작업장 공정균형 및 Layout 설계기술
    1.
    发明公开
    작업장 공정균형 및 Layout 설계기술 无效
    用于建立最佳生产系统的商店线平衡布置设计技术和开发新产品的建模,零件地图设计,工作线图设计,装配说明和线平衡

    公开(公告)号:KR1020050022762A

    公开(公告)日:2005-03-08

    申请号:KR1020030060462

    申请日:2003-08-27

    Inventor: 문덕희

    Abstract: PURPOSE: A shopfloor line balancing and layout designing technique is provided to correct constitution of the system with regard to learning effect of operators in progressing the production process after building a production system. CONSTITUTION: For the shopfloor line balancing and layout designing technique, an optimal production system is built, various processes and the cycle time for developed products are analyzed, the proper number of operators for maximizing the efficiency of a new line is calculated by using a line balancing method, and then a layout of the shopfloor is decided by a 3D(Dimension) model. For a fist plan, production rate for one day is 114 when cycle time is 210 seconds and 12 operators are input. For a second plan, production rate for one day is 80 when the cycle time is 300 seconds and 8 operators are input. The time for fifth and sixth steps of the first plan is shortened to 180 seconds. The production rate for one day is 133 when the cycle time is 180 seconds.

    Abstract translation: 目的:提供车间线平衡和布局设计技术,以纠正运营商在建立生产系统后进行生产过程的学习效果的系统构成。 规定:对于车间线平衡和布局设计技术,建立了最佳生产系统,分析了各种工艺和开发产品的循环时间,通过使用一条线来计算适合数量的最大化效率的运营商 平衡方法,然后由3D(Dimension)模型决定车间布局。 对于第一个计划,当周期时间为210秒时,一天的生产率为114,输入12个操作员。 对于第二个计划,当循环时间为300秒,输入8个操作员时,一天的生产率为80。 第一个计划的第五个和第六个步骤的时间缩短到180秒。 当循环时间为180秒时,一天的生产率为133。

Patent Agency Ranking