公开(公告)号:KR101744560B1
公开(公告)日:2017-06-08
申请号:KR1020150154667
申请日:2015-11-04
Applicant: 한국기술교육대학교 산학협력단
Abstract: 복수의발전소들의출력전류들을제어하는전기저장장치시스템에있어서, 상기전기저장장치시스템은충전부및 전기저장장치관리부를포함한다. 상기충전부는연축전지및 리튬이온전지를포함하는복수의충전지들로형성되고, 상기전기저장장치관리부는상기충전지들의상태를측정하고보호하며상기출력전류들각각에적합한상기충전지들중 어느하나를선택하여상기출력전류들각각을상기선택된충전지에충전하도록제어한다.
-
-
公开(公告)号:KR1020170052340A
公开(公告)日:2017-05-12
申请号:KR1020150154667
申请日:2015-11-04
Applicant: 한국기술교육대학교 산학협력단
Abstract: 복수의발전소들의출력전류들을제어하는전기저장장치시스템에있어서, 상기전기저장장치시스템은충전부및 전기저장장치관리부를포함한다. 상기충전부는연축전지및 리튬이온전지를포함하는복수의충전지들로형성되고, 상기전기저장장치관리부는상기충전지들의상태를측정하고보호하며상기출력전류들각각에적합한상기충전지들중 어느하나를선택하여상기출력전류들각각을상기선택된충전지에충전하도록제어한다.
Abstract translation: 一种用于控制多个发电厂的输出电流的电存储系统,所述电存储系统包括充电器和电存储设备管理器。 填充部由多个可再充电电池包括铅酸电池,锂离子电池,蓄电装置管理单元,用于测量和保护的电池的状态的形成和选择的任何一个所述的电池适合于每个所述输出电流的 并控制每个输出电流为选定的可充电电池充电。
-
公开(公告)号:KR101147347B1
公开(公告)日:2012-05-23
申请号:KR1020100049196
申请日:2010-05-26
Applicant: 한국기술교육대학교 산학협력단
Abstract: PURPOSE: A bidirectional protection coordination testing device of a new energy(sunlight) power source is provided to be used for the system interconnection of various energy power sources by performing a simulation for the protection coordination, voltage variation, power quality of a energy power source based on the system interconnection guide line of the energy power source. CONSTITUTION: A simulated distribution system apparatus contracts an actual distribution system and performs simulation to test and analyze the influence of an energy power source on a system. A surveillance control part includes a function for controlling and analyzing a protection coordination testing device. A protection coordination apparatus offers a protective relay and the high accuracy measurement of electric power distribution facilities. A bidirectional protection coordination testing device consists of a simulated load device, which reduces the load of a system and performs the same function as an actual distribution system.
-
公开(公告)号:KR101532163B1
公开(公告)日:2015-06-26
申请号:KR1020140005249
申请日:2014-01-15
Applicant: 한국기술교육대학교 산학협력단
IPC: H02S50/00
CPC classification number: H02S50/10 , G01R31/3624 , G01R31/40 , G08C19/02 , H01L31/042 , H02S40/38 , Y02E10/50
Abstract: 태양광발전상태진단시스템이개시된다. 본발명에따른태양광발전상태진단시스템은, 적어도하나의행과열로배열되는태양광모듈로이루어지는태양광발전장치에대한상태진단시스템으로서, 상기태양광모듈각각에구비되어, 상기태양광모듈각각으로부터발전량및 일사량을포함하는데이터를센싱하는센싱부, 상기센싱부가센싱한데이터를수신하여전송하는통신부, 상기통신부로부터상기데이터를수신하여저장하는데이터베이스서버및 상기데이터베이스서버에저장되는데이터를이용하여상기태양광모듈각각에대한정상작동여부를판단하는모듈상태진단부를포함한다.
Abstract translation: 公开了一种用于诊断光伏发电机的状况的系统。 根据本发明的用于诊断光伏发电机的状态的系统涉及一种用于诊断由太阳能模块形成的太阳能模块的状态的系统,其布置在至少一行和一列中,并且包括 :设置在每个太阳能模块中的感测单元,感测来自每个太阳能模块的发电量和太阳辐射量的数据; 通信单元,其接收并发送由感测单元感测的数据; 数据库服务器,其接收并存储来自通信单元的数据; 以及模块状态诊断单元,其使用存储在数据库服务器中的数据来确定太阳能模块中的每一个是否正常地操作。
-
公开(公告)号:KR1020110129681A
公开(公告)日:2011-12-02
申请号:KR1020100049196
申请日:2010-05-26
Applicant: 한국기술교육대학교 산학협력단
Abstract: PURPOSE: A bidirectional protection coordination testing device of a new energy(sunlight) power source is provided to be used for the system interconnection of various energy power sources by performing a simulation for the protection coordination, voltage variation, power quality of a energy power source based on the system interconnection guide line of the energy power source. CONSTITUTION: A simulated distribution system apparatus contracts an actual distribution system and performs simulation to test and analyze the influence of an energy power source on a system. A surveillance control part includes a function for controlling and analyzing a protection coordination testing device. A protection coordination apparatus offers a protective relay and the high accuracy measurement of electric power distribution facilities. A bidirectional protection coordination testing device consists of a simulated load device, which reduces the load of a system and performs the same function as an actual distribution system.
Abstract translation: 目的:通过对能源供电源的保护协调,电压变化,电能质量进行仿真,提供新能源(太阳光)电源的双向保护协调测试装置,用于各种能源电源的系统互连 基于能源电源的系统互连引导线。 规定:模拟分配系统装置收集实际分配系统并执行模拟,以测试和分析能量电源对系统的影响。 监视控制部分包括用于控制和分析保护协调测试装置的功能。 保护协调装置提供保护继电器和配电设备的高精度测量。 双向保护协调测试设备由模拟负载设备组成,可减轻系统负载并执行与实际配电系统相同的功能。
-
公开(公告)号:KR101903634B1
公开(公告)日:2018-10-01
申请号:KR1020160131073
申请日:2016-10-11
Applicant: 한국기술교육대학교 산학협력단
IPC: H01L31/042 , H01L31/05 , H01L31/18 , H02S40/30 , H02S50/10
CPC classification number: Y02E10/50 , Y02P70/521
Abstract: 태양광모듈은직렬로연결되는복수의태양전지를포함하는태양전지그룹및 상기태양전지그룹의제1 단에연결되는제1 전극및 상기태양전지그룹의제2 단에연결되는제2 전극을포함하는바이패스다이오드를포함한다. 상기태양전지그룹내의상기태양전지의개수및 상기바이패스다이오드의개수는음영에의한상기태양전지의출력손실및 상기바이패스다이오드의도통손실의합을최소로하도록설정된다.
-
公开(公告)号:KR101415334B1
公开(公告)日:2014-07-04
申请号:KR1020130048609
申请日:2013-04-30
Applicant: 한국기술교육대학교 산학협력단
IPC: G01R31/3183 , G06F9/455
CPC classification number: G01R31/318357 , G01R31/024 , G01R31/085
Abstract: The present invention relates to a simulator for a power receiving and distributing system for a new energy source. The simulator includes: an input unit inputting information on a plurality of equipment installed at the place where the new energy source is received and distributed and an inner line connecting the plurality of equipment; a recognition unit setting an equipment to be measured from the plurality of equipment and recognizing information on the equipment to be measured; a calculation unit calculating a rated normal current and a fault current at the equipment to be measured using the information on the inner line inputted from the input unit and the information on the equipment to be measured which is recognized from the recognition unit; and a display unit displaying the rated normal current and the fault current at the equipment to be measured, which are calculated from the calculation unit, and the information on the inner line.
Abstract translation: 本发明涉及一种用于新能源的受电和分配系统的模拟器。 模拟器包括:输入单元,输入安装在新能源接收和分配的地方的多个设备和连接多个设备的内线的信息; 识别单元,从所述多个设备设定要测量的设备并识别关于待测量设备的信息; 计算单元,使用从输入单元输入的内线上的信息和从识别单元识别的待测量设备的信息,计算待测设备的额定正常电流和故障电流; 以及显示单元,其显示从计算单元计算的待测量设备的额定正常电流和故障电流以及内线上的信息。
-
-
-
-
-
-
-
-