, 긴장력도입장치의설치및 해체시간을크게절감함에따라콘크리트패널의제작속도를향상시킬수 있고제작비를절감시킬수 있으며, 또한, 콘크리트패널내에매립되는스트랜드를소요위치(수평방향및 수직방향)에정밀하게배치할수 있고, 스트랜드를다층으로배치가가능하여정밀한제작이가능하여품질을향상시킬수 있고, 또한, 고가의섬유다발인스트랜드에긴장력을도입하는경우콘크리트패널의균열을방지할수 있고, 휨강성을향상시켜긴장력을도입하지않는경우에비하여스트랜드의소요수량을크게절감할수 있는, 매립스트랜드에긴장력을도입한프리캐스트프리스트레스트콘크리트패널의제작방법이제공된다.
Abstract:
본 발명은 2종 이상의 복수개 종류의 섬유를 이용한 하이브리드 섬유보강 폴리머 보강근을 제작하되, 섬유를 설계 의도에 따라 섬유보강 폴리머 보강근 단면의 특정 위치에 분포시킨 구성의 하이브리드 섬유보강 폴리머 보강근을 제조할 수 있는 방법과, 이를 위한 제조장치, 그리고 이를 위한 성형노즐에 관한 것이다. 본 발명에서는 성형노즐(100)을 이용하여 섬유와 수지로 이루어진 FRP 보강근을 제조하는 장치로서, 상기 성형노즐(100)은, 외측 노즐(11)과, 복수개의 중간 노즐(12)을 포함하여 구성되며, 노즐 사이의 간격을 구획하면서도 노즐의 회전에 의해 그 위치가 변경될 수 있는 결합구획부재를 구비하고 있어서, 가장 내측에 위치하는 중간 노즐의 중앙공을 통해서 섬유가 공급되고, 중간 노즐 간의 간격을 통해서도 섬유가 공급되며, 중간 노즐과 외측 노즐 사이의 간격을 통해서도 섬유가 공급되어, 섬유가 FRP 보강근의 중심에서 외곽으로 갈수록 복수개의 섬유분포층을 이루고, 각 섬유분포층에서도 원주를 따라 섬유가 다르게 분포되어 있는 단면을 가지는 복합 FRP 보강근(1)을 만들되, 각 섬유분포층에서의 섬유 분포를 필요에 따라 용이하게 변화시킬 수 있는 구성을 가지는 FRP 보강근의 제조장치가 제공되며, 아울러 이를 이용하여 FRP 보강근을 제조하는 방법 및 이에 사용되는 성형노즐이 제공된다.
Abstract:
본 발명은 2종 이상의 복수개 종류의 섬유를 이용한 하이브리드 섬유보강 폴리머 보강근을 제작하되, 섬유를 설계 의도에 따라 섬유보강 폴리머 보강근 단면의 특정 위치에 분포시킨 구성의 하이브리드 섬유보강 폴리머 보강근을 제조할 수 있는 방법과, 이를 위한 제조장치에 관한 것이다. 본 발명에서는 성형노즐(100)을 이용하여 섬유와 수지로 이루어진 봉형상의 FRP 보강근을 제조하는 장치로서, 상기 성형노즐(100)은, 섬유의 진행방향으로 복수개의 노즐체가 순차적으로 직렬로 배치되어 있는 구성을 가지고 있으며; 상기 복수개의 노즐체에서, 전방에 위치하는 노즐체의 입구는 후방에 위치하는 노즐체의 출구보다 더 큰 단면 크기를 가지고 있고; 후방에 위치하는 노즐체에 의해 인발 성형된 섬유의 봉이 전방에 위치하는 노즐체의 입구로 들어 갈 때, 수지로 함침된 섬유가 함께 전방에 위치하는 노즐체의 입구로 함께 공급되어 전방에 위치하는 노즐체에 의하여 인발 성형됨으로써 섬유가 FRP 보강근의 단면에서 반지름 방향으로 중심에서 외곽으로 갈수록 복수개의 섬유층을 이루면서 분포되어 있는 단면을 가지는 하이브리드 FRP 보강근을 만들게 되는 FRP 보강근의 제조장치가 제공되며, 아울러 이를 이용하여 FRP 보강근을 제조하는 방법이 제공된다.
Abstract:
PURPOSE: A pedestrian bridge construction method using a PSC girder, including a connection part anchorage is provided to definitely improve the rigidity of a connection part of an adjacent PSC girder segment. CONSTITUTION: A pedestrian bridge construction method using a PSC girder, including a connection part anchorage includes the following steps. PSC girder segments are connected with one another in a longitudinal direction and are set to the predetermined length by the PSC girder. A conduction prevention unit is installed in the PSC girder segment using an anchor bolt. A connection part strain member is installed in a strain hole of the connection part anchorage of the PSC girder segment in order to compress the connection part of the PSC girder segment. A cross beam connection panel is installed in the strain hole in order to be united with the connection part anchorage. One end of a strut (510) is installed in the connection part anchorage using an anchor. A sidewalk (500) is installed on the top surface of an upper flange of the PSC girder in order to be supported by the strut.
Abstract:
PURPOSE: A prestressed concrete (PSC) girder segment including a connection part mounting end, and a PSC girder and a construction method for a modular PSC girder bridge using the same are provided to allow a user to easily perform the installation work of a horizontal beam and surely increase the rigidity of a connection part of adjacent PSC girder segments. CONSTITUTION: A construction method for a modular PSC girder bridge using a PSC girder segment comprises as follows. The PSC girder segments are connected in a horizontal direction and are consecutively constructed so that a PSC girder (100) is constructed. A connection part tendon (150) is installed on a strain hole of a connection anchoring end of the PSC girder segment. Both ends of the PSC girder are supported in a longitudinal direction in between bridge lower structures by a bridge support so that a horizontal beam is formed in a transverse direction. [Reference numerals] (AA) Insertion; (BB) Horizontal direction; (CC) Vertical direction
Abstract:
PURPOSE: A wave break structure using a concrete beam reinforced by a fiber reinforced polymer (FRP) re-bar is provided to facilitate the partial detachment, replacement, and reconstruction of a wave break beam which is damaged. CONSTITUTION: A wave break structure (10) using a concrete beam reinforced by an FRP re-bar comprises a wave break beam (1), a partition (2), and a linking cover (3). The partitions are separately arranged in a lateral direction. A plurality of wave break beams are arranged to cross the partitions. The partition is formed with a concave groove to be inserted with the wave break beam. The linking cover covers the wave break beam arranged in the concave groove. The wave break beam is made of a concrete beam reinforced with an FRP re-bar. Each end of the wave break beam is widened.