Abstract:
A system for managing and installing processed iron rods at a construction site in accordance with zone setting by the floor unit by using a computer network is provided to reduce the difficulty in grasping the processed iron rods, considerably when different designs are applied to each floor by regarding one floor unit as a basic unit. A system for managing and installing processed iron rods at a construction site in accordance with zone setting by the floor unit is implemented by using a computer network in which a server site(20), computers(30) of a plurality of construction companies, and computers(40) of a plurality of iron rod processing companies and computers(50) of a plurality of iron rod assembling companies are mutually connected through a network(10). The server site comprises a server computer(21) and a database(22). The server computer comprises a main program(211), a zone setup program(212), a bar list preparing program(213), an iron bar tag information generation program(214) and the other programs(215). The database comprises a registered member DB(221), a set zone information DB(222), a generated bar list DB(223) and a generated iron bar tag information DB(224) and a database in which the other DBs(225) are equipped.
Abstract:
A method for managing and installing processed iron rods at a construction site in accordance with zone setting by the floor unit by using a computer network is provided to make management of the iron rods easily and shorten the construction period substantially by quickly and accurately confirming the locations where corresponding iron rods will be installed. A method for managing and installing processed iron rods at a construction site in accordance with zone setting by the floor unit is realized by using a computer network in which a server site(20), computers(30) of a plurality of construction companies, and computers(40) of a plurality of iron rod processing companies and computers(50) of a plurality of iron rod assembling companies are mutually connected through a network(10). The method comprises the following steps. A member who is in charge of the management of iron bars connects in a construction site to a server site, selects the generation of bar lists of each zone(S301, S305), and then inputs a design drawing(S306). The member sets zones of each floor on the inputted drawing(S307), and then generates temporary bar lists of each zone with respect to each iron bar which will be used in the construction site(S308). Whether the temporary bar lists coincide with the information about iron bars inputted by the member is determined(S309). Bar lists of each floor zone are generated according to information inputted by the member(S310).
Abstract:
A computer-readable medium in which a method for managing and installing processed iron rods at a construction site in accordance with zone setting by the floor unit by using a computer network is recorded is provided to reduce the difficulty in grasping the processed iron rods, dramatically when different designs are applied to each floor by regarding one floor unit as a basic unit. A computer-readable medium in which a method for managing and installing processed iron rods at a construction site in accordance with zone setting by the floor unit by using a computer network is recorded comprises the following steps. A member who is in charge of the management of iron bars in a construction site accesses a server site, selects the generation of bar lists of each zone(S301, S305), and then inputs a design drawing(structural floor plan)(S306). The member sets zones of each floor on the inputted drawing(S307), and then generates temporary bar lists of each zone with respect to each iron bar which will be used in the construction site(S308). Whether the temporary bar lists coincide with the information about iron bars inputted by the member is determined(S309). Bar lists of each floor zone are generated according to information inputted by the member(S310).