Extendable casing for sand pile placing
    1.
    发明专利
    Extendable casing for sand pile placing 有权
    用于沙滩放置的可扩展套管

    公开(公告)号:JP2004238978A

    公开(公告)日:2004-08-26

    申请号:JP2003030738

    申请日:2003-02-07

    Abstract: PROBLEM TO BE SOLVED: To provide an extendable casing for sand pile placing having a lock part capable of withstanding an impact load to be applied by a vibrator.
    SOLUTION: This extendable casing 10 for sand pile placing is provided with a lock mechanism 50 installed in a leader, which is erected in a base machine or a support vessel integrally with a hopper and a vibrator, freely to elevate to lock an inner casing 20 and an outer casing 40 with each other in the extending condition and shrinking condition. The lock mechanism 50 is formed so that screw type lock pins 54 provided in the outer casing 40 are inserted into a plurality of lock holes 23a formed on the same circumference of the inner casing.
    COPYRIGHT: (C)2004,JPO&NCIPI

    Abstract translation: 要解决的问题:提供一种用于砂桩放置的可延伸外壳,其具有能够承受由振动器施加的冲击载荷的锁定部件。 解决方案:这种用于砂堆放置的可伸缩套管10设置有安装在引导器中的锁定机构50,该引导件竖立在与机器和振动器一体的基本机器或支撑容器中,自由地提升以锁定 内壳体20和外壳体40处于延伸状态和收缩状态。 锁定机构50形成为使得设置在外壳40中的螺纹型锁定销54插入形成在内壳的同一圆周上的多个锁定孔23a中。 版权所有(C)2004,JPO&NCIPI

    Utilization and treatment method of sludge produced in soil improvement or the like to foundation structure
    10.
    发明专利
    Utilization and treatment method of sludge produced in soil improvement or the like to foundation structure 有权
    土壤改良产生的泥土的利用和处理方法或类似于基金会结构

    公开(公告)号:JP2007177497A

    公开(公告)日:2007-07-12

    申请号:JP2005376810

    申请日:2005-12-28

    Abstract: PROBLEM TO BE SOLVED: To facilitate diversion to a foundation structure that can easily meet design quality, arrangement and the like in a construction region regarding sludge discharged to the ground surface side.
    SOLUTION: This utilization and treatment method to the foundation structure is provided for the sludge b1 produced when a part of a solidifying agent a1 injected into the ground is discharged rising to the ground surface side together with soil and the like when injecting the solidifying agent into the ground of the construction area by a construction machine 1 to improve soil or to construct an underground continuous wall. A recess 4 is formed on the ground surface side corresponding to an injection part before injecting the solidifying agent a1 into the ground, and after a vertically penetrating form 2 (2A) for the foundation structure is installed in the recess 4, the solidifying agent a1 is injected into the ground by the construction machine 1. The sludge b1 discharged rising to the ground surface side is thereby received into the form and solidified.
    COPYRIGHT: (C)2007,JPO&INPIT

    Abstract translation: 要解决的问题:为了便于转移到能够容易地满足在排放到地面侧的污泥的施工区域中的设计质量,布置等的基础结构。 解决方案:当将注入地面的凝固剂a1的一部分与土壤等一起喷射到地表侧时,产生的污泥b1用于基础结构的这种利用和处理方法,当注入 固化剂由建筑机械1施工到施工区域的地面,以改善土壤或构建地下连续墙。 在将固化剂a1注入地面之前,在与注射部对应的地面侧形成有凹部4,在凹部4中安装有用于基础结构的上下贯穿形式2(2A)后,固化剂a1 被施工机械1注入地面中。由此,上升到地面侧的污泥b1被收纳成形状固化。 版权所有(C)2007,JPO&INPIT

Patent Agency Ranking