-
公开(公告)号:KR1020120097740A
公开(公告)日:2012-09-05
申请号:KR1020110017133
申请日:2011-02-25
Applicant: 성균관대학교산학협력단
CPC classification number: B66B1/3492 , B66B1/302 , B66B2201/101
Abstract: PURPOSE: A method and an apparatus for operating a smart elevator are provided to save energy without hurting the convenience of users and to effectively operate an elevator. CONSTITUTION: A method for operating a smart elevator is as follows. The call of an elevator is received from a user locating in a first floor or a common entrance(S100). When the user calls the elevator, the current floor of the elevator is checked(S200). If the current floor is higher than 10th floor, the elevator moves down to the first floor. If the current floor is the 10th floor or lower than the 10th floor, the elevator moves down to the first floor after waiting in a standby time(S300). In the standby time, whether or not other users exist in other floors higher than the current floor. If other users do not exist, the elevator moves down to the first floor(S400). If other users exist, the difference of the current floor and the first floor and the difference of the current floor and the current floor and other floors where other users exist are compared. If the difference of the current floor and the first floor is small, the elevator directly moves down to the first floor. If the difference of the current floor and other floors where other users exist is small, the elevator moves up to other floors to board other users and moves down to the first floor(S500). [Reference numerals] (AA) Start; (BB) Finish; (S100) Receiving the call signal of an elevator from a common porch or a first floor; (S200) Checking a current floor of the elevator when receiving the call signal; (S300) Current floor > 10th floor; (S320) Standby for (12-current floor) seconds; (S400) Detecting other users within the (12-current floor) seconds; (S500) Current floor - 1 >= other user floor - current floor; (S520) Ascending to other user floors; (S540) Descending to the first floor
Abstract translation: 目的:提供一种操作智能电梯的方法和装置,以节省能源,而不伤害用户的便利和有效地操作电梯。 构成:智能电梯的操作方法如下。 从位于一楼或公共入口的用户接收电梯的呼叫(S100)。 当用户呼叫电梯时,检查电梯的当前楼层(S200)。 如果当前楼层高于十楼,电梯向下移动到一楼。 如果当前楼层是10楼或10楼以下,则在待机时间等待之后,电梯向下移动到一楼(S300)。 在待机时间,其他用户是否存在于比当前楼层高的其他楼层。 如果其他用户不存在,则电梯向下移动到一楼(S400)。 如果存在其他用户,则比较当前楼层与一楼的差异以及当前楼层与当前楼层以及其他用户所在楼层的差异。 如果当前楼层和一楼的差异很小,电梯直接向下移动到一楼。 如果当前楼层和其他用户存在的其他楼层的差异很小,则电梯向上移动到其他楼层以登上其他用户并向下移动到一楼(S500)。 (附图标记)(AA)开始; (BB)完成; (S100)从公共门廊或一楼接收电梯的呼梯信号; (S200)接收到呼叫信号时检查电梯的当前楼层; (S300)当前楼层> 10楼; (S320)待机(12当前楼层)秒; (S400)检测(12个当前楼层)秒内的其他用户; (S500)当前楼层 - 1> =其他用户楼层 - 当前楼层; (S520)升级到其他用户楼层; (S540)降到一楼
-
公开(公告)号:KR101740155B1
公开(公告)日:2017-05-25
申请号:KR1020150167209
申请日:2015-11-27
Applicant: 성균관대학교산학협력단 , 강원대학교산학협력단
IPC: C07D237/28 , C07D237/26 , C07C245/08 , B01J23/46
Abstract: 본발명은로듐 (rhodium) 촉매를이용한시놀리논 (cinnolin-3(2H)-one) 유도체의신규한제조방법에관한것으로서, 보다구체적으로는로듐촉매하에서아조벤젠 (azobenzene) 유도체와 5-다이아조-2,2-다이메틸-1,3-다이옥세인-4,6-다이온(5-Diazo-2,2-dimethyl-1,3-dioxane-4,6-dione)간반응을통하여생성되는시놀리논유도체의제조방법에관한것이다. 본발명에따른제조방법은생물학적으로중요한화합물인아조벤젠 (azobenzene)의비활성 C-H 결합을활성화시켜기존의전통적인방법에비하여더욱간단하고효율적으로다양한치환기를가지는시놀리논유도체를합성할수 있다.
-