公开(公告)号:KR1020130093567A
公开(公告)日:2013-08-22
申请号:KR1020130015836
申请日:2013-02-14
Applicant: 서울대학교산학협력단
Abstract: PURPOSE: A skyscraper construction project construction duration predicting system considering a weather factor's vertical changes quantitatively predicts a weather factor's possible influence on construction activities based on weather information in a database and generates quantitative data by predicting possible changes of the weather factor due to increases in altitude. CONSTITUTION: A climatological data processing module (A1) generates weather distribution data of a reference weather value using weather values in a weather database (D1). A climatological data simulation module (A2) generates a set of weather values regarding a specific schedule. An altitude-specific weather data generation module (A3) generates another set of weather values regarding a specific altitude. A non-workable day calculation module (B1) compares the altitude-specific set of weather values with a pre-determined non-workable day standard. A process simulation module (B2) successively carries out a simulation process on the entire processes. A construction duration analysis module (B3) analyzes data about process-specific duration for each process and the entire duration of a construction project transmitted by the process simulation module. [Reference numerals] (A) Weather data generating module; (A1) Weather data processing module; (A2) Weather simulation module; (A3) Weather data by altitude generation module; (B) Air calculation simulation module; (B1) Non-working day calculation module; (B2) Process simulation module; (B3) Construction duration analysis module; (D1) Weather database; (D2) Process database; (D3) Workability standard database
Abstract translation: 目的:考虑到天气因素垂直变化的摩天大楼建设项目建设时间预测系统,可以根据数据库中的天气信息量化天气因素对建筑活动的可能影响,并通过预测由于高度的增加而导致的天气因素的可能变化而产生定量数据 。 规定:气候数据处理模块(A1)使用天气数据库(D1)中的天气值生成参考天气值的天气分布数据。 气候数据模拟模块(A2)生成关于特定时间表的一组天气值。 高度特定的天气数据生成模块(A3)产生关于特定高度的另一组天气值。 不可行日计算模块(B1)将高度特定的天气值集合与预定的不可行天标准进行比较。 过程模拟模块(B2)对整个过程进行连续的模拟处理。 施工持续时间分析模块(B3)分析过程模拟模块发送的每个过程的过程特定持续时间和建筑项目的整个持续时间的数据。 (附图标记)(A)气象数据生成模块; (A1)天气数据处理模块; (A2)天气模拟模块; (A3)高度生成模块的天气数据; (B)空气计算模拟模块; (B1)非工作日计算模块; (B2)过程模拟模块; (B3)施工期间分析模块; (D1)天气数据库; (D2)流程数据库; (D3)可操作性标准数据库
-
公开(公告)号:KR101201732B1
公开(公告)日:2012-11-27
申请号:KR1020110040281
申请日:2011-04-28
Applicant: 주식회사 두올테크 , 서울대학교산학협력단 , 성균관대학교산학협력단
IPC: A45C11/00 , H04B1/3888 , G01B3/18 , G01B3/20
Abstract: 본 발명은 휴대 단말기 케이스에 관한 것으로, 특히 일면과 상기 일면에 대향하는 타면 중 적어도 하나는 개구된 구조의 케이스본체와 상기 케이스본체의 제1테두리부에 형성되는 측정모듈을 포함하되, 상기 측정모듈은, 상기 제1테두리부에 형성되어 측정대상물의 내경 또는 외경을 측정하는 측정돌기와, 상기 측정돌기가 이동하도록 상기 테두리부에 형성되는 가이드홈을 포함하여 구성될 수 있다.
본 발명에 따르면, 스마트폰 케이스에 측정 대상물의 내경이나 외경을 측정할 수 있는 측정모듈을 구비하여 측정의 간편성을 높이며, 수평기와 수평조절장치를 더 구비하여 번거로운 장비를 별도로 구비하지 않더라고 편리하게 수평도를 측정할 수 있어 휴대성 및 실용성을 극대화한 휴대 단말기 케이스를 구현할 수 있는 효과가 있다.-
公开(公告)号:KR1020170056912A
公开(公告)日:2017-05-24
申请号:KR1020150160335
申请日:2015-11-16
Applicant: 서울대학교산학협력단
Abstract: 재난기반시뮬레이션시스템이개시된다. 건물의화재데이터를생성하는재난대응시뮬레이터; 상기화재데이터를전달받고, 상기화재데이터를이용하여유독가스데이터를생성하는화재시뮬레이터; 및상기재난대응시뮬레이터와상기화재시뮬레이터를연동시키는연동장치;를포함하되, 상기재난대응시뮬레이터는상기연동장치를통해상기유독가스데이터를전달받고, 상기유독가스데이터를이용하여상기건물재실자의신체무능화정도를산출하므로, 데이터파일형식의변환과정이생략될수 있으며, 데이터상호운용성이향상될수 있다.
Abstract translation: 公开了基于灾难的仿真系统。 用于生成建筑火灾数据的灾害响应模拟器; 火灾模拟器接收火灾数据并使用火灾数据产生有毒气体数据; 以及一种联锁装置,用于联锁灾难响应模拟器和消防模拟器,其中灾难响应模拟器通过联锁装置接收有毒气体数据,并使用有毒气体数据来禁用建筑物乘员的身体 数据文件格式转换过程可以省略,数据互操作性可以提高。
-
4.
公开(公告)号:KR101379407B1
公开(公告)日:2014-03-28
申请号:KR1020130015836
申请日:2013-02-14
Applicant: 서울대학교산학협력단
Abstract: 본 발명은 건설관리분야에서 초고층 빌딩 건설 프로젝트의 공사기간 예측 시스템에 관한 것으로, 초고층 건축 프로젝트의 공정계획시의 영향요인인 기온, 풍속, 강우 등의 기후요인에 대하여, 과거의 기후데이터를 통해 현재의 기후를 예측할 수 있는 데이터베이스를 구축하고, 고도 증가에 따른 변화량을 산정 후, 작업불가능기준과 연계하여, 공종별/고도별로 기후요인을 반영한 공사기간을 예측하는 시스템에 관한 것으로서 데이터베이스는 기후데이터베이스(D1), 공정데이터베이스(D2), 및 작업불가능기준데이터베이스(D3)로 구성되고, 기후데이터생성모듈(A)은 기후데이터처리모듈(A1), 기후시뮬레이션모듈(A2), 및 고도별기후데이터생성모듈(A3)로 구성되고, 공기산정시뮬레이션모듈(B)은 작업불능일산정모듈(B1), 공정시뮬레이션모듈(B2), 및 공사기간� �석모듈(B3)로 구성된다.
-
公开(公告)号:KR101276528B1
公开(公告)日:2013-06-24
申请号:KR1020110002768
申请日:2011-01-11
Applicant: 서울시립대학교 산학협력단 , 서울대학교산학협력단 , 주식회사 건축사사무소건원엔지니어링 , (주)한미글로벌건축사사무소 , 단국대학교 산학협력단 , (주) 희림종합건축사사무소
Abstract: 본 발명은 공사기간의 적정성심사기준을 수립하여 공사기간을 고려한 낙찰자 선정 프로세스를 제공하고, 발주자가 확보하고 있는 공사기간 및 생산성 자료를 바탕으로 사례기반추론을 적용하여, 적정한 공사기간을 제시한 낙찰자를 선정하는 예측 프로세스를 제공하기 위한 1일 생산성 정보 기반의 공기단축형 발주를 위한 낙찰자 선정 방법을 제공한다.
이를 위해 본 발명은 상기한 목적을 달성하기 위한 본 발명의 일예에 따르면, 발주자의 공사비 및 공사기간에 대한 데이터를 보유하지 않은 경우의 낙찰자 선정 방법에 있어서, 컴퓨팅 장치의 낙찰자 선정 프로세스 모듈에서 전체 입찰자의 자료를 수집하고, 각 입찰자의 수집 자료 중에서 공사기간 자료가 특정 개수이상인 경우와 미만인 경우로 구분하는 단계와, 상기 낙찰자 선정 프로세스 모듈에서 상기 분류된 공사기간 자료가 특정 개수 미만인 경우와, 특정 개수 이상인 경우에 대해 각각 연산하여 평균값을 산출하고, 해당 평균값을 공종평균공사기간으로 제시하는 단계 및, 상기 낙찰자 선정 프로세스 모듈에서 상기 공종평균공사기간을 기준기간으로 하고, 각 입찰자가 제시한 공사비를 고려하여 낙찰자를 선정하는 단계를 포함하여 이루어진 � �을 특징으로 한다.-
-
公开(公告)号:KR1020120129099A
公开(公告)日:2012-11-28
申请号:KR1020110047153
申请日:2011-05-19
Applicant: (주)한미글로벌건축사사무소 , 단국대학교 산학협력단 , 서울대학교산학협력단 , 서울시립대학교 산학협력단 , 주식회사 건축사사무소건원엔지니어링 , (주) 희림종합건축사사무소
CPC classification number: G06Q10/06375 , G06Q10/04 , G06Q50/08
Abstract: PURPOSE: A construction frame work cost prediction system is provided to create construction cost computation information by comparing the stored construction information with designed construction information received from a construction cost management server. CONSTITUTION: A construction cost prediction server(100) stores construction information which influences on construction costs. The construction cost prediction server compares construction information received from the stored construction information and a construction cost management server(200). The construction cost prediction server computes construction costs. The construction management server transmits the construction information to the construction cost prediction server. [Reference numerals] (AA) Information communication network
Abstract translation: 目的:提供一种施工框架工作成本预测系统,通过将存储的施工信息与从施工成本管理服务器接收的设计施工信息进行比较,创建施工成本计算信息。 构成:施工成本预测服务器(100)存储影响施工成本的施工信息。 施工成本预测服务器将从所存储的施工信息接收的施工信息与施工成本管理服务器(200)进行比较。 施工成本预测服务器计算施工成本。 施工管理服务器将施工信息发送给施工成本预测服务器。 (附图标记)(AA)信息通信网络
-
公开(公告)号:KR1020120122212A
公开(公告)日:2012-11-07
申请号:KR1020110040256
申请日:2011-04-28
Applicant: 주식회사 두올테크 , 서울대학교산학협력단 , 성균관대학교산학협력단
CPC classification number: Y02P90/30 , G06Q10/06311 , H04W4/12 , H04W12/06
Abstract: PURPOSE: A smart phone based laborer attendance managing system and an attendance managing method thereof are provided to transmit photographed photos to a management server after photographing laborers in a construction field by using a smart phone, thereby processing attendance processing in real time in a long distance. CONSTITUTION: A database unit(31) stores uploaded attendance information of laborers. An attendance alarm means(32) transmits an alarm message about whether or not attendance of a laborer corresponding to a login identification to a smart phone. An identification processing means(33) uploads a face photo, a location coordinate, and photographing time to attendance information about the laborer corresponding to the login identification. [Reference numerals] (31) Database unit; (31a) Output information; (31b) Safety management information; (32) Unit for informing whether to output; (33) Output processing unit
Abstract translation: 目的:提供一种基于智能手机的劳动者考勤管理系统及其考勤管理方法,通过使用智能手机拍摄施工现场的劳动者后,将管理服务器拍摄的照片发送给管理服务器,从而长时间实时处理考勤处理 。 规定:数据库单元(31)存储劳动者上传的考勤信息。 出勤报警装置(32)向智能电话机发送关于登录识别对应的劳动者出勤的报警消息。 识别处理装置(33)将面部照片,位置坐标和拍摄时间上传到与登录标识相对应的关于劳动者的考勤信息。 (附图标记)(31)数据库单元; (31a)输出信息; (31b)安全管理信息; (32)通知是否输出的单位 (33)输出处理单元
-
公开(公告)号:KR101107209B1
公开(公告)日:2012-01-25
申请号:KR1020100023461
申请日:2010-03-16
Applicant: 서울대학교산학협력단
Abstract: 본 발명은 웹상에서 건설기업의 성과를 관리하기 위한 성과관리시스템에 관한 것으로, 더욱 상세하게는 시스템 기반이 미비한 중소 건설업체 간에 서로의 성과를 공유하고 나아가 타사의 성과를 적극적으로 활용할 수 있도록 구현한 성과관리시스템에 관한 것이다.
본 발명에 따른 건설기업간 벤치마킹을 위한 웹기반 성과관리시스템은, BSC기반의 성과관리항목에 따른 성과지표를 기업차원과 프로젝트차원으로 구분하면서 차원별 성과지표를 설정받는 성과지표설정모듈; 성과지표에 대한 성과내용을 성과점수로 입력받는 성과입력모듈; 성과점수를 분석하여 성과분석데이터를 생성하는 성과분석모듈; 성과분석데이터가 저장되는 성과관리데이터베이스; 성과관리데이터베이스에서 성과점수가 상위레벨에 속하는 성과지표의 성과분석데이터를 추출하는 벤치마킹항목추출모듈; 성과지표설정모듈, 성과입력모듈, 성과분석모듈, 벤치마킹항목추출모듈에서 제공, 입력, 획득되는 정보를 출력하는 성과출력모듈;을 포함하여 구성되는 것을 특징으로 한다.-
公开(公告)号:KR1020100105450A
公开(公告)日:2010-09-29
申请号:KR1020100023461
申请日:2010-03-16
Applicant: 서울대학교산학협력단
CPC classification number: G06Q10/06393 , G06Q50/30 , H04L67/02
Abstract: PURPOSE: A web-based result management system for the benchmarking between construction companies is provided to compare and manages results of a plurality of construction companies based on a web, thereby the construction companies can grasp a self status. CONSTITUTION: A web server provides information about managing performance of construction company according toe a request of a user. A user terminal is connected with the web server by a network. The web server comprises next. A result index setup module sets result indexes according to items managing results. A result input module inputs result contents about the result indexes as result scores. A result analysis module generates result analyzing data by analyzing the result scores.
Abstract translation: 目的:提供建筑公司基准的基于网络的结果管理系统,以比较和管理基于网络的多家建筑公司的结果,从而建筑公司可以掌握自我状态。 规定:Web服务器根据用户的请求提供有关管理施工公司绩效的信息。 用户终端通过网络与web服务器连接。 Web服务器包含下一个。 结果索引设置模块根据项目管理结果设置结果索引。 结果输入模块将结果指标的结果内容输入为结果分数。 结果分析模块通过分析结果分数来生成结果分析数据。
-
-
-
-
-
-
-
-
-